1 Transmission Advisory Group Meeting January 25, 2007 Raleigh, NC.

Slides:



Advertisements
Similar presentations
Al McBride MANAGER, AREA TRANSMISSION PLANNING Existing Import Interfaces: Transmission Transfer Capabilities and The Calculation of Tie Benefits DECEMBER.
Advertisements

March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
October 16, 2009 RPG Meeting ERCOT RPG Project Review Update Jeff Billo.
Company LOGO Cleco Planning Process. Models Cleco uses SPP’s annual series of models to determine the NERC reliability violations. Cleco uses SPP or VST.
La Crosse 161 kV Capacitor Addition Northern MAPP Subregional Planning Group April 3, 2007 Daniel Kline.
Public Service Company of New Mexico
Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power.
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
Houston Region Import Capacity Project August 27, 2013 Regional Planning Group Meeting.
MARCH 31, 2014 Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
WECC PCC Meeting Salt Lake City, UT March 26, 2014.
WECC PCC Meeting Salt Lake City, UT July 16, 2014.
1 Local Area Planning Update to TRANSAC – July 29, 2015 Mitigation Update, Uncertainty Scenarios, and Next Steps.
IMPERIAL VALLEY CONFERENCE July 21, SOLICITATION RENEWABLES PORTFOLIO STANDARD.
Transmission planning in Vermont Past, present and future Docket 7081 workshop By Dean LaForest 9/19/05.
11 TAG Meeting May 18, 2010 ElectriCities Office Raleigh, NC.
111 TAG Meeting June 8, 2015 Teleconference / Webinar FINAL.
11 TAG Meeting December 9, 2009 NCEMC Office Raleigh, NC.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Houston Area Dynamic Reactive Project March 11,
Report on the NCTPC 2006 Collaborative Transmission Plan Mark Byrd, Manager – Transmission Planning Progress Energy Carolinas, Inc January 25, 2007.
JACKSBORO TO WEST DENTON 345-kV PROJECT Presentation to Technical Advisory Committee April 8, 2004 Transmission Services Operations.
ISO Exhibit 13 Federal Energy Regulatory Commission Technical Conference on Connecticut Infrastructure Reliability and Operability Committee Update Hartford,
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
Long Term Study Task Force Update Transmission Study Practices and Methodologies April 5th,2011 LTS.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
Arizona ACC Biennial Transmission Assessment Navajo Transmission Project Update May 22, 2008 Presentation by Ben Hoisington Project Administrator, DPA.
Lyndonville Electric Department Feasibility Analysis Review December 2,
Large Generator Interconnection Procedures Reform Stakeholder Meeting February 19, 2009.
1 TAG Meeting December 4, 2008 NCEMC Office Raleigh, NC.
October 16, 2009 RPG Meeting ERCOT 2009 Five-Year Transmission Plan Update Jeff Billo.
MISO Northwest Exploratory Study Presented to National Wind Coordinating Committee Participants in study – MISO, Various utilities in Minnesota, North.
Local Area Study Local Area Study Mitigation Plan Update and Uncertainty Scenarios
Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX.
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
1 1 1 Central Maine Power Local System Plan Presentation Planning Advisory Committee Meeting November 19, 2008.
Yellowhead Area Transmission System Development
Big Stone II – Delivery Study Phase 6 and Supplemental #2 For Northern MAPP SPG Meeting 4/3/07 Elk River Richard Dahl Missouri River Energy Services.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
1 TAG Meeting May 9, 2008 NCEMC Office Raleigh, NC.
ESI Alternate Economic Study Process E-RSC Meeting October 21, 2010.
Coordinated Planning Concept (For Discussion Only) revised 11/30/04 07/01/04.
September 1, 2011 TAC Lower Rio Grande Valley Regional Planning Group Project Jeff Billo Manager, Mid-Term Planning.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
May14, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
June 26, 2008 Technical Advisory Committee American Electric Power Service Corporation Presidio Area Reliability Improvements Project James Teixeira Manager,
Transmission Advisory Group NCTPC Process Update Rich Wodyka September 7, 2006.
PJM© Market Efficiency RTEP Proposal Window PJM TEAC 1/9/2014 – Market Efficiency Presentation.
2006 Preliminary Reliability Study Results Bryan Guy September 7, 2006.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
DRAFT – FOR DISCUSSION PURPOSES ONLY © 2013 New York Independent System Operator, Inc. All Rights Reserved. EIPC Roll-Up Powerflow Model Zach Smith Director,
Compare and Contrast Reliability Assumptions Bob Pierce May 12, 2006.
1 North Carolina Transmission Planning Collaborative Overview Clay Norris, Chair OSC October 5, 2005.
Reliability Must Run Workshop RMR Study Process May 24, 2016.
ElectriCities Office Raleigh, NC
Freeport Area Master Plan Project -
Progress Briefing - Energy Initiative
Barrilla Junction Area Transmission Improvements Project
Compare and Contrast Reliability Assumptions
Status of the Planning Working Group’s (PWG) Efforts
Local Area Planning Update to TRANSAC – June 29, 2017
SEARUC Conference Little Rock, AR June 4, 2007
I-5 Corridor Reinforcement Project
DEC System Voltage Planning - June 2018
Pacific Power Seismic Preparedness Update
Agenda Provide a recap of primary northern route alternatives for the MPRP Describe basis for selected route N5 Overview of analyses performed Description.
Presentation transcript:

1 Transmission Advisory Group Meeting January 25, 2007 Raleigh, NC

2 TAG Meeting Agenda January 25, Administrative Items NCTPC Transmission Plan Report NCTPC Study Scope Enhanced Access Planning Process TAG Activity Schedule 6.TAG Open Forum

3 Report on the NCTPC 2006 Collaborative Transmission Plan Mark Byrd, Manager – Transmission Planning Progress Energy Carolinas, Inc January 25, 2007

4 Overview of the Report Reliability Planning Results –Base Reliability –Resource Supply Options Collaborative Transmission Plan 2006 North Carolina Transmission Planning Collaborative Report

5 Overview of the Report I.Executive Summary II.North Carolina Transmission Planning Collaborative Process III.2006 Reliability Planning Study Scope & Methodology IV.Reliability Study Results V.Reliability Study (Summary) VI.Collaborative Transmission Plan VII.Conclusions

6 Organizational Structure Oversight / Steering Committee (OSC) Planning Working Group (PWG) Transmission Advisory Group (TAG) Independent Third Party (ITP)

7 Participants jointly: Establish assumptions, criteria, and study methodologies Perform studies: thermal, voltage, stability, short circuit Evaluate results to identify problems and potential solutions Perform cost analysis and rough scheduling of solutions Select preferred final and alternative plans Solicit input from TAG periodically throughout processes Planning Process

8 NCTPC Process Flowchart PWG evaluates reliability problems and current transmission upgrade plans PWG develops and the OSC approves the reliability study scope PWG coordinates the study analysis, identifies reliability problems, develops solutions with estimates of costs and schedules Participants and TAG recommend scenarios and interfaces. The OSC selects interface and scenario studies for analysis PWG coordinates the study analysis, identifies access problems, develops solutions with estimates of costs and schedules Reliability Planning Enhanced Transmission Access Planning OSC selects reliability and enhanced access solutions; checks for improved reliability through enhanced access solutions OSC creates final draft Collaborative Plan Feedback and Iterative Studies Participants and TAG review the reliability study results Participants’ resource planning processes Participants and TAG review the enhanced access study results TAG feedback on final draft Collaborative Plan OSC approves final Collaborative Plan PWG develops and the OSC approves the enhanced access study scope

9 Key Assumptions Study Year and Planning Horizon –Used 2011 Summer for Duke – Progress East –Used 2010/11 Winter for Duke – Progress West –The Plan addresses a 10 year planning horizon through 2016 Network Modeling –Included projected transmission and generation –Included Cliffside (Duke), Anson and Richmond (NCEMC), and Wayne Co. (Progress) future generation Interchange and Generation Dispatch –Each Participant provided resource dispatch order for its Designated Network Resources –Transmission Reliability Margin was modeled for Progress import cases

10 Reliability Planning Study The Scope of the Reliability Planning Study included a base reliability analysis as well as analysis of potential resource supply options The purpose of the base reliability study was to evaluate the transmission system’s ability to meet load growth projected for 2011 through 2016 with the Participants’ planned Designated Network Resources The purpose of the resource supply analysis was to evaluate transmission system impacts for various resource supply options to meet future native load requirements

11 Phase Angle Issue on Richmond- Newport 500 kV Tie This 500 kV interconnection is approximately 80 miles long and carries large amounts of power during high import conditions Closing the line with phase angles greater than 30 degrees creates an unacceptable sudden change of power on the generating units in the electrical vicinity PWG brainstormed potential solutions Progress hired a consultant to assist in researching available technologies Progress has added 500 kV series reactors at Richmond 500 kV Sub to the Plan

12 Summary of Collaborative Plan Comprised of 16 Duke and Progress Projects Only projects with projected cost of $10 million or more are listed Details listed in Appendices B & C List will be updated on an ongoing basis

13 Major Projects from Base Analysis Richmond 500 kV Substation, add 500 kV series reactors Durham 500 kV Substation, the Mayo-Wake 500 kV line will be looped in and one new 500/230 kV transformer bank will be installed Construct Cape Fear-Siler City 230 kV line Rockingham-West End 230 kV line, construct the Wadesboro tap line and the new Rockingham-West End 230 kV East line projects Construct Asheville-Enka 230 kV line and install a new 230/115 kV transformer establishing 230 kV at the Enka 115 kV Substation Increasing the 500/230 kV transformer capacity at the Antioch Substation Bundling of the London Creek (Riverview Switching Station to Peach Valley Tie) 230 kV line

14 Richmond 500 kV Series ReactorJune 1, 2010 Description –Install a 500 kV series reactor at the Richmond 500 kV Substation. –Reactor in series with the Richmond-Newport 500 kV line. Need –To permit closing of the Newport-Richmond 500 kV line at times of high import flow mitigating issues with large post contingency phase angle. Cost –$15 M

15 Durham 500 kV Substation June 1, 2008 Description –Establish 500 kV at the existing Durham 230 kV Substation. –Loop in the Mayo-Wake 500 kV line. –Install 1-500/230 kV transformer bank. Need –With a Harris unit down, an outage of either of the Wake 500/230 kV banks at Wake 500 kV Substation will cause the remaining bank to exceed its rating. Cost –$31 M

16 Cape-Fear – Siler City 230 kV LineJune 1, 2010 Description –Construct 30 miles of new 230 kV line between Cape Fear 230 kV and Siler City 230 kV Substations. Need –An outage of the Harris terminal of the Harris- Asheboro 230 kV line will cause unacceptable voltage in the Asheboro/Ramseur/Siler City area. Cost –$19 M

17 Rockingham-West End 230 kV Line Wadesboro Bowman School 230 kV Tap June 1, 2009 Description –Construct 12 miles of new 230 kV to establish a new tap off of the Rockingham-West End 230 kV Line. –Service to two 115 kV deliveries to be converted to 230 kV. –Uprate a section of the Rockingham-West End 230 kV Line to its full conductor rating between Rockingham and the new tap. Need –With a Harris unit down, an outage of the Rockingham terminal of the Rockingham-Biscoe 230 kV line will cause the Rockingham-Blewett- Tillery 115 kV corridor to exceed its rating. Cost –$13 M

18 Rockingham–West End 230 kV East LineJune 1, 2011 Description –Construct 38 miles of new 230 kV line between Rockingham and West End 230 kV Substations. Need –With a Harris unit down, an outage of the Richmond-Cumberland 500 kV line will cause the existing Rockingham-West End 230 kV line to exceed its rating. Cost –$33 M

19 Asheville-Enka 230 kV LineDecember 1, 2011 Description –Construct 11 miles of new 230 kV line between Asheville 230 kV and Enka 115 kV Substations. –Install 1-230/115 kV transformer at Enka. Need –With an Asheville unit down, an outage of one 230/115 kV transformer at Asheville 230 kV will cause the remaining transformer to exceed its rating. Cost –$15 M

20 Antioch 500/230 kV TransformerJune 1, 2014 Description –Replace the existing 840 MVA 500/230 kV transformers with 1680 MVA transformers. Need –The Antioch banks will achieve 100% of their present rating (840 MVA) in the timeframe. Loss of the parallel bank when there is a generation deficiency in Duke’s northern region causes the highest loading. North to south transfers into the Duke control area increase bank loading and further decrease import capability. Cost –$30 M

21 London Creek 230 kV LineJune 1, 2015 Description –Reconductor 20 miles of the existing 795 ACSR conductor with bundled 795 ACSR conductor between Riverview and Peach Valley 230 kV substations. Need –The London Creek Lines will achieve 100% of their conductor rating in the timeframe. The lines are most heavily loaded when there is an Oconee unit outage for the loss of the parallel line. The line is sensitive to south to north transfers. Increased import from SOCO lowers loading on the London Creek lines and can delay the need for upgrade. Cost –$25 M

22 Resource Supply Option Study Results Transfer FromTransfer ToCapacity (MW) Earliest Resource Supply Option Start Date Nominal Cost ($M) PJM (AEP)Duke TVADuke SOCODuke SCEGDuke SCPSADuke CPLEDuke DukeCPLE SCEGCPLE SCPSACPLE SOCOCPLE TVACPLE PJM (AEP)CPLE PJM (DVP)CPLE PJM (AEP/AEP)Duke/CPLE600/ PJM (AEP/DVP)Duke/CPLE600/ PJM (AEP)CPLW202010/20110

23 Projects Added to Collaborative Plan Add a third Wake 500/230 kV transformer Construct Buck-Asheboro 230 kV line Construct Harris-Durham 230 kV line

24 Wake 500/230 kV Bank #3June 1, 2016 Description –Install a third 500/230 kV 1000 MVA transformer bank at Wake 500 kV Substation. Need –With a Harris unit down, an outage of one of the existing two Wake 500/230 kV banks causes the remaining bank to exceed its rating. Cost –$21 M

25 Buck-Asheboro 230 kV LineJune 1, 2014 Description –Construct 40 miles of new 230 kV line between Duke’s Buck Steam Plant and Progress’ Asheboro 230 kV Substation. Need –Address loadings on Progress’ Badin-Tillery- Biscoe-Asheboro 115 kV corridor and Rockingham-Lilesville 230 kV Lines. Also delays Progress’ need for Cape Fear-Siler City 230 kV line and Harris-Durham 230 kV line. More comprehensive joint study to be conducted. Cost –$40 M

26 Harris-Durham 230 kV LineJune 1, 2016 Description –Conversion of existing 115 kV transmission. –Construction of new 230 kV transmission between Harris and Durham 230 kV Substations. Need –With a Harris unit down, an outage of the common tower Method-East Durham 230 kV line and Method-Durham 230 kV line causes the Cary Regency Park-Durham 230 kV line to exceed its rating. Cost –$88 M

27 Benefits of the Process Insight into the neighboring system’s modeling approaches, including resource assumptions, contingencies evaluated and system dispatch assumptions Higher confidence in and understanding of data provided by all Participants, including more detailed and timely information shared Improved understanding of the neighboring transmission system, including its strengths and weaknesses and the relationship of impacts between the two transmission systems Shared technical and planning expertise that resulted in improved modeling, more comprehensive evaluation of the impact of generation and transmission contingencies, and consideration of more extensive sets of solutions More comprehensive approach to developing solutions to address not only reliability, but also to increase access to alternative resource supply options for LSEs

28 Questions?

29 NCTPC 2007 Study Scope Rich Wodyka January 25, 2007

30  Assess Duke and Progress transmission systems' reliability and to develop a single Collaborative Transmission Plan  Also assess Enhanced Access Options provided by Participants or TAG members Purpose of Study

31 NCTPC Process Flowchart PWG evaluates reliability problems and current transmission upgrade plans PWG develops and the OSC approves the reliability study scope PWG coordinates the study analysis, identifies reliability problems, develops solutions with estimates of costs and schedules Participants and TAG recommend scenarios and interfaces. The OSC selects interface and scenario studies for analysis PWG coordinates the study analysis, identifies access problems, develops solutions with estimates of costs and schedules Reliability Planning Enhanced Transmission Access Planning OSC selects reliability and enhanced access solutions; checks for improved reliability through enhanced access solutions OSC creates final draft Collaborative Plan Feedback and Iterative Studies Participants and TAG review the reliability study results Participants’ resource planning processes Participants and TAG review the enhanced access study results TAG feedback on final draft Collaborative Plan OSC approves final Collaborative Plan PWG develops and the OSC approves the enhanced access study scope

32  Duke and Progress shared their planning practices and criteria among Participants  PWG identified many similarities and some differences - all comply with NERC reliability standards and SERC requirements  Will continue to evaluate the differences and examine potential common planning practices and criteria that will be used in future studies Transmission System Planning

33 1.Assumptions Selected 2.Study Criteria Established 3.Models and Cases Developed 4.Study Methodologies Selected 5.Technical Analysis Performed 6.Problems Identified and Solutions Developed 7.Collaborative Plan Projects Selected 8.Study Report Prepared Overview of the Study Process

34  Study Year Summer and 2011/2012 Winter for near term reliability analysis  Study Year Summer for longer term reliability analysis  All LSEs provide input for load forecasts and resource supply assumptions  Dispatch order for resources provided by LSEs  Coordinated interchange between Participants and neighboring systems Study Assumptions Selected

35 Study Criteria Established  NERC Reliability Standards  SERC Requirements  Individual company criteria

36  Latest available MMWG or VSTE cases are selected / updated for study years  Combined detailed model for Duke and Progress is prepared  Planned transmission additions from 2006 Collaborative Plan are included  Case scenarios are established Models and Cases Developed

37 Study Methodologies Selected  Thermal Power Flow Analysis Duke and Progress Contingencies Duke and Progress Monitored Elements  Voltage, stability, short circuit, phase angle analysis is performed as needed

38 Technical Analysis Performed  Assessment of transmission reliability and enhanced access scenarios Problems Identified and Solutions Developed  Identify limitations and develop potential alternative solutions for further testing and evaluation  Estimate project costs and schedule

39 Collaborative Plan Projects Selected  Compare all alternatives and select preferred solutions Study Report Prepared  Prepare draft report and distribute to TAG for review and comment

40 1 st Quarter 2 nd Quarter3 rd Quarter 4 th Quarter Enhanced Access Planning Process Coordinated Plan Development  Perform analysis, identify problems, and develop solutions  Review Reliability Study Results  Evaluate current reliability problems and transmission upgrade plans  Propose and select enhanced access scenarios and interface  Perform analysis, identify problems, and develop solutions  Review Enhanced Access Study Results Reliability Planning Process  OSC publishes DRAFT Plan  TAG review and comment  Combine Reliability and Enhanced Results 2007 Overview Schedule TAG Meetings

41 Questions? or Comments

42 Transmission Advisory Group Enhanced Transmission Access Planning Pam Kozlowski January 25, 2007

43 PURPOSE - Evaluate the means to increase transmission access to potential resources inside and outside the control areas of Duke and Progress to serve load in NC. FIRST STEP - Participants and TAG members propose scenarios and interfaces to be studied. Enhanced Transmission Access Planning

44 NCTPC Process Flowchart PWG evaluates reliability problems and current transmission upgrade plans PWG develops and the OSC approves the reliability study scope PWG coordinates the study analysis, identifies reliability problems, develops solutions with estimates of costs and schedules Participants and TAG recommend scenarios and interfaces. The OSC selects interface and scenario studies for analysis PWG coordinates the study analysis, identifies access problems, develops solutions with estimates of costs and schedules Reliability Planning Enhanced Transmission Access Planning OSC selects reliability and enhanced access solutions; checks for improved reliability through enhanced access solutions OSC creates final draft Collaborative Plan Feedback and Iterative Studies Participants and TAG review the reliability study results Participants’ resource planning processes Participants and TAG review the enhanced access study results TAG feedback on final draft Collaborative Plan OSC approves final Collaborative Plan PWG develops and the OSC approves the enhanced access study scope

45 Enhanced Transmission Access Option Form – Part 1 Date of Submittal Submitting Company Company Contact Contact Phone Number Contact Address

46 Sink 1. Specify Duke, CPLE, or CPLW as the sink control area. 2. Specify LSE, if applicable. Source 1. Specify the source control area. 2. Specify if the transaction is a system purchase or purchase from a specific generator(s). If from a specific generator(s), provide location of the generator for proper modeling. Attach interconnection one-line diagram as necessary. Point-of-Receipt/Point-of Delivery Path: (Examples: AEP/DUK – DUK/CPLE; SCEG/CPLE; SOCO/DUK) Maximum Capacity in MW Summer Winter Start date End date, if applicable Purpose and benefit for this study request. Enhanced Transmission Access Option Form – Part 2

47 TAG Responses – Due by February 14, Forms to: Pam Kozlowski, Gestalt LLC PWG reviews all proposed scenarios / interfaces and provides OSC a recommendation on the Enhanced Transmission Access Options for analysis in 2007 OSC to provide TAG feedback by end of March 2007 Enhanced Transmission Access Planning

48 Enhanced Transmission Access Planning – TAG Input QUESTIONS ? or COMMENTS

49 Transmission Advisory Group 2007 Activity Schedule Rich Wodyka January 25, 2007

50 Receive presentation on the 2006 Collaborative Transmission Plan results and provide comments Provide comments on the NCTPC Process Review and comment on the 2007 Study Scope Review and comment on the 2007 TAG Activity Schedule Provide input on proposed Enhanced Transmission Access scenarios and interfaces for study and receive feedback from OSC Receive and comment on the 2006 Supplemental Study Report st Quarter Activities

nd Quarter Activities Receive presentation on the 2006 Supplemental Study Report and provide comments to the OSC Provide feedback to the OSC on the Enhanced Transmission Access scenarios and interfaces selected for analysis in 2007 Receive a progress report on the 2007 Planning study activities and results TAG Meeting in April 2007

rd Quarter Activities Receive a progress report on the Reliability Planning studies and the Enhanced Transmission Access Planning studies TAG meeting in September 2007

th Quarter Activities Receive and review a final draft of the 2007 Collaborative Transmission Plan report January TAG meeting to receive a presentation on the 2007 Collaborative Transmission Plan results and provide comments to the OSC

54 TAG 2007 Activity Schedule QUESTIONS ? or COMMENTS

55 TAG Open Forum Discuss any items relevant to the NCTPC Process Comments or Questions