LIFE THIRD COUNTRIES Development and Implementation of an Integrated System for the Control and Monitoring of the Urban Wastewater Treatment Plants in.

Slides:



Advertisements
Similar presentations
MICS4 Survey Design Workshop Multiple Indicator Cluster Surveys Survey Design Workshop The MICS4 Process.
Advertisements

Regional Workshop to disseminate Water Supply and Sanitation Standards of Quality of Service, adapted to LDCs Preparation to the ISO TC 224 Draft Standards.
BULGARIAN COMPETENT AUTHORITIES IN THE FIELD OF IPPC Kalin Iliev Ministry of Environment and Water Bulgaria.
European Commission, DG Environment Brussels, 05 April 2006 Screening of chapter 27 - Environment Dr. Violeta Vinceviciene European Commission DG Environment.
LIFE+ Environment project: LIFE 09 ENV/GR/ Presentation of the LIFE+ project: Strategic Planning Towards Carbon Neutrality in Tourism Accommodation.
“Building Effective Public Participation in Environmental Impact Assessment in a Transboundary Context” in Bulgaria Institute for Ecological Modernisation.
Wenxin Zhang Department of Civic Design University of Liverpool
Republic of Serbia Road Traffic Safety Agency RTSA – Belgrade.
ZHRC/HTI Financial Management Training
Convention of the Protection and Use of Transboundary Watercourses and International Lakes Integrated thematic assessments: outlook on water, data and.
The Knowledge Resources Guide The SUVOT Project Sustainable and Vocational Tourism Rimini, 20 October 2005.
Integrated Control of Industrial and Chemical Substances in Cyprus Integrated Control of Industrial and Chemical Substances in Cyprus Final Conference.
PROJECT BACKGROUND & PROGRESS NIGERIA POLYCHLORINATED BIPHENYLS (PCB S ) MANAGEMENT PROJECT (P )
1 NATIONAL TECHNICAL UNIVERSITY OF ATHENS (NTUA) School of Chemical Engineering Unit of Environmental Science and Technology (UEST) Katherine Haralambous.
Developing a Waste Water Discharge Fee Programme in Sri Lanka Kolitha Himal Muthukuda Arachchi Deputy Director General, Pollution Control Central Environmental.
1 Inspection of LCPs: System for Inspection. ECENA Training Workshop Bristol, March 2008.
OVERVIEW OF INTEGRATED WASTE MANAGEMENT IN WEST AFRICA (IWWA)
Workshop, 12/3/2004 Banska Bystrica – SLOVAC REPUBLIC “INTEGRATED LICENCE PROCEDURE (Greek case)” Katerina Iakovidou-Anastasiadou Hellenic Ministry for.
Presentation of Project’s Timetable and Partners’ Responsibilities National Technical University of Athens Unit of Environmental Science and Technology.
INTERIM MEETING/ VIENNA PART 1 THE STATUS of the PROJECT IMPLEMENTATION.
The Urgent Need for Sustainable Urban Wastewater Treatment and Reuse in the Agricultural Production in the Mediterranean Countries – The MEDAWARE Project:
Health and Safety Policy
SIXTH FRAMEWORK PROGRAMME FP INCO-MPC-1 MEditerranean Development of Innovative Technologies for integrAted waTer managEment.
Tracking of GEF Portfolio: Monitoring and Evaluation of Results Sub-regional Workshop for GEF Focal Points Aaron Zazueta March 2010 Hanoi, Vietnam.
Proposed plan to implement Capacity Development for CDM project in the forthcoming period Dr. DAO DUC TUAN Eng. NGUYEN KHAC HIEU National Office for Climate.
Quality assurance / Quality control system for the Greek GHG emissions inventory Yannis Sarafidis, Elena Georgopoulou UNFCCC Workshop on National Systems.
Ministry of Waters and Environmental Protection, ROMANIA 1 BERCEN 1 st Exchange program – November 2002 Croatia PROBLEMS AND SOLUTIONS IN COOPERATION.
Seminar "Imovinski standard", 29. i 30. lipnja Spatial Planning in Ireland Farannán Tannam, MRICS, Dip.A&F.
1 Permitting of industrial facilities in Croatia.
1 Women Entrepreneurs in Rural Tourism Evaluation Indicators Bristol, November 2010 RG EVANS ASSOCIATES November 2010.
Sub-Regional Workshop for GEF Focal Points in West and Central Africa Accra, Ghana, 9-11 July 2009 Tracking National Portfolios and Assessing Results.
1 Palestinian Integrated Rural Environmental Protection Plan By Hossam Zaqoot June 2005 European Commission LIFE Third Countries Palestinian National Authority.
The MEDAWARE Project 1 st Annual Meeting Tenerife, Dr. Despo Fatta.
State of implementation of the decision III/6f regarding Ukraine (MOP 2, June, , 2008, Riga, Latvia)
SEVERAL ISSUES OF CAPACITY BUILDING FOR CDM IN RESEARCH AGENCIES AND UNIVERSITIES Mr. Nguyen Mong Cuong Institute of Meteorological and Hydrology Mr. Bui.
Pilot Projects on Strengthening Inventory Development and Risk Management-Decision Making for Mercury: A Contribution to the Global Mercury Partnership.
WASTE WATER STATISTICS IN TURKEY Tülay AKICI Environmental Statistics Division State Institute of Statistics, TURKEY April,
Environmental Management Plan (EMP) Required for: Full EIA based on Palestinian EIA Policy Category A projects based on World Bank Policy.
The partnership principle and the European Code of Conduct on Partnership.
Tracking national portfolios and assessing results Sub-regional Workshop for GEF Focal Points in West and Central Africa June 2008, Douala, Cameroon.
Recommendation of the European Parliament and of the Council of 4 April 2001 providing for Minimum Criteria for Environmental Inspections in the Member.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
1 United Nations Economic Commission for Europe 1 ENPI/SEIS Consultation Meeting European Commission, Brussels, 11 November 2010 Current Situation and.
How to start with the implementation of IPPC Directive Czech Republic Czech Environmetal Inspectorate.
World Health Organization
National Agencies’ contribution to the evaluation of Grundtvig Action and to the National Evaluation Report on Socrates Programme Socrates - Grundtvig.
State of Georgia Release Management Training
EVALUATION OF THE SEE SARMa Project. Content Project management structure Internal evaluation External evaluation Evaluation report.
Pilot Project on implementation of SEA for regional planning in Ukraine Prof. Dr. Michael Schmidt Dmitry Palekhov Brandenburg University of Technology.
National Technical University of Athens Unit of Environmental Science and Technology Prof. Maria Loizidou Fotis Kourmousis, PhD candidate LIFE 3 rd countries:
June 2009 Regulation on pesticide statistics Pierre NADIN ESTAT E1- Farms, agro-environment and rural development
5 Project funded by the Euro- Mediterranean Regional Programme for Local Water Management of the European Union DEVELOPMENT OF TOOLS AND GUIDELINES FOR.
Lithuanian Water Suppliers Association LEGAL REGULATION OF WASTEWATER DISPOSAL AND TREATMENT IN LITHUANIA.
School practice Dragica Trivic. FINDINGS AND RECOMMENDATIONS FROM TEMPUS MASTS CONFERENCE in Novi Sad Practice should be seen as an integral part of the.
1 Recent developments in quality related matters in the ESS High level seminar for Eastern Europe, Caucasus and Central Asia countries Claudia Junker,
National Technical University of Athens Unit of Environmental Science and Technology Prof. Maria Loizidou Fotis Kourmousis, PhD candidate Nicosia, 5 th.
CAPACITY DEVELOPMENT for the CLEAN DEVELOPMENT MECHANISM for CAMBODIA (CD4CDM-CAM) National Workshop on Capacity Development for the Clean Development.
Federal Ministry for the Environment, Nature Conservation and Nuclear Safety, Germany Environment Agency (UBA), Germany Federal Agency for Nature Conservation.
PRESENTATION OF MONTENEGRO
Prof. Maria Loizidou Nicosia, Hilton Park Hotel, 15th June, 2006
Fotis Kourmousis Environmental Scientist, PhD candidate
Implementation of the Sustainable Development Goals (SDG) in the Republic of Uzbekistan Geneva, April 12, 2017.
Relationship between EUROWATERNET and the Water Framework Directive, and for broader water reporting Steve Nixon ETC/WTR.
Nick Bonvoisin Secretary to the Convention on the
The role of the ECCP (1) The involvement of all relevant stakeholders – public authorities, economic and social partners and civil society bodies – at.
Dr. Drini Imami Agricultural University of Tirana
The Water Framework Directive: Challenges, Threats and Opportunities
Role of Evaluation coordination group and Capacity Building Projects in Lithuania Vilija Šemetienė Head of Economic Analysis and Evaluation Division.
Presentation transcript:

LIFE THIRD COUNTRIES Development and Implementation of an Integrated System for the Control and Monitoring of the Urban Wastewater Treatment Plants in Cyprus, COMWATER LIFE 02/TCY/CY/019 (01/09/2002 – 28/02/2005) Achilleas Papadopoulos Dr. Chemical Engineer Nicosia, 17 th February 2005

Beneficiary: Water Development Department, Ministry of Agriculture, Natural Resources and Environment of Cyprus Partner: Unit of Environmental Science and Technology, School of Chemical Engineering, National Technical University of Athens IMPLEMENTING AUTHORITIES.

TECHNICAL SECTION Project Synopsis (1/2) General Project Objectives The development and establishment of an integrated system for the effective operation, control and monitoring of the Urban Wastewater Treatment Plants (UWTPs) of Cyprus, sited at the 5 urban centers of the island, the aim being: the harmonization of the Cypriot Legislation with the provisions and requirements of the European Legislation the protection of the natural water recipients of Cyprus from the effects of untreated wastewater discharge the prereservation of natural water resources the promotion of reuse of the treated wastewater

TECHNICAL SECTION Project Synopsis (2/2) Expected Results The operators of the UWTPs obtained the know-how for the control and monitoring of the UWTP operation. They obtained appropriate tools, which enable them to collect and record data in an effective, common and consistent with the European environmental policy way, to assess the effectiveness of the existing operational systems, to determine actions for their improvement and to report representative data to the Water Development Department (WDD). The WDD will have a continuous supervision of the operation of the UWTPs as well as a direct control of the UWTPs compliance with the requirements of the Cypriot and European legislation The WDD has the ability to record all data and to provide the European Commission and Environmental Organizations with reliable and up-to-date data related to the UWTP operation and the urban wastewater management in Cyprus.

TASK 1: Illustration of the existing situation regarding authorities involved in the management of UWTP and the procedures and practices that take place (01/09/2002 – 31/10/2002) Analysis of the existing European and Cypriot legal framework, as well as the International Conventions concerning the urban wastewater management, the UWTP operation and the water management and policy Determination of the quality limits for the reuse of the treated wastewater in agriculture, as they derive from International Practices Complete illustration of all the authorities involved in the management of the UWTP in Cyprus (Water Development Department, Sewage Boards, UWTP operators, Industries discharging into the sewage network, etc.) Tasks Implementation Task 1

Analysis of the responsibilities and obligations of the authorities as they derive from the EC and Cypriot legislation and the International Conventions Evaluation of the effectiveness of the authorities’ network and the procedures taking place - Recommendations for enhancement of the effectiveness of the procedures Illustration of the wastewater treatment systems of Cyprus, i.e. the 5 Urban Wastewater Treatment Plants participated in the project, the treatment plants operating in the rural areas, in governmental and military settlements as well as the ones operating in private developments.

Objectives achieved Task 1 Evaluation of the level of harmonization of the Cypriot Environmental policy and legislation regarding the operation of the UWTP and the management of the urban wastewater with the respective European Environmental policy and legislation Compliance of the actors and authorities involved with the provisions and requirements of the European and Cypriot legislation Complete picture of the existing situation regarding the generation and management of the wastewater generated in urban and rural areas of Cyprus

Objectives achieved Task 1 Illustration of the existing situation concerning the network of actors and authorities involved in the management of the urban wastewater and the operation, control and monitoring of the UWTP as well as their responsibilities Illustration of the procedures that are applied as well as the role of each actor and authority in the design, construction, permitting, operation, control and monitoring of the UWTP – Determination of deficiencies and overlapping of responsibilities – Suggestions for improving and increasing the efficiency and flexibility of these procedures Illustration of the current situation regarding the operation of the UWTP in Cyprus (systems and technology, quality of the untreated and treated wastewater, techniques applied for the management of the treated wastewater, suitability of treated wastewater for reuse etc.)

Tasks Implementation Task 2 TASK 2: Development of guidelines for sampling, measurements and analyses (01/10/2002 – 31/11/2002) 2.1 Development of guidelines for sampling  Development of guidelines concerning the type and volume of samples as well as the way and frequency of sampling. Also, the type and capacity of the samplers and the personnel demands for the execution of samplings have been set  Description of the standard techniques referring to the transfer of the samples to the lab and their preservation  Development of a sampling form and protocol

2.2 Development of guidelines for measurements and analyses Determination of the quality parameters that need to be controlled and monitored Development of guidelines for measurements and analyses, using common standard methods Determination of the personnel demands for carrying out measurements and analyses Development of measurements and analyses form and protocol for data recording Tasks Implementation Task 2

2.3 Determination of the requirements for the safe and effective operation of UWTPs Description and assessment of the existing requirements according to the Cypriot legislation for the discharge of the wastewater into the sewage network Determination of the quality criteria and permissible limits for the safe disposal of the industrial wastewater into the sewage network Tasks Implementation Task 2

Objectives achieved Task 2 Full compliance of the operators of the UWTPs with the provisions and requirements of the European legislation concerning the conduction of sampling, measurements and analyses Adaptation of common standard methods and procedures for sampling, measurements and analyses Control of the industrial wastewater discharged into the sewage network - Avoidance of possible problems that may be caused in the operation of the UWTPs Personnel of the UWTP familiar with the conduction of sampling and measurements, applying standard procedures and methods Adaptation of common procedures for the recording of data by the personnel of the UWTPs

Tasks Implementation Task 3 Task 3: Development of a methodology and software for data recording and operational control of UWTPs (01/12/2002 – 31/05/2003) 3.1 Development of documents (printed material) for the illustration of the UWTP operation Development of an operational protocol Development of a datasheet for the statistical analysis and elaboration of the data Development of an appropriate form for submitting reports to the WDD

3.2 Development of specifications and design of the software for the UWTPs Development of specifications for the software to be installed at the UWTPs - Design of the software interfaces 3.3 Development of specifications and design of the software for the WDD Development of specifications for the software to be installed at the WDD and connected with the software developed at Design of the software interfaces 3.4 Development of specifications and design of the GIS software for the WDD Development of specifications for the GIS to be installed at the WDD and connected on – line with the software developed at 3.3 Tasks Implementation Task 3

Objectives achieved Task 3 Improvement of the recording of operational data with the use of appropriate protocols, datasheets and software by the operators of the UWTP Improvement of the control and monitoring procedure of the five UWTP by the WDD, using of an appropriate software connected with a GIS Use of state –of – the – art technology for the recording and transmission of data

Tasks Implementation Task 4 Task 4: Existing situation concerning the wastewater generation - Conduction of sampling, measurements, analyses- Recording of data ( 01/03/2003 – 30/06/2004) 4.1 Assessment of existing situation regarding the wastewater generation in Cyprus – Determination of the needs for new units Recording of data referring to the wastewater generation in urban and rural areas of Cyprus Analysis of data concerning the existing sewage systems and treatment plants in urban centers and rural areas, private enterprises, military settlements etc. Recording of data referring to the dams of Cyprus, (capacity, use of the water, site location, population in their catchment area etc.) Estimation of the future trends of the wastewater generation

Tasks Implementation Task 4 Determination of the number of the new UWTP required for the cover of the needs of Cyprus and the harmonization with the EC requirements 4.2 Collection and recording of data regarding the operation of the 5 UWTPs - Implementation of sampling, measurements and analyses Collection of data referring to the operation of the 5 UWTP (systems and methods applied, points and frequency of sampling, parameters under examination etc). Recording of data concerning the industrial units discharging their wastewater into the sewage network of each UWTP.

Conduction of sampling, measurements and analyses according to the standard processes and methods developed in task Input of the data collected at subtask 4.2 to the relevant forms and protocols Data collected during task 4.2 were inserted into the forms and protocols Tasks Implementation Task 4

Objectives achieved Task 4 Integrated view concerning the existing wastewater works in Cyprus Determination of the possible pressures and impacts on the surface waters (dams) by discharging of untreated wastewater. Determination of the demands regarding the construction of new treatment units in order to satisfy the needs of the country. Complete and representative data concerning the quality of the untreated and treated wastewater Integrated view related to the efficiency of the wastewater treatment systems – Prevention and/or confrontation of possible problems and deficiencies may be caused at the operation of the UWTPs

Tasks Implementation Task 5 Task 5: Implementation of the methodology and software for data recording by the UWTPs– Implementation of the software for the control and monitoring of the 5 UWTPs by the WDD (01/09/2003 – 31/12/2004) 5.1 Installation and use of the software by the UWTPs Installation of the software at the UWTPs Input of the data collected and recorded from the forms into the software. Analysis and elaboration of data by the personnel of the UWTPs

Tasks Implementation Task Installation and use of the software and GIS by the WDD Installation of the software at the WDD premises – On line connection with the software installed at the UWTPs Use of the software by the personnel of the WDD Installation of a GIS - On line connection with the software installed at the WDD

Objectives achieved Task 5 Continuous control and systematic monitoring of each UWTP operation Continuous and direct supervision of the UWTP environmental performance by the WDD Direct control of the UWTP compliance with the requirements of the national and European legislation Direct and unobstructed provision of data to the WDD by the operators of the UWTP Supporting of WDD to compose complete and representative reports to the European Commission and International Organizations Personnel of the UWTPs and the WDD well trained on the using of state – of - the – art software tools as well as on the control and monitoring of the UWTPs

Tasks Implementation Task 6 TASK 6: Dissemination of the project results – Training activities (01/09/2002 – 28/02/2005) Meetings of the working groups Organization of a Seminar for the information of all actors involved about the project and for the training of the personnel of UWTPs on sampling, measurements and analyses of wastewater Organization of a Seminar for the training of the personnel of UWTPs and the WDD on the use of the software tools Information of representatives from Research Centers, Institutes, Universities,Technical Committees, Organizations, Eurostat, European Environmental Agency etc. about the project results Development and updating of a website describing the project (content, partners, objectives, Tasks, results, deliverables etc.)

Tasks Implementation Task 6 Preparation and distribution of informative printed material Publication in national conference Organization of workshops Organization of an international Conference in Cyprus Preparation and distribution of a leaflet describing the project Preparation and distribution of the proceedings of the Conference

Objectives achieved Task 6 High dissemination level and diffusion of information concerning the content, the results and the benefits gained from the implementation of the project

Task 7: Management and reporting to the European Commission (01/09/2002 – 28/02/2005) 7.1 Effective management of the project and fulfillment of all the activities planned Kick-off meeting of the project Preparation of a list of the key staff needed for the implementation of the project - Determination of the role and responsibilities of each partner Meetings in Cyprus and Greece 7.2 Preparation of reports to the European Commission Two progress reports One Interim report (interim technical report and cost statement) Final report (final technical report and cost statement) Tasks Implementation Task 7

Objectives achieved Task 7 Development of the project with no problems Fulfilment of the obligations for reporting to the EC All the targets set were achieved

STRUCTURE OF THE PROJECT

Integrated System Description