2nd Year: Estimation of Theoretical Relationships WP 5.

Slides:



Advertisements
Similar presentations
Design for Predictability and Efficiency (PREDATOR)
Advertisements

RENAISSANCE es un proyecto del programa CONCERTO co-financiado por la Comisión Europea dentro del Sexto Programa Marco 1 technical session WP0 State of.
RENAISSANCE es un proyecto del programa CONCERTO co-financiado por la Comisión Europea dentro del Sexto Programa Marco 1 PSG meeting & minutes, Friday.
DEBCO meeting Uso riservato aziendale 1 AGENDA: Technical Progress Meeting 9.30 – Welcome by … Start of partners presentation and activities: Partners.
Vaccination against infectious diseases in man and animal Overview of the FEAMs project proposal for the European Commission (Public Health Programme
Coming together is a beginning. Keeping together is progress. Keeping together is progress. Working together is success Working.
SAFEFOODERA – SSA – integration project Expansion of SAFEFOODERA – Fully integrated or Associated partnership in 12 months.
SAFEFOODERA – SSA – integration project Expansion of SAFEFOODERA – Fully integrated or Associated partnership in 12 months.
The vision To build a staircase to European excellence in food safety research programming through trust and mutual understanding.
The vision To build a staircase to European excellence in food safety research programming through trust and mutual understanding.
HLCM PN WG Harmonization Procurement Process and Practice Harmonization in Support of Field Operations Status Update JFBO Meeting, May 24, 2011.
Virtual Biodiversity ViBRANT Scripting Life: goals & logistics for day 2 Vince Smith Natural History Museum, London ViBRANT Virtual Biodiversity.
Contents of the EHES Joint Action Hanna Tolonen EHES JA Kick-off meeting, 21 January 2010, Luxembourg.
Brussels on the 4th of December COBECOS 1 Costs and Benefits of Control Strategies Small- scale consortium meeting Brussels 4th of December 2008.
COBECOS SIXTH FRAMEWORK PROGRAMME PRIORITY 8.1 WP 4 – DATA HARMONISATION London, 5 – 7 September.
CEPS, 1 Place du Congrès, 1000 Brussels, , TAXBEN Tax/benefit systems and growth potential of the EU SIXTH FRAMEWORK PROGRAMME.
1 Software development WP6. 2 Team CEFAS: architecture and documentation IC: modules for calculating new functions (penalty prob.; enforcement cost) AZTI:
COntent Mediator architecture for content-aware nETworks Concertation Meeting, Brussels, 3rd February 2010Slide 1© COMET Francisco Javier Ramón Salguero.
Brest, 27 – 29 of February COBECOS 1 COBECOS SIXTH FRAMEWORK PROGRAMME PRIORITY 8.1 Policy-Oriented Research Second progress meeting Brest, 27 th.
1YMLP-D Introduction to the FutureNEM project D2 Concertation meeting Brussels- 3-4 February 2010.
COBECOS Brest of February COBECOS SIXTH FRAMEWORK PROGRAMME PRIORITY 8.1 WP 4 – DATA HARMONISATION Brest of February 2008.
COBECOS Costs and Benefits of Control Strategies WP-8 SIMULATIONS.
WP 6 progress Cefas, Imperial (IC), AZTI, JRC (all participants) San Seb – Sep 2008.
Proposal of Choogle (working title) Integrated cultural heritage knowledge base Phase I: Small core with connectors to individual databases Easy and open.
Grid Initiatives for e-Science virtual communities in Europe and Latin America Objectives (DoW) Description Initial status Evolution.
EULARINET – WP 1 WP leaders: Conicyt (CH) and IRD (FR)
1 NECOBELAC Project WORK PACKAGE 3 Cross-national advocacy infrastructure.
Fabric and Storage Management GridPP Fabric and Storage Management GridPP 24/24 May 2001.
SAM £17m 3-Year Project I: £2.49m £1.2m Experiment Objectives H*: 5.4% H: 3.2% Software Support G: Prototype Grid 9.7% F* 1.5% F 1.9% CERN J 2.6% E.
CAVIAR – Continuum Absorption by Visible and Infrared Radiation and its Atmospheric Relevance Status Keith Shine Department of Meteorology, University.
Andrew McNab - Manchester HEP - 22 April 2002 EU DataGrid Testbed EU DataGrid Software releases Testbed 1 Job Lifecycle Authorisation at your site More.
WORLD: UniTN activity in the first 6 months Fabrizio Granelli Dipartimento di Ingegneria e Scienza dellinformazione.
OPTIMALE Optimising professional translator training in a multilingual Europe.
CATHI Marie Curie Initial Training Network Cryogenics, Accelerators and Targets at HIE-ISOLDE Yacine Kadi (EN) Kick-off Meeting, 23 May 2011.
1/23 Dipl.-Ing. (EUR ING) Jan Kai Dobelmann MSc DGS-Vize-Präsident MicroCHEAP Kopenhagen MicroCheap Work Package 5.
IST Open, self organising repository for scientific information exchange - SciX Žiga Turk University of Ljubljana, Slovenia
Used to Procure Goods & Supplies. Office supplies Operating supplies Computer hardware and software (non- capitalized
EGov-Bus 1st year review Advanced eGovernment Information Service Bus eGov-Bus, FP6-IST STP 1st Formal Review Meeting , Brussels eGov-Bus.
RES-H Policy Project administration, contractual and financial issues
Process Analysis and Design
EUROCHIP 3 WP1 and WP3 Meeting Feeding the project Evaluation 17 September 2010 Sofia, Bulgaria.
14/05/2008 Brussels, AP4 Workshop SWIM-SUIT Giuliano dAuria SELEX Sistemi Integrati.
19/09/2007 Belfast, AIAA Conference SWIM-SUIT Giuliano dAuria SELEX Sistemi Integrati.
MACROES Avancée du projet : déliverables Objectif Faire un état des lieux des délivrables accomplis, des retards et de ce qui est à venir dans l'annéeMéthode.
TENCompetence Management Issues: WP1 Eric Kluijfhout.
4 October 2001 SEESCOASEESCOA STWW - Programma Software Engineering for Embedded Systems using a Component-Oriented Approach Vergadering Gebruikerscommissie.
Leuven, 13 oktober 2005 agenda Inleiding en stand van zaken Demo 1: Instant messaging applied to a meeting  WP2 (code generatie), WP4 (context + service.
1 EKWALS Enhancing Knowledge Workers’ Active Learning Solutions COMPANY PROFILE EKWALS Project CERISDI CERISDI Kick Off Meeting Palermo, November 2009.
BD SKILLS – Skills for Local Biodiversity Introduction to the Project Mark Snethlage Project Manager, ECNC.
MW- Sonet J. Kasperiuniene Baltic education technologies institute.
MW- Sonet 2nd virtual meeting J. Kasperiuniene Baltic education technologies institute 2009/12/18.
MW- Sonet project presentation J. Kasperiuniene Baltic education technology institute Szeged meeting, Hungary 2010/09/27.
IST Open, self organising repository for scientific information exchange - SciX Žiga Turk University of Ljubljana, Slovenia
Project's financial status
Slide: 1 Welcome to the workshop ESRFUP-WP7 User Single Entry Point.
The Call From FP7 Work Programme 2012/Cooperation/Theme 8: Socio-economic Sciences and Humanities, pp SSH Climate change uncertainties:
IMPACT 6-7th November 20033rd IMPACT Project Workshop Louvain-la-Neuve 1 Investigation of extreme flood Processes and uncertainty IMPACT Investigation.
ANCIEN Key tasks and deadlines agreed at the Third workshop - I WP1 – the synthesis of the Country reports (The Book Chapter) March 2011 – WP1 Policy Brief.
Total Operating Expenses. 2009/2010 Operating Expenses by Function Reporting reorganized in 2010, only 2009 results restated in the reorganized form.
SAFe Automotive aRchItecture SAFARI. SAFARI_Presentation_Short_v1.ppt 2 / /P. Cuenot/ © Continental AG ARTEMIS/Call2 R&D Project Proposal Project.
A Research and Development Initiative Promoted by DI.S.T.A. Funded by EEC in the framework of BEEP project and by MURST in the framework of MITILUS project.
1 SWE Introduction to Software Engineering Lecture 6 - Software Project Management.
1 Software development WP6. 2 Application of FLR Generic Functions from Theory Key parameters (theory): q,x,shadow value,enf. cost, prob fine,f Case study.
Social Roles and Relationships.
Lecture Notes - Richard Ssembatya1 Information System Project Management Lecture Five By Richard Ssembatya MSc. Cs, BSc CS, CCNA, IT Essentials, ICDL Institute.
Do Now: March 14th Mar 16: Write a statement about the relationship between the probability of an event and the probability of the complement of the event.
Standard Errors Beside reporting a value of a point estimate we should consider some indication of its precision. For this we usually quote standard error.
COPERT 4 training workshop
AN EXAMPLE OF SUBSTANCE OF PAPER AS CTP
6.1 Simulation.
Presentation transcript:

2nd Year: Estimation of Theoretical Relationships WP 5

© AZTI-Tecnalia It will start by the beginning of Partners: All but CEFAS and JRC. Deliverable by month 24 (beginning of 2009). Objective: The estimation of the theoretical enforcement model for use in the computer model. WP5: Estimation of the theoretical relationships

© AZTI-Tecnalia WP5: Estimation of the theoretical relationships Role in the project: WP2+WP4 Data WP6 Model WP5 Estimation WP4 will give WP5 the limits of the availability of data, by CS and overall. or Depending on how we proceed: If a existing model is used WP6 gives the limits to WP5 If a new model is designed, WP5 is giving the limits to WP6.

© AZTI-Tecnalia WP5: Estimation of the theoretical relationships Role as itself D5 month 24 Report including: Estimation of the enforcement relationships: For each case study. Comparison of (if) different characteristics. How? Estimating a benefit function Estimating a enforcement cost function A probability of penalty function Using: Models: WP1 Data: WP2+WP4 Software: WP6

© AZTI-Tecnalia WP5: Estimation of the theoretical relationships Role as itself and in the project D5 month 24 Special characteristics (problems) for the estimations λ estimation-approximation. Penalty function (non random controls). We have to think on what type of uncertainties we want to introduce.