ITER – Interlocks Luis Fernandez December 2014 Central Interlock System CIS v0.

Slides:



Advertisements
Similar presentations
ITER CODAC Plant Control Design Handbook October 2008
Advertisements

André Augustinus 16 June 2003 DCS Workshop Safety.
1 ITER Standardization for Integration of local and central interlocks Riccardo Pedica PLC Based Interlock systems Workshop 4-5 December 2014 – ITER Organization.
FIU Chapter 7: Input/Output Jerome Crooks Panyawat Chiamprasert
PLC Based Interlock systems Workshop 4-5 December ITER Organization Headquarters - St Paul-lez-Durance-France ITER Central Interlock System: Central.
Software Engineering For Beginners. General Information Lecturer, Patricia O’Byrne, office K115A. –
 A system consisting of a number of remote terminal units (or RTUs) collecting field data connected back to a master station via a communications system.
Hall D Solenoid Controls. Rockwell Software Overview RSLogix5000 (PLC Programming) RSLinx Classic (Rockwell software/hardware interface) FactoryTalk (GUI.
UNICOS Objects (CPC) 11/02/14 UNICOS, CERN1 CERN, EN/ICE, UNICOS Team.
UNICOS-like system for interlocks II Workshop on PLC-based interlocks systems ITER, Dec 2014 Jeronimo ORTOLA VIDAL CERN Engineering Department, Industrial.
CERN Ivan Romera MPE-Technical meeting Status on CERN-ITER collaboration for Machine Protection Acknowledgments: J.Burdalo, R.Schmidt, S.Wagner, M.Zaera.
DCS LEB Workshop ‘98, Rome, Detector Control System, H.J.Burckhart,1 Detector Control System H.J Burckhart, CERN u Motivation and Scope u Detector and.
Diagnostics and Controls K. Gajewski ESS Spoke RF Source Accelerator Internal Review.
SCADA and Telemetry Presented By:.
Agenda Adaptation of existing open-source control systems from compact accelerators to large scale facilities.
Copyright © 2013 Rockwell Automation, Inc. All Rights Reserved.Rev 5058-CO900D L30 - Sizing PlantPAx System Architectures for Optimal Performance Sizing.
CPC (C ONTINUOUS P ROCESS C ONTROL ) SCADA UNICOS: UN IFIED I NDUSTRIAL CO NTROL S YSTEM CPC (C ONTINUOUS P ROCESS C ONTROL ) SCADA 1 Marco Boccioli -
SCADA FOR WATER DISTRIBUTION IC DEPT. GECGn SEC28.
SNS Integrated Control System EPICS Collaboration Meeting SNS Machine Protection System SNS Timing System Coles Sibley xxxx/vlb.
Progress Report on CGSE Control System Project Team of SJTU for AMS-02 Yang Yupu AMS JSC, Jan 8-12, 2007.
Openlab Workshop on Data Analytics 16 th of November 2012 Axel Voitier – CERN EN-ICE.
EPICS Collaboration Meeting Spring 2010, Aix France, Jun 2, 2010 Page 1 ITER CODAC COntrol, Data Access and Communication System for ITER Anders Wallander.
NCSX NCSX Preliminary Design Review ‒ October 7-9, 2003 G. Oliaro 1 G. Oliaro - WBS 5 Central Instrumentation/Data Acquisition and Controls Princeton Plasma.
CHAPTER 3 TOP LEVEL VIEW OF COMPUTER FUNCTION AND INTERCONNECTION
Top Level View of Computer Function and Interconnection.
Final Review of ITER PBS 45 CODAC – PART 1 – 14 th, 15 th and 16 th of January CadarachePage 1 FINAL DESIGN REVIEW OF ITER PBS 45 CODAC – PART 1.
Henri Kujala Integration of programmable logic into a network front-end of a telecontrol system Supervisor: Professor Patric Östergård Instructor: Jouni.
INTERFACE DESCRIPTION PLC objects and HMI 2 CERN, EN/ICE, UNICOS Team.
TE-MPE-EP, RD, 06-Dec QPS Data Transmission after LS1 R. Denz, TE-MPE-EP TIMBER PM WinCC OA Tsunami warning:
Beam Interlock System PR b-CTM, October 7th, 2010 Cesar Torcato de Matos.
FAIR Accelerator Controls Strategy
Controls-related R&D options Etienne CARLIER 18 th ABTEF meeting
Final Review of ITER PBS 45 CODAC – PART 1 – 14 th, 15 th and 16 th of January CadarachePage 1 FINAL DESIGN REVIEW OF ITER PBS 45 CODAC – PART 1.
EEE440 Computer Architecture
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
Systems Solution Marketing Group Industrial Automation Business Headquarters Yokogawa Electric Corporation ISD-MASP-S05011 Copyright © Yokogawa Electric.
PLC ARCHITECTURE - CPU by Dr. Amin Danial Asham.
Status of ITER collaboration for Machine Protection I. Romera On behalf of the colleagues who contribute to the project Thanks to: Sigrid, Markus, Rüdiger,
New product introduction:
ATLAS DCS ELMB PRR, CERN, March 2002Fernando Varela ELMB Networks CAN/CANopen Interoperability of the ELMB Usage of the ELMB in ATLAS ELMB Networks Full.
CERN Timing Workshop, Geneva, 15 Feb Geneva, 15 Feb 2008 Franck Di Maio – ITER IO Geneva, 15 Feb 2008 Franck Di Maio – ITER IO CERN Timing Workshop.
60kW Thermosiphon control system
CEA DSM Irfu SIS LDISC 18/04/2012 Paul Lotrus 1 Control Command Overview GBAR Collaboration Meeting Paul Lotrus CEA/DSM/Irfu/SIS.
Chapter 3 System Buses.  Hardwired systems are inflexible  General purpose hardware can do different tasks, given correct control signals  Instead.
E.Sbrissa EP/TA3 - IC ATLAS EDR_MAG Magnet Project Fault analysis, QA & Failure rate.
Training LHC Powering - Markus Zerlauth Powering Interlocks Markus Zerlauth AB/CO/MI.
Beam Interlock System Technology Evaluation and Design MACS Week 1, 2011 Hannes Pavetits 1 R. Gutleber PR a-HPA, March 28 th, 2011 H. Pavetits.
Spring 2015 EPICS Collaboration Meeting, May 2015, FRIB East Lansing, MI, USA © 2015, ITER Organization Page 1 Disclaimer: The views and opinions.
MARCO control system Munich Lukasz Zwalinski – PH/DT Maciej Ostrega – PH/DT.
BIS main electronic modules - Oriented Linac4 - Stéphane Gabourin TE/MPE-EP Workshop on Beam Interlock Systems Jan 2015.
An overview of I&C Systems in APR 1400 Parvaiz Ahmed Khand December 28, 2007.
PLC based Interlock Workshop CIS Team February 2016 ITER Central Interlock System Fast Interlock Controller.
UNICOS-CPC course - CERN EN/ICE Industrial Controls Engineering Department Deployment of the CPC6 control application Marc Quilichini
Combining safety and conventional interfaces for interlock PLCs
Dibyendu Roy Advait Ghate Yogesh Gaikwad Manojkumar Annigeri
UNICOS Application Builder Architecture
Software Specification and Configuration Management
Magnet Safety System for NA61/Shine
COntrol, Data Access and Communication System for ITER
RF Local Protection System
TS2 PSS Architecture, Concepts of Operations and Interfaces
PSS0 Design & Concept of Operations
TS2 PSS; update on concepts of operation and system's architecture
Operation of Target Safety System (TSS)
TS2 PSS Software Requirements and Software Design
Vacuum Control System for Monolith Vacuum
ASYN based S7 PLC Driver Jignesh Patel
Presentation transcript:

ITER – Interlocks Luis Fernandez December 2014 Central Interlock System CIS v0

CERN PLC Workshop – ITER IO 4-5 December 2014 Why CIS v0? 2 Objectives Assessment of the methodology Validation of technical solutions Definition of strategy for Operation from Interlock Desk Non-Critical interface with CODAC Timestamp and Archiving

CERN PLC Workshop – ITER IO 4-5 December 2014 Slow Interlock Prototype 3 Before the CIS v0 there was the Slow Interlock Prototype, our first test platform.

CERN PLC Workshop – ITER IO 4-5 December 2014 CIS prototype (test platform) 4 Two network branches connected All PLC reachable from CIS CIS 1: Full Redundant CIS 2: Full Redundant + RIO 4 PIS configurations: PIS 21: Full redundant + RIO PIS 11: CPU + 2 x CP + RIO PIS 12a: CPU + CP + RIO PIS 12b: CPU + CP Test I/O for measure Response Time Each PLC keeps track of the following times: Execution of safety program CPU execution Communication

CERN PLC Workshop – ITER IO 4-5 December 2014 TEST Cases 5 1.Configuration Parameters: Safety program execution cycle Priority Communication load 2.PLC-PLC communications in Safety Program

CERN PLC Workshop – ITER IO 4-5 December 2014 TEST Cases 6 1.Configuration Parameters: Safety program execution cycle Priority Communication load 2.PLC-PLC communications in Safety Program 3.Behavior of the Fault-tolerant configuration

CERN PLC Workshop – ITER IO 4-5 December 2014 TEST Cases 7 1.Configuration Parameters: Safety program execution cycle Priority Communication load 2.PLC-PLC communications in Safety Program 3.Behavior of the Fault-tolerant configuration 4.Effect of an increasing number of partners in the architecture

CERN PLC Workshop – ITER IO 4-5 December 2014 TEST Cases 8 1.Configuration Parameters: Safety program execution cycle Priority Communication load 2.PLC-PLC communications in Safety Program 3.Behavior of the Fault-tolerant configuration 4.Effect of an increasing number of partners in the architecture 5.Complexity in the safety matrix

CERN PLC Workshop – ITER IO 4-5 December 2014 TEST Cases 9 1.Configuration Parameters: Safety program execution cycle Priority Communication load 2.PLC-PLC communications in Safety Program 3.Behavior of the Fault-tolerant configuration 4.Effect of an increasing number of partners in the architecture 5.Complexity in the safety matrix 6.Addition of Remote Inputs / Outputs

CERN PLC Workshop – ITER IO 4-5 December 2014 Conclusions from test platform 10 [11] 1.Management of complex situation Failures are isolated from the rest of the system; the problems of one partner will not affect the performance of the whole system. 2.No advantage of hardwired connections (from I/O to I/O) compared to network. No advantage in terms of performance, maintainability, cubicle space, integration and scalability. 3.While the CPU can manage the configuration within one cycle interrupt, the response time of the central functions is almost independent from the number of partners and the communication functions. 4.The restoration of the functionality after a master switch over requires 700ms as a minimum, and with four communication instances per PIS (2 F_SEND/2F_RCV) the system can assure restoration times below 1 second. 5.The performance of a central function is below 350ms and local functions based in digital inputs have a performance below 150 ms. 6.The use of analogue inputs can double the time required for a digital input, below 225 ms

CERN PLC Workshop – ITER IO 4-5 December 2014 CIS Architecture 11

CERN PLC Workshop – ITER IO 4-5 December 2014 CIS v.0 Architecture 12

CERN PLC Workshop – ITER IO 4-5 December 2014 ITER magnets 13

CERN PLC Workshop – ITER IO 4-5 December 2014 Interlock Function Context 14 ITER Magnet powering system Magnets are distributed over 21 electrical circuits: 1 Toroidal Field 6 Poloidal Field 5 Central Solenoid 9 Correction Coil Main components: Superconducting Magnets Power Converter Protective Make Switch Fast Discharge Unit Switching Network Unit Quench Detection System Cryogenics/Vacuum

CERN PLC Workshop – ITER IO 4-5 December 2014 CIS v0 Architecture 15 Protection Modules: Coil Protection Module Hardwired Loops Supervision Architecture: Supervisor Module CIS Operation Station Critical Interlock Logging System Engineering Workstation CODAC Interface Module Simulation Interface: Magnets PBS 11 CPSS PBS 41 Cryo PBS 34 PCS PBS 47

CERN PLC Workshop – ITER IO 4-5 December 2014 CPM functions 16

CERN PLC Workshop – ITER IO 4-5 December 2014 Supervision Module 17 WinCC OA Server: Retrieve data from: CPM PIS (Simulator PLC) Provide data: CIS Desk CILS CODAC Interface Manual Commands: Permit Inhibits Reset Overrides Time Synchronization

CERN PLC Workshop – ITER IO 4-5 December 2014 CIS Desk 18 WinCC OA Client Routinely operations Monitoring Alarms Function Reset Permits / Inhibits Critical actions Overrides: Masking of Events Disabling functions Forcing Actions Monitoring of ICS

CERN PLC Workshop – ITER IO 4-5 December 2014 CIS Desk 19 Operation Display

CERN PLC Workshop – ITER IO 4-5 December 2014 CIS Desk 20 Powering Display

CERN PLC Workshop – ITER IO 4-5 December 2014 CIS Desk 21 Override Display

CERN PLC Workshop – ITER IO 4-5 December 2014 CODAC Interface 22 Non Critical Interface Supervisor Module CODAC Interface Module CODAC Gateway Information per CKT: Power Permit Override Status

CERN PLC Workshop – ITER IO 4-5 December 2014 Layout 23

CERN PLC Workshop – ITER IO 4-5 December 2014 CIS v.0 Design (Hardware) 24 Cubicle design for 2 Cubicles and 1 19” rack carried out: Cubicle 1 – Contains the CPM module, Remote I/O’s and Interface PLC for sending data to CODAC Gateway CPM ModuleRemote I/OsInterface PLC

CERN PLC Workshop – ITER IO 4-5 December 2014 CIS v.0 Design (Hardware) 25 Cubicle design for 2 Cubicles and 1 19” rack carried out: Cubicle 2 – Contains the Simulator module, Remote I/O’s and DLIB boxes and CIN-P1 and CIN-P2 switches. CIN-P1 CIN-P2 Simulator PLC Remote I/Os DLIB’s

CERN PLC Workshop – ITER IO 4-5 December 2014 CIS v.0 Design (Hardware) 26 Cubicle design for 2 Cubicles and 1 19” rack carried out: 19” rack - Houses the Engineering workstation, Supervisor module, CIS desk and the CODAC gateway along with the CIN-A switch CODAC Gateway CIS Desk + CILS Supervisor module CIN-A Engineering WS/Simulator HMI

CERN PLC Workshop – ITER IO 4-5 December 2014 CIS v.0 Design (Software) 27 Software used for CIS V.0: Engineering workstation comprises the following software for development of the functional logic code and Simulator HMI :  Siemens STEP 7 V 5.5, CFC V7.0 – For defining the hardware configuration, parameterization and Communication logic  Siemens Safety Matrix – For defining the Interlock logic for the Magnet  Siemens WinCC Flexible – For defining the HMI for Simulator

CERN PLC Workshop – ITER IO 4-5 December 2014 CIS v.0 Design (Software) 28 Software used for CIS V.0: Supervisor module and the CIS desk comprises the following software for development of the Interlock HMI:  Siemens WinCC OA – For defining HMI screens, Time stamping and data archiving in CIS V.0

CERN PLC Workshop – ITER IO 4-5 December 2014 CIS V.0 Next steps 29 Carry out the endurance tests for the Interface boxes and capture the results Information from the Interface boxes to be read via Profinet and data to be interpreted for diagnostic purpose Achieve the time stamping for the events in the CIS desk Carry out performance tests on the CIS V.0 similar to tests carried out in the Slow Interlock Prototype Use the CIS V.0 as a platform to demonstrate all the proposed processes for integrating, upgrading and maintaining the ICS. Use the CIS V.0 as a platform to help in developing and improving the CIS V.1 The CIS V0 shall be shipped to Korea in December 2014 to facilitate study for CIS V.1

CERN PLC Workshop – ITER IO 4-5 December 2014 Thanks 30