ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.

Slides:



Advertisements
Similar presentations
County of Fairfax, Virginia Department of Transportation Review and Discussion of Draft Scope of Work for Study of Issues Associated with Increasing Transportation.
Advertisements

Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
February 12, 2010 Government Center Station Reconstruction Project Green Line / Blue Line Public Meeting December, 2012.
Hot Springs Public Meeting Reconstruction of US 18 & US 385
Tacoma Link Expansion Infrastructure, Planning and Sustainability Committee Tacoma City Council--Nov. 13, 2013.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Titusville to Edgewater Bike Loop PD&E Study
Cost Estimation System Tool
2009 Wyoming Street and Utility Improvements Neighborhood Informational Meeting December 18, :00 P.M. – 8:00 P.M. 6:00 P.M. – 8:00 P.M. Mark A. Erichson,
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
City Council Meeting Lisa A. Kuss City Administrator May 8, 2012.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Facility Needs Assessment and Conceptual Design Pleasant Grove Civic Center.
South Side Red River Bridge Corridor Study Phase III Preliminary Geotechnical Study Phase IV New Alignment Alternatives Evaluation.
Environmental Assessment Public Meeting
TBG MKE West Waukesha Bypass Study Community Sensitive Solutions Advisory Group Meeting No. 5 January 31, 2011 Community Sensitive Solutions.
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
WTBA/ WisDOT Contractor /Engineer Conference January 21 and 22, 2009 Local Government Involvement on WisDOT Projects Craig J. Treadway, P.E., NE Region.
Clinton Street Bridge over the Maumee River ODOT Project DEF December 2, 2014 Stakeholder’s Meeting.
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
Clinton Street Bridge over the Maumee River ODOT Project DEF April 1, 2015 Stakeholder’s Meeting.
January 30, 2014 Luke Lortie, EIT Jerry Auge, PE
STATE ROAD 100 CORRIDOR COMMUNITY REDEVELOPMENT AGENCY Bulldog Drive Improvements Right-of-Way and Design September 21, 2010 Presentation for SR 100 CRA.
August 7, 2013 Luke Lortie, EIT Jerry Auge, PE
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
New Mississippi River Bridge EWGCOG Presentation New Mississippi River Bridge EWGCOG Presentation January 8, 2007.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Agency Scoping.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
Environmental Assessment Public Information Meeting – September 2010 Realignment of a Portion of a Utah Lake Drainage Basin Water Delivery System (ULS)
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Interstate 435 and Front Street Interchange Improvements This presentation will probably involve audience discussion, which will create action items. Use.
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
County of Fairfax, Virginia Department of Transportation Richmond Highway Transit Center Feasibility Study Briefing with the Fairfax County Transportation.
SR 997 / KROME AVENUE Florida Department of Transportation April 27th, 2006 South Miami-Dade Watershed Study Advisory Committee.
N. Burleson St. – Status Update I. Typical Sections & Pavement Design II. Budget and Preliminary Cost Estimates III. Schedule S EPTEMBER 16, 2014.
SR 1 BLUFFTON Public Hearing September 25, INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing.
CITY OF RAINIER RAILROAD CROSSINGS 1. Project # 2 Team Members PSU City of Rainier Lars Gare, City Administrator ODOT Rail David Lanning, Crossing Safety/Compliance.
East State Street (USH 12) Hanover Street to Pine Street Juneau County November 14, 2013 Public Information Meeting.
Phase 2: 30% Design Plans September 4 th, 2012.
North Main Street Improvements BID Meeting Wednesday, October 29, 2008.
Presentation Outline  Recommendation  Project Background  Public Involvement  Proposed Design  Citizen Comments/Questions  Summary and Recommendation.
STA Safety Project PID #76439 December 12, 2006.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
SAFETY FUNDING APPLICATION SUM CANTON ROAD CORRIDOR SUM Canton Road Corridor Project Safety Improvements.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
Route 12B Safety Improvement Project New York State Department of Transportation Mark Silo, P.E. Thomas J. Madison, Jr. Regional DirectorCommissioner.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
SR 256 Road Rehabilitation Town of Austin January 18, :00pm Austin Elementary School.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
156 th Street Design in Bennington Public Open House Meeting October 28, 2009 City of Bennington, NE.
Texas Department of Transportation Corpus Christi District U.S. 181 (Harbor Bridge) Environmental Documentation and Schematic Development Citizens’ Advisory.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
MED SR 18 Corridor Project MED PID October 13, 2015.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY - US 19 to BRUCE B. DOWNS BOULEVARD STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY.
2009 Sales Tax Extension Project Status Update. 2 Background Sales Tax was extended via August 26, 2008 referendum. Sales Tax was extended for an additional.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Pioneer Road Relocation and Reconstruction Project
Fordham at Columbia as a Grade-Separated Intersection
Urban Renewal and Tax Increment Financing
District 3 Complete Streets Projects
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
Downtown Valdosta Truck Traffic Mitigation Study
SE 12th Street Roadway Improvements February 8, 2005.
1200 West Widening and Reconstruction Project
Walker Street Reconstruction Project 25% Design Public Hearing
Fordham at Columbia as a Grade-Separated Intersection
STATE ROAD 61/369 CRAWFORDVILLE HIGHWAY
Presentation transcript:

ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008

Introduction Brian D. Brown, P.E. Associate / Sr. Project Manager Jose R. Alvarez Project Engineer

Preface The Ottawa Route 23 Re-alignment is an initiative by the City of Ottawa to examine the potential relocation of southbound transient traffic on Illinois Route 23 (LaSalle Street) to Clinton Street or Fulton Street, providing the opportunity to enhance Ottawa’s Historic downtown to attract businesses and visitors.

Criteria No costs, except signal removal, are included for improvements to LaSalle Street. Property costs used were based on similar commercial property for sale in Ottawa. Miscellaneous costs to cross the Illinois and Michigan Canal were not included in this assessment. Environmental and historic issues were not investigated as part of this assessment. Lighting improvements are included along the entire length of re-alignment.

Criteria (cont.) Full pavement replacement at intersections and approaches are included to remove existing crown for the overlay options. Sidewalk replacement costs are included in the reconstruction sections of this assessment. Roadway cores indicate that Fulton Street and Clinton Street north of Washington Street would need to be completely reconstructed. City utilities would be replaced. Storm sewer will be constructed, in accordance with IDOT regulations, discharging to the Illinois River.

Project Approach For estimating purposes, a two-lane urban roadway section has been assumed with minimal parking on the street. The assumed cross-section includes two 14’ through lanes and two 12’ auxiliary turn lanes all within the current right-of-way width. 3 alignment options were identified through scoping meetings with City of Ottawa Staff.

Option - No Build Advantages No capital costs No environmental impacts Disadvantages Long term plan of revitalizing Downtown Ottawa objective cannot be achieved No capital costs are associated with the “No Build” or “Do Nothing” option. The No Build option assumes no major new investments other than what already has been approved or is required for regular maintenance.

Option #1 Begins on LaSalle Street, mid-block between Superior and Washington Streets, and continues in a southwest direction, through existing mixed use property, connecting with Clinton Street north of the Lafayette Street Intersection All intersections along the re- alignment will be signalized and interconnected Estimated cost for property acquisition and building demolition for this option is $1.94 million $6.88 million for total roadway reconstruction and widening costs ($8.82 million total including acquisition) $6.16 million for overlay and intersection reconstruction ($8.10 million total including acquisition)

Option #2 Begins at the existing Illinois Route 23 southbound “S curve”, east of the merge with LaSalle Street, crossing LaSalle Street heading west, through commercial property, parallel to the Illinois and Michigan (I & M) Canal All intersections along the re-alignment will be signalized and interconnected Estimated cost for property acquisition and building demolition for this option is $1.28 million $9.07 million for total roadway reconstruction and widening costs ($10.35 million total including acquisition) $8.61 million for overlay and intersection reconstruction ($9.89 million total including acquisition)

Option #3 Begins at the same location as Option #2, crossing LaSalle Street heading west parallel to the Illinois and Michigan (I & M) Canal, then turning south, crossing the I & M Canal and connecting with Fulton Street north the Superior Street Intersection All intersections along the re-alignment will be signalized and interconnected Estimated cost for property acquisition and building demolition for this option is $1.58 million $9.26 million for total roadway reconstruction costs ($10.84 million total including acquisition)

Advantages Less roadway to construct Existing Roadway structure may be adequate for overlay Only increase total travel length by 500’ Six (6) signalized intersections Within visual distance of Downtown enticing visitors to downtown Disadvantages Potential Environmental issues with underground storage tanks (UST) Potential Historic impacts Significant property acquisition and building demolition Parking limited for existing businesses along relocated route OPTION #1

Advantages By-passes downtown A portion of the existing Roadway structure may be adequate for overlay Less building Demolition Less property acquisition Disadvantages Potential Environmental issues with underground storage tanks (UST) Potential Historic impacts Seven (7) signalized intersections Complete reconstruction of Roadway is required north of Washington Street Parking limited for existing businesses along relocated route OPTION #2

Advantages By-passes downtown Disadvantages Potential Environmental issues with underground storage tanks (UST) Potential Historic impacts Seven (7) signalized intersections Significant property acquisition and building demolition Complete reconstruction of Roadway is required Parking limited for existing businesses along relocated route OPTION #3

What’s next? Feasibility and/or Phase I Study (Major items) –Develop Purpose and Need Statement –Preparation of Intersection Design Studies –Access Control Elements and Impacts to Business –Cultural/Historic impacts –Environmental Impacts –Street Lighting and Landscaping –Impacts to Utilities –In-Depth Evaluation of Alternatives –Public Meetings and Hearings –Identify Potential Funding Sources

What’s next? (cont.) Phase II - Design Plans –Based on results and approvals of Phase I report, prepare construction plans, specification, estimate of cost and estimate of time for review and approval from IDOT. Project to be bid on IDOT letting. Phase III – Construction –Construct project in accordance with Phase II Design Plans. Provide construction observation and documentation in accordance with IDOT guidelines and regulations. on results and approvals of Phase I report, prepare construction plans, specification, estimate of cost and estimate of time for review and approval from IDOT. Project to be bid on IDOT letting.

Questions?