Records Registration Management System The HOB Capstone Project.

Slides:



Advertisements
Similar presentations
Testing Relational Database
Advertisements

Making the System Operational
National Database Templates for the Biosafety Clearing-House Application (NDT-nBCH) Overview of the US nBCH Applications.
MS Access.
Prepare Understand the accommodation process & choose level of engagement. Engage Follow procedures for receiving accommodations.
ATC Conference Call January 10, 2008 Thank you for joining the call. We will start the call shortly. Please enter * 6 to mute your line and # 6 to unmute.
Beta Testing: The Contractor’s Perspective Trns·port User Group Meeting October 2005.
System Construction and Implementation Objectives:
Software Modeling SWE5441 Lecture 3 Eng. Mohammed Timraz
CONDO MANAGER The Leader in Association Accounting and Management Software Mailing Address: P.O. Box Charlotte, North Carolina Web Site
Please note: Our website changes periodically. The screen and link examples in this presentation may appear slightly differently. Harford County Public.
ECM RFP 101 Presented by: Carol Mitchell C.M. Mitchell Consulting.
1 Arizona Grade 8 Science Online Field Test Test Administrator Training March 23 – April 2, 2007.
STREAMLINING DATA INPUT FOR HRMS USING ROBOT Session Number 1027 presented by Sandra Hurlburt and Alice Pelkman.
CSE 4939 Alex Riordan Brian Pruitt-Goddard Remote Unit Testing.
Calendar Browser is a groupware used for booking all kinds of resources within an organization. Calendar Browser is installed on a file server and in a.
Quality is about testing early and testing often Joe Apuzzo, Ngozi Nwana, Sweety Varghese Student/Faculty Research Day CSIS Pace University May 6th, 2005.
ECM Project Roles and Responsibilities
Systems Analysis and Design in a Changing World, 6th Edition
Effort in hours Duration Over Weeks Or Months Inception Launch Web Lifecycle Methodology Maintenance Phases Copyright Wonderlane Studios.
Supervisor: Mr. Huynh Anh Dung Students: To Quang Duy Pham Ngoc Tien Nguyen Luong Ngoc Chau Nguyen Hoang Phuc Nguyen Thi Trang.
CrackingSiebel.com Utility Siebel Repository Extract (SRE) Tool.
Supervisor: Mr. Huynh Anh Dung Students: To Quang Duy Pham Ngoc Tien Nguyen Luong Ngoc Chau Nguyen Hoang Phuc Nguyen Thi Trang.
© 2009 GroundWork Open Source, Inc. PROPRIETARY INFORMATION: Information contained herein is not for use or disclosure outside of GroundWork Open Source,
Effective Methods for Software and Systems Integration
SmartLog X 3 TEAM Basic SmartLog X 3 TEAM Basic DescoEMIT.com USER STATUS USER EDIT TEST LOG ADMIN TEST MACHINE SCHEDULE INSTALL System Requirements:
Getting started with for students before you register Make sure you have: an active account Internet browser installed on your computer Student.
1 These materials are prepared only for the students enrolled in the course Distributed Software Development (DSD) at the Department of Computer Science.
Getting ready for the future: Preparing for the KS3 ICT onscreen test Sue Walton Project Director, KS3 ICT onscreen test development project Luton March.
KFC VIETNAM ORDER SYSTEM
In addition to Word, Excel, PowerPoint, and Access, Microsoft Office® 2013 includes additional applications, including Outlook, OneNote, and Office Web.
Course Presentation EEL5881, Fall, 2003 Project: Network Reliability Tests Project: Network Reliability Tests Team: Gladiator Team: Gladiator Shuxin Li.
Next Doc Project Team: xxxxx Spring TitlePage Scope Statement Mission Statement3 Business Need4 Project Description5-6 Project Lifecycle Approach7.
End HomeWelcome! The Software Development Process.
ITEC 275 Computer Networks – Switching, Routing, and WANs Week 12 Chapter 14 Robert D’Andrea Some slides provide by Priscilla Oppenheimer and used with.
Statistics Monitor of SPMSII Warrior Team Pu Su Heng Tan Kening Zhang.
TEACHER FEEDBACK WEBSITE HTVN TEAM. AGENDA 1.TEAM INTRDUCTION 2.PROJECT OVERVIEW 3.PLAN 4.PRODUCT ARCHITECTURE 5.DATABASE DESIGN 6.TEST PLAN & TEST REPORT.
1 ADP Algebra II End-Of-Course Online Field Test Test Administrator Training September, 2007.
1 SMART Training Update – May 2011 Michaela Butterworth.
Company LOGO Team assignment 03 Team 04 K15T02. Members… 1.Hoàng Thị Kim Dâng 2.Thái Thanh Nhã 3.Trần Thị Mộng Hà 4.Trần Tiễn Hưng 5.Chu Thị Thu Hương.
CIS101 Introduction to Computing Week 01. Agenda What is CIS101? Class Introductions Using your Pace Introduction to Blackboard and online learning.
Dec07-02: Prototype Parking Meter Phase 8 Bret Schuring: Team Leader Pooja Ramesh: Communications Wilson Kwong, Matt Swanson, Alex Wernli.
KFC VIETNAM ORDER SYSTEM HTC TEAM. AGENDA 1.TEAM INTRODUCTION 2.PROJECT OVERVIEW 3.PLAN 4.PRODUCT ARCHITECTURE 5.DATABASE DESIGN 6.TEST PLAN & TEST REPORT.
These materials are prepared only for the students enrolled in the course Distributed Software Development (DSD) at the Department of Computer Science.
Jan 2015 iServ OfficeServ Operator Essential for business operators, receptionists, and people who manage high volume on calls, the iServ OfficeServ Operator.
Company LOGO Team assignment 03 Team 04 K15T02. Members… 1.Hoàng Thị Kim Dâng 2.Thái Thanh Nhã 3.Trần Thị Mộng Hà 4.Trần Tiễn Hưng 5.Chu Thị Thu Hương.
1 Acceptance Test Presentation Client Dr. Darren Lim 4/27/2010.
Bina Nusantara 19 C H A P T E R SYSTEM CONSTRUCTION AND IMPLEMENTATION.
Capstone Project 1. Sales Management Support System Supervisor: Mr. Ngô Đ ă ng Hà An Group Members: Trần Vĩnh Phúc Nguyễn Hoàng Đức Ngô Tuấn Kiệp Võ Minh.
Supervisor: Mr. Huynh Anh Dung Students: To Quang Duy Pham Ngoc Tien Nguyen Luong Ngoc Chau Nguyen Hoang Phuc Nguyen Thi Trang.
HNDIT23082 Lecture 09:Software Testing. Validations and Verification Validation and verification ( V & V ) is the name given to the checking and analysis.
STAAR Assessment Management System and StAAR Online Testing Platform
Software Architect and Design Final Project– K15T2 – Team 04.
Mike Furlough September 26, Agenda Welcome and Intro - (Andrea Harrington) ScholarSphere Demo and Updates - (Mike Giarlo & Linda Friend) ScholarSphere.
PIER USER TRAINING 1 Class Date and Location. Instructor Name Instructor Contact Info 2 PIER User Training 1.
ITEC 275 Computer Networks – Switching, Routing, and WANs Week 12 Chapter 14 Robert D’Andrea Some slides provide by Priscilla Oppenheimer and used with.
Hanoi - December 2012 Capstone Project. Project Team Supervisor: Mr. Nguyen Hong Ky FLIS Team: Pham Hoang Phuong Chu Dinh Nam Pham Van Quyen-
Copyright © 2010 Pearson Education, Inc. or its affiliate(s). All rights reserved.1 | Assessment & Information 1 Online Testing Administrator Training.
IPEmotion License Management PM (V1.2).
11/02/2011 Appointment Process Redesign 2.0 Project Kick-Off.
Supervisor: Tran Dinh Tri Group Members: Duong Ngoc Nhat-NhatDN01687 Nguyen Quang Minh-MinhNQ01717 Nguyen Quang Minh-MinhNQ01717 Duong Hoang Nam-NamDH01552.
RFH Team Supervisor: Mr. Phan Trường Lâm Nguyễn Việt Nam – Cao Quốc Hưng – Võ Hoàng Việt – Trần Thị Bích – Nguyễn Tiến Chung -
ISS Team Group Member ◦ Nguy ễ n Nh ậ t Minh ◦ Nguy ễ n Kh ắ c Khu ◦ Ph ạ m Ng ọ c Hi ế u ◦ Nguy ễ n Ng ọ c Khánh ◦ Nguy.
Online Event Organizing Company Managemant System
ONLINE SHOP MANAGEMENT SYSTEM
Printer Admin Print Job Manager
Why we should be texting with our customers
For Computer-Based Testing
For Computer-Based Testing
GENEDI EUROPEAN COMMISSION - EUROSTAT GENERIC EDI TOOLBOX
Presentation transcript:

Records Registration Management System The HOB Capstone Project

WHAT IS PROJECT? OUR

 Nguyễn Thế Đức  Trần Thị Mộng Hà  Tạ Quang Hiệp  Bùi Huỳnh Kinh Luân  Nguyễn Tiến Luân  Nguyễn Trần Hồng Phúc Owner – The team

Information mentor  Mentor: Mr. M.S. Bùi Minh Phụng  Development Assistant: Mr. Đinh Đức Trí  Software Development VLU Center

1. Project Presentation 2. Demonstration 3. Reflection 4. Question & Answer

1. Project presentation

Agenda 1.Project management 2.Project overview 3.Requirements - Constraints 4.Quality attribute 5.Architecture 6.Quality control - Test

Project management Process Timeline Measurement Configuration management

Process

Process apply ACDM

Timeline

Measurement  Time: 5726 hour  Time week: 31 hour/ week  Change log: 12  Issue: 23

Configuration management Use Tortoise SVN as repository of project, combination with communication by (Gmail) and each team member must have Google . It provided by Google with the address: SVN Final Process forder Process folder... Old Process forder Process folder... Other

Project overview Problems of VLU Problems in enrollment Solution Scope Stakeholder

Problems of VLU VLU has 13 departments have been distributed in 2 campuses separated by 10 km of the flight of birds. So communication between departments and faculties are quite inconvenience mainly through documents or excel file.

Problems in enrollment Admitted student list send by Training Department through . Receive student's records by Excel file. Report to Dean, Principal by . Input records information by Excel file.

Solution An application installed on the computer using the Windows operating system in Departments. Website are used to view statistical reports about enrollment status of new students.

Scope Perform system development allows Van Lang University receiving records management. This development project is developed within 30 weeks. The project is a 6-member group of the Department of Information Technology development projects aimed at protecting and developing graduate management software for universities.

Stakeholder Customer: Users: Department staff of VLU (Delegate: Department staff of IT & Accounting – Auditing) Admin: Staff of Software Development VLU Center Support and development consultancy: Software Development VLU Center

Requirements - Constraints System context RRMS modules Use case Constraints

System context

RRMS modules RRMS Receiving Records Management Records Detail Management System Management Statistic (Website)

Use case

Constraints Business Constraints Our team has worked to finish this project for 30 weeks. Working time average of hours per individual. Members of this project team will not change the entire project, unless specifically indicated from the instructor. Technical Constraint Develop application runs on Windows XP or higher

Quality attribute Discover QA  Detailed scenarios  Priority ranking

QA: Performance System receives requirements from users and response results quickly, especially in functions: Print and save the records receipt View and search the list of students View and search records list

QA: Usability The user interface is designed for easy looks, easy to operate, the function buttons are arranged scientists help users become easy to familiar and manipulate. Input interface simple and effective instead of entering data in excel file as before to help save time.

QA: Availability Records receiving action always continuous during rush hour when there are many access Records receiving action does not stopped in Campus 2 in case of loss of connection with the base 1 when there is error due to power outage or transmission error.

Architecture Physical view Static view C&C view Data model

Physical view

Static view (App)

Static view (Web)

C&C view

C&C view (App)

C&C view (Web)

Data model

Quality control - Test Test process Test result

Test process The project was carried out through two testing phases:  Alpha Testing: Improve the quality of the product and ensure beta readiness. Toward the end of a development process when the product is in a near fully-usable state.  Beta Testing: Improve the quality of the product, integrate customer input on the complete product, and ensure release readiness. Just prior to launch, sometimes ending within weeks or even days of final release.

Test process Beta Testing Alpha Testing

System test result Total Number of Test Cases: 128 Total Number of Test Cases Executed: 128 Total "Pass" Test Cases: 128 Total "Failed" Test Cases: 0

Acceptance test result Received confirmation of two faculty representatives are users of Information Technology and Accounting - Auditing department. In addition, the system administrator has the positive feedback when trying to use the system. Pass 100% requirement confirmed the initial.

2. Demonstration

3. Reflection Teamwork Management & Planning Technical: Coding skill of members are not equal Mentor enthusiastic support, but the communication channel between the group and mentor has not been used effectively.

4. Question & Answer

THANKS YOUR LISTENING !