Technical Meeting 11.12.2009 Closure 2000-06: Winding-up declaration Commission Audit Approach Mark Schelfhout DG EMPL/I/4.

Slides:



Advertisements
Similar presentations
Legal Basis for Management and Control Systems in INTERREG III programmes BSR INTERREG III B Joint Secretariat Matthias Heinicke Seminar on Financial Management.
Advertisements

European Commission DG Agriculture and Rural Development
CLEARANCE OF ACCOUNTS IN RURAL DEVELOPMENT PROGRAMMES RICHARD CROFT.
EN DG Regional Policy EUROPEAN COMMISSION Brussels, 11 October 2007 Management and control arrangements OPEN DAYS 2007 Financial Control : New.
Regional Policy EUROPEAN COMMISSION OPEN DAYS 2006 The European Week of Regions and Cities Brussels, 9 – 12 October 2006 _________________________ Workshop.
EUROPEAN COMMISSION Social and economic cohesion OPEN DAYS 2006 The European Week of Regions and Cities Brussels, 9 – 12 October 2006 _________________________.
OPEN DAYS 2006 The European Week of Regions and Cities Brussels, 9 – 12 October 2006 _______________________ Workshop 11E18: Structural Funds 2007 – 13:
2 Slovenia Signed Contract of Confidence for the period Compliance assessment for one programme for the new period Experience of a Certifying.
Click to edit Master title style 1 How to produce a good final report ? How to treat unfinished, non- operational or suspended projects? Commissions views.
Click to edit Master title style 1 Winding-Up Declaration (WuD) How to prepare a reliable winding- up declaration: Commissions views European Commission.
THE CERTIFYING AUTHORITY
Management and control systems Franck Sébert, DG Regional and Urban Policy, Head of Unit C1 SEVENTEENTH MEETING OF THE EXPERT GROUP ON.
1 FINANCIAL CONTROL OF STRUCTURAL FUNDS Nicholas MARTYN European Commission DG Financial Control 5June 2000.
Final Report Anton Schrag REGIO D1
The Managing Authority –Keystone of the Control System
Management and control systems Franck Sébert, DG Regional and Urban Policy, Head of Unit C1 FOURTEENTH MEETING OF THE EXPERT GROUP ON.
Regional Policy EUROPEAN COMMISSION OPEN DAYS 2006 The European Week of Regions and Cities Brussels, 9 – 12 October 2006 _________________________ Workshop.
Public Procurement ESF ECA DAS 2011 Case studies
“Train the trainers” seminar
A d d V Alue to public management Winding-up declaration Portuguese experience Carlos Trigacheiro Inspecção-Geral de Finanças (IGF) General Inspection.
Management and control systems Franck Sébert, DG Regional and Urban Policy, Head of Unit C1 SEVENTEENTH MEETING OF THE EXPERT GROUP ON.
1 Technical Meeting Closure : Winding-up declaration and Commission procedures Elina Hakonen-Meddings DG REGIO J4 Technical Meeting on.
Towards reform of the EU Budget _________________________________________________________________________________Accountability, the aching tooth ? European.
1 Managing Authority Conducting a self assessment 10 June 2008 A. Badrichani – DG Regional Policy – Audit Unit J3.
EUROPEAN COMMISSION Social and economic cohesion OPEN DAYS 2006 The European Week of Regions and Cities Brussels, 9 – 12 October 2006 _________________________.
Management verifications Franck Sébert European Commission DG Employment, Social Affairs and Equal Opportunities.
Financial Management and Control Annual Meeting of ISPA PARTNERS 2003 Preparation for post-accession Management of Community Funds : Nicholas Martyn Regional.
European Union Cohesion Policy
1 Reporting data on irregularities European Union Cohesion Policy Leif Högnäs REGIO J1 Technical Meeting on Closure , 11 December 2009.
AUDIT AND CONTROL UNIT EUROPEAN REGIONAL DEVELOPMENT FUND (ERDF) AND COHESION FUND (CF) QUIRINO MEALHA DIRECTOR.
10/04/20081 TWG of ESF Committee 10 April 2008 Franck Sébert Head of unit DG EMPL/I/1 Relations with Control Authorities Action plan to strengthen the.
Presentation to COCOBU on 4 October 2007 by Josef Bonnici The Commission’s Annual Activity Reports A tool for improved governance European Court of Auditors.
Winding-up Declaration and Audit Requirements at the Closure of INTERREG III programmes ( ) Directorate General Regional Policy Audit and.
RELATIONSHIP BETWEEN THE MANAGING AUTHORITIES AND THE PAYING AGENCIES IN THE MANAGEMENT OF RURAL DEVELOPMENT PROGRAMMES Felix Lozano, Head of.
AUDITING COHESION AND STRUCTURAL FUNDS IN SLOVENIA Nataša Prah Ljubljana, 
Annual Examination Meeting Audit Authority 13 September 2011.
Single Audit Strategy LATVIA. Audit System The Audit Authority functions are carried out by the Internal Audit Department of the Ministry of.
ESIF Business Process and Simplification Nic Suggit Department of Communities and Local Government 24 April 2014.
The verification of public investments.
ESPON 2013 Programme 3 rd Financial Managers Seminar Brussels 19 May 2010.
Report about controlling activity and its results in the programme in 2013 TOP Monitoring Committee Meeting
Risk analysis (UVER) Luigi Guerci. Public Investment Verification Unit (UVER) The organisational principles at the foundation of the management and control.
1 INTERREG IIIB “ATLANTIC AREA” Main points of community regulation 438/2001 financial management and control systems EUROPEAN COMMISSION SPAIN.
SEMINAR on the EEA Financial Mechanism THE EUROPEAN COMMISSION DIRECTORATE- GENERAL REGIONAL POLICY Brussels 13 June 2005 Control and Audit Nicholas Martyn.
How does the ECA assess Member States’ internal control systems? Workshop on Audit/Evaluation of Public Internal Financial Control Systems (PIFC) Ankara,
1 Homologues Group Meeting Slovenia, October 2009 Republika SlovenijaEuropean Union Ljubljana, October 2009 Implementation of Article 73 Ljubljana,
1 Homologues Group Meeting Slovenia, October 2009 Republika SlovenijaEuropean Union Ljubljana, October 2009 Risk of Error on Closure Ljubljana,
Audit Authority and Auditors Group of “European Territorial Cooperation” Programmes for Lessons to be learnt from the INTERREG IIIB NWE Auditors.
POVT Managing Authority A sound Internal Control System A challenge for the period.
Regional Policy Management and control systems Draft Delegated Act Franck Sébert, DG Regional and Urban Policy, Head of Unit C1 TWENTY-FOURTH.
Regional Policy Management and control systems Franck Sébert, DG Regional and Urban Policy, Head of Unit C1 NINETEENTH MEETING OF THE EXPERT.
29 March 2011 Audit Authority Audit Department Ministry of Finance 1.
Click to edit Master title style 1 WINDING-UP DECLARATION Practical experience PORTUGAL Carlos Trigacheiro Inspecção-Geral de Finanças (IGF) General Inspection.
Structural Funds in Ireland Structural Funds in Ireland Financial management, Financial management, control & audit - Ireland Dermot Byrne Head of Unit.
Closure of the Programming Period ESF TWG Luxemburg 2 nd December 2015.
Structural Funds in Ireland Structural Funds in Ireland Financial control & audit - Financial control & audit - ERDF & Cohesion Fund operations Dermot.
EN EUROPEAN COMMISSION Budgetary Control Committee of European Parliament Budgetary Control Committee of European Parliament Brian Gray DG BUDGET Workshop.
© Shutterstock - olly Simplified Costs Options (SCOs) The audit point of view.
EN DG Regional Policy & DG Employment, Social Affairs & Equal Opportunities EUROPEAN COMMISSION Luxembourg, May 2007 Risk assessment and planning.
Regional Policy Management and control systems Franck Sébert, DG Regional and Urban Policy, Head of Unit C1 NINETEENTH MEETING OF THE EXPERT.
Experiences of Audits of the European Commission in the Region of Saxony-Anhalt Mechthild v. Maydell Head of the Audit Authority for the Region of Saxony-Anhalt.
The Audit Authority The Netherlands Meeting AA Italy June 10th 2010
ARACHNE Risk scoring tool
Draft Guidance Note on management verifications
Objectives Assess the ability and reliability of data management systems; Verify the reliability and completeness of reported data, including micro-data,
Management and control & financial corrections
Management Verifications & Sampling Methods
Nicholas Martyn DG Regional Policy
Commission Regulation (EC)
Presentation transcript:

Technical Meeting 11.12.2009 Closure 2000-06: Winding-up declaration Commission Audit Approach Mark Schelfhout DG EMPL/I/4

Audit of W-U Declaration Content: Current state of play; Analysis of the W-U declaration; Risk assessment criteria; On-the-spot work; Standard conclusions and follow-up procedures; Questions/observations.

Current State of play Enquiry Planning Memorandum for closure of Assistance 2000-2006 finalised; 2009 country fiches to include: Results of EC audits; Results of ECA audits; Results of Article 13 reports; Results of national audit reports; Information from co-ordination meetings; Existence of a Contract of Confidence.

Analysis of the W-U Declaration Admissibility check including blocking factors; Quality review checklist – 7 sections: Basic requirements of the declaration; System audits; Sample checks; Work carried out by the W-U body; Audits by other national or Community bodies; Frequency of errors and irregularities; Analysis of observations and conclusion.

Risk Assessment Criteria Comparison between W-U declaration and country fiche; Risk assessment on each section; Risk criteria vary from ‘High’, ‘Medium’, ‘Low’ and ‘Very Low’ residual risk Overall assessment on the basis of total outcome of each section combined with Auditor’s judgement.

On-the-spot work Focus on winding-up activities; Verification of: Quality, quantity and completeness of procedures; Coherence between findings and conclusions; Correct identification of basis for conclusion; Correct identification of detail of irregularities; Correct assessment of financial impact; In principle, NO audit of MCS of MA/PA

Standard conclusions and follow-up procedures Unqualified opinion: the W-U declaration is accepted; Qualified opinion: Open issues/questions to be resolved; Extra work to be performed; Financial corrections on flat-rate basis may be applied; Adverse opinion:

Questions/observations?