3gERP workshop Copenhagen 17-18 November 20081 ERP systems implementation: Factors influencing selection of a specific approach? Björn Johansson Frantisek.

Slides:



Advertisements
Similar presentations
Moving towards implementation on country level… Building on the PEP paper Linking Poverty Reduction and Water Management Poverty, Wealth and Water (PWW)
Advertisements

Introduction to the Feedback Loop Note: this presentation is based on the MicroSave publication: The Feedback Loop – A process for Enhancing responsiveness.
How to Transfer from Waterfall to Iterative Te Bai, Ji Qi.
Implementation of waste management plans in [country] 2013 workshop on Waste Policy Implementation May 2013 Copenhagen.
Significance Testing.  A statistical method that uses sample data to evaluate a hypothesis about a population  1. State a hypothesis  2. Use the hypothesis.
Sam Babcock Austin Carter Liam Kane Cary Konopka.
System Development Life Cycle Process of creating and altering systems or software by using methodologies or models to develop the systems in a logical.
Transport for Luton and South Bedfordshire A way forward This presentation is prepared following the conclusions of an earlier Transport summit. Manouchehr.
1 McGraw-Hill/Irwin Copyright © 2004, The McGraw-Hill Companies, Inc. All rights reserved. Information Systems Development – The System Approach 1. “System.
Chapter 15 Health Care Information Systems: A Practical Approach for Health Care Management 2nd Edition Wager ~ Lee ~ Glaser.
Objectives When developing products, product developers have a large influence on a product’s life cycle, e.g. on how the product is produced and which.
IN THE NEW PARADIGMS OF BUSINESS MANAGEMENT. ENTERPRISE RESOURCE PLANNING What is ERP? Business Challenges Today Why purchase an ERP solution ? Intway.
Enterprise Resource Planning (ERP) Systems
61 What is hazard risk management?. 62 Emergency risk management is “a systematic process that produces a range of measures that contribute to the well.
Module 8 – Organizing for Action
Business Process Re-engineering: A Critical Success Factor in Implementation of Enterprise Resource Planning Presented by: Jasmin S. Ponce.
Session No. 3 ICAO Safety Management Standards ICAO SMS Framework
System Development Life Cycle
Partnership Results of the workshop. Country experience of the programming process Country experience: –Ministry and regional authorities have been included.
AQIP ACADEMIC QUALITY IMPROVEMENT PROGRAM The Higher Learning Commission’s Program for Systematic Improvement and Continuing Accreditation.
Organizational competence in harnessing IS/IT
1 Customer Relationship Management (CRM): The Business Focus.
Integrated Health System Planning An exclusive Executive Circle Briefing.
Team-Based Inquiry ASTC Preconference Workshop, October 18
DGM07: Research Methodology SESSION 1 April 2, 2011 Dr. Naseem Abidi.
Medical Device Security Successful Implementation of ERP Name Class Course.
Enterprise Risk Management Chapter One Prepared by: Raval, Fichadia Raval Fichadia John Wiley & Sons, Inc
The World Bank Working for a World Free of Poverty.
1 Total Cost of ERP Systems Implementation in Danish, Slovak and Slovenian Companies Frantisek Sudzina Björn Johansson CAICT, Copenhagen Business School.
Mainstreaming Conflict Prevention into UNDP Policies and Programs JPO Workshop November 2007 Bangkok.
Managing Human Resource Learning for Innovation Managing Human Resource Learning for Innovation an empirical founded model of employee driven innovation.
GCIO Summit Wrap up and way forward Lee Naik - Accenture.
“As you go to work, your top responsibility should be to build trust” – Robert Eckert, CEO Mattel Building a Culture of Trust J’NE HINGER, VP ALLERGAN,
Software Project Management Iterative Model & Spiral Model.
ä Online permit applications in Michigan are taking a major step toward an integrated one-stop process.
Impact of the inter-firm cooperation on company's performance: major changes during the economic crisis November 27, 2013 Oksana Kabakova.
What is the role of entrepreneurship in a country’s economy?
ISIS Project Status Report May 18, 2006 Prepared by MAXIMUS, Inc Education Systems Division for the ABT Committee.
Real Case Aircraft Company Top Level Decision Making for CAD CAM Support Systems As Experienced and Consulted for by Tom Gilb.
School Management And Resource Training Directorate of Primary Education Western Thessaloniki Athina Kallara Primary School Adviser Comenius Regio
CAF lessons from Ministry of Education and Research of Estonia 6th European CAF Event Rome, 14 november 2014 Birgit Lao-Peetersoo Head of Management Board.
Paula Serdeira Azevedo (1) Carlos Azevedo (2) Mário Romão (3)
Custom Designed ERP Systems Development & Implementation of Two Cases in Services & Manufacturing A Comparative Review of Two Case Studies During; Development,
BUS 611 Week 6 Final Research Paper To purchase this material link Week-6-Final-Research-Paper Focus of.
Challenges and opportunities for the CFO
Vietnam Education system overview
The big enlargement: healing the division of Europe
SAP Value Assurance plan and safeguard service package for SAP SuccessFactors HCM Suite Business Needs Need to follow leading practices and reduce risk.
Accessibility Patterns, Transport Infrastructure
Module 5 closing and evaluation
Epilog © Len Bass, Paul Clements, Rick Kazman, distributed under Creative Commons Attribution License.
ENTERPRISE RESOURCE PLANNING- ERP UNIT-1 INTRODUCTION Overview of Enterprise System Evolution Risks and Benefits Fundamental Technology Issues to be consider.
Auditing Application Controls
Enterprise Resource Planning (ERP)
Emerging Wind Energy Market Pakistan
Delivering Value for Money
30 November 2018 Saudi International SMEs Forum SME’s in Germany Presentation by Ashok Aram CEO Deutsche Bank AG Middle East & North Africa May 2013.
Ryan Armstrong Alex Brown Andrea Miller
e-Skills ; Measurement
The Importance of Informal Sector Statistics
Do educational innovation projects lead to quality improvement?
Climate Change, Ozone and Energy Unit
Horizontal Guidance on Wetlands Rome, 12nd June
MAZARS’ CONSULTING PRACTICE Helping your Business Venture Further
WG 2.B Integrated River Basin Management
Enterprise Resource Planning (ERP) Systems
The big enlargement: uniting east and west
Principles of an ERP Implementation
WP8: Corruption, assistance and development Prof
Risk Analysis Objectives Discuss the importance of Risk Analysis
Presentation transcript:

3gERP workshop Copenhagen November ERP systems implementation: Factors influencing selection of a specific approach? Björn Johansson Frantisek Sudzina Center for Applied ICT, Copenhagen Business School

2 3gERP workshop Copenhagen November 2008 Questions Asked? What makes an organization select a specific approach when implementing ERPs? In what way do specific factors influence selection of a specific approach when implementing ERPs?

3 3gERP workshop Copenhagen November 2008 So the paper is about: ERP implementation Different approaches for how it could be done Factors influencing the selection Results and discussion Conclusions and some thoughts about future research

ERP implementation Implementation (or deployment) of ERPs is both complex and costly In the paper we define it as ”the way how organizations systematically integrate ERPs into the specific organization” It can be done in different ways 4 3gERP workshop Copenhagen November 2008

ERP Implementation approaches Slow phase one module at a time Pilot project implementing one module followed by all other modules in one step Big bang Implementing all ERP software modules at the same time 5 3gERP workshop Copenhagen November 2008

Influencing factors Growth Economic development between Organizational size Employees 250+, 50 – 249, <50 IS/IT strategy Formal strategy yes or no CIO Asked about presence by IT professionals at board level yes or no Country Denmark, Slovakia, Slovenia 6 3gERP workshop Copenhagen November 2008

Results and discussion, Growth Influencing factor Implementation approach Growth Slow phased Pilot project Big bang Reduction in turnover40%30% Stable turnover24%16%60% Growth of 0-5%31%22%49% Growth of 5-10%42%8%50% Growth of 10%+23%30%48% 7 3gERP workshop Copenhagen November 2008

Results and discussion, Organizational size Influencing factor Implementation approach Organizational size Slow phased Pilot project Big bang Large27%18%55% Midsized25%28%47% Small35%21%44% 8 3gERP workshop Copenhagen November 2008

Results and discussion, IS/IT strategy Influencing factor Implementation approach IS/IT strategy Slow phasedPilot project Big bang Yes23%24%53% No35%17%48% 9 3gERP workshop Copenhagen November 2008

Results and discussion, CIO (presence by IT professionals in the board) Influencing factor Implementation approach CIO Slow phasedPilot project Big bang With CIO23%26%51% Without CIO33%16%51% 10 3gERP workshop Copenhagen November 2008

Results and discussion, Country Influencing factor Implementation approach Country Slow phasedPilot project Big bang Denmark19%25%56% Slovakia27%19%52% Slovenia30%22%48% 11 3gERP workshop Copenhagen November 2008

Conclusions and some thoughts about future research No clear significant relationship between suggested factors and implementation approach Despite reported risks with Big bang implementation it is the most dominant implementation approach Investigate Vendor/product influence on ERP implementation Further investigate factors influence on implementation approach (look after patterns) 12 3gERP workshop Copenhagen November 2008

13 3gERP workshop Copenhagen November 2008 Questions and Comments