Integrated electricity planning: introduction & demonstration Tira Foran, PhD Unit for Social and Environmental Research, Chiang Mai University Mekong.

Slides:



Advertisements
Similar presentations
Pakistans Power Sector Need for Reforms By Kalim A. Siddiqui President-Petroleum Marketing Byco Petroleum Paksitan Limited 4 th International Power Generation.
Advertisements

Grenada Sustainable Energy Plan Stakeholders Meeting April 5, 2002.
1 Presentation on Investment Opportunities in Indian Power Sector and Cooperation with IEA By R.V. SHAHI Secretary, Ministry of Power Government of India.
Barriers to Adoption of Clean and Efficient Technologies in the Indian Power Sector: An Analysis Using AHP Anoop Singh, S. C. Srivastava Indian Institute.
NARUC 2015 Winter Meeting February 16, 2015 Combined Heat and Power and the Clean Power Plan Bruce Hedman Institute for Industrial Productivity.
Responding to the Electricity Challenges: Five Point Plan Overview 19 December 2014 Confidential 1.
Gas Statistics in Myanmar 24~26 September,2012 Beijing,China International Workshop on Energy Statistics Presented by Tin Zaw Myint Deputy Director Energy.
1.  Purpose  To present Staff’s Preliminary Findings on the 2012 Integrated Resource Plans of:  APS – Arizona Public Service Company  TEP – Tucson.
Community Energy Opportunities Jon Bell Business Development Manager Mosscliff Environmental Ltd.
1 EERMC Public Meeting on Combined Heat and Power September 17, 2013.
Easing the Integration of Intermittent Renewables with Combined Heat and Power Kyle Siler-Evans RenewElec Workshop, 2010.
Energy: Activities of the Energy Committee of the Academy of Athens Prof. Loucas G. Christophorou Chair of Academy’s Energy Committee Academy of Athens-EASAC.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 14 Energy Efficiency Module 14: DEMAND-SIDE MANAGEMENT.
Alternative Energy Development Plan (2008 – 2022), Medium - and Long – term Investment Plan and the Role of the Private Sector Mr. Rangsan Sarochawikasit.
Special Report on Renewable Energy Sources and Climate Change Mitigation IPCC WORKING GROUP 3.
Financing new electricity supply in the UK market with carbon abatement constraints Keith Palmer 08 March 2006 AFG.
China’s Sustainable Energy Policy
E NERGY, E NVIRONMENT AND S USTAINABILITY Gaurav Shukla CUTS International.
World Bank Experience with Power Sector Baselines Workshop on CDM Methodologies for Grid-Connected Power Projects Buenos Aires, 8 December 2004 Fernando.
Environment and Energy Htun Paw Oo 1 June Content Environment and Energy Ecosystem services The role of energy Myanmar energy context Way forward.
Less is More: SEE Action and the Power of Efficiency Hon. Phyllis Reha Commissioner, Minnesota PUC Co-Chair, SEE Action Customer Information and Behavior.
Thailand, May 2009 Mekong Energy and Ecology Network The First Mekong Energy and Ecology Training.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 13 Energy Efficiency Module 13: SUPPLY-SIDE MANAGEMENT.
E.ON on the Romanian Energy Market ZF Power Summit Bucharest, February 27, 2013 Frank Hajdinjak CEO E.ON România.
Electricity Reforms in Bangladesh
POWER SECTOR POLICY OVERVIEW ASSOCIATION FOR POWER UTILITIES OF AFRICA (APUA) SCIENTIFIC COMMITTEE CONFERENCE Presentation by Mr. M. Mulasikwanda Department.
1. Summit Implementation Review Group December 10, 2008 El Salvador Philippe Benoit Sector Manager, Energy Latin America and the Caribbean The World Bank.
Empowering People The Electricity Governance Initiative PRAYAS- PUNE ENERGYGROUP Smita Nakhooda 11 May 2007 New York CSD 15.
Electricity in Thailand: current arrangements, impacts, alternatives 2 August, 2006 ERI Chris Greacen
The NEP Workshop on Off-Grid Electrification in Myanmar Nay Pyi Taw, January 2015 South-South Cooperation to Power Rural Communities through Renewable.
‘Working for Desirable Future’ : Transparency and participation in electricity sector planning in Thailand Suphakit Nuntavorakarn Healthy Public Policy.
Overview of Thailand’s power demand and supply With reference to proposed mainstream dams in the Lower Mekong Basin The Development Context Discussion.
Net Metering Technical Conference Docket No PacifiCorp Avoided Costs October 21, 2008 Presented by Becky Wilson Executive Staff Director Utah.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
INTRODUCTION TO THE UNIDO/REEEP TRAINING MANUAL ‘SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA’ User Manual.
Ensuring the delivery of secure low carbon energy David Green Chief Executive, UKBCSE.
FOR SIXTY YEARS WE HAVE BEEN TAKING THE POWER FROM WATER AND HANDING IT OVER TO NATIONS LINKING THE DOTS Bucharest, February 20, 2014.
Ukraine energy policy outlook Ildar GAZIZULLIN International Centre for Policy Studies May 25, 2012, KSE Alumni congress.
6, rue du Général Clergerie Paris – France Tel: +33-(0) Fax: ~ Michel COLOMBIER IDDRI Paris Impacts and Adaptation.
RDL Utility Based Financial Incentives for Renewable Energy & Energy Efficiency in New Zealand EGNRET Workshop Honolulu, Hawaii, USA 30 March – 1 April,
Renewable Energy Policies of Germany and China Masood Ahmed CRER, SZABIST December 24’ 2009.
DG Toronto Hydro’s Perspective Task Force on Distributed Generation Richard Lü VP, Environment, Health & Safety March 5, 2003.
Combined Heat and Power Workshop Report and Next Steps Power Committee Briefing 7/15/03.
Electricity in Thailand: current arrangements, impacts, alternatives 27 June, 2007 ERI Chom Greacen Chris Greacen
GMS Power Grid Who gains, who loses? Chuenchom Sangarasri Greacen 17 July 2005 Piyawan Resort.
THE LONG-TERM ENERGY SUPPLY AND DEMAND OUTLOOK IN TAIWAN ENERGY COMMISSION MINISTRY OF ECONOMIC AFFAIRS AUGUST 2001 MOEA -15-
Dealing with Green Power Intermittency in the Mexican Electrical Sector Jorge M. Huacuz Non-Conventional Energy Unit Electrical Research Institute Mexico.
Sustainable Energy Plan June 22, 2002 Sustainable Development Council John Auguste (Ministry of Works, Communications, and Public Utilities)
INTER-AMERICAN DEVELOPMENT BANK Promoting a Diversified Energy Matrix in the Caribbean IRENA Island Energy Transitions Martinique June 24, 2015.
NS4054 Fall Term 2015 North America Energy Trilemma.
Workshop on Energy-related National and EU-Wide Projections of Greenhouse Gas Emissions 27 to 28 februari 2002 Emissions of CO 2 from the energy sector.
Economic Assessment of Implementing the 10/20 Goals and Energy Efficiency Recommendations – Preliminary Results Prepared for : WRAP, AP2 Forum Prepared.
UNEP Collaborating Centre on Energy and Environment Use and Conceptualization of Power Sector Baselines: Methodology and Case Study from El Salvador Lasse.
Implementing Power Rationing Programs The Tanzania and Uganda Experience Karen Rasmussen (AFTEG)
Implement photovoltaic in Gabon. Introduction  Compared to the rest of the world, there is a general shortage of energy related information in Africa.
HIGH LEVEL FORUM “SECURITY OF ELECTRICITY SUPPLY IN KOSOVO” ENERGY POLICY FRAMEWORK IN KOSOVO LUAN MORINA, HEAD OF DEPARTMENT FOR ENERGY PRISHTINA, MARCH,01,2016.
EnergyTour November Copenhagen Energy Summit Energy Tour District Heating in Denmark Mr Jan Elleriis, Vice President, Metropolitan Copenhagen Heating.
Institutional Support Vladimir Koritarov Argonne National Laboratory April 2016.
The Second Capacity Building Workshop on “Low Carbon Development and Nationally Appropriate Mitigation Actions” Alternative Policy Scenarios For Renewable.
Ojārs Kehris Economist Association 2010 President Energy market and security of supply in the Baltics – Latvia, Lithuania, Estonia Reforming Infrastructure.
Understanding the Integrated Resource Plan (IRP 2010 Rev 2)
ГММ -1( а ) Li Jianfei. By 2040, the world and, in particular, countries which have large and technologically advanced economies – such as the USA,
Kenya’s INDC: Actions in the Energy Sector
Republic of the Union of Myanmar Electricity Sector Financial and Regulatory Issues 18 May 2016 by Myanmar Energy Team The World Bank.
Renewable energy potential in Thailand
Integrated Resource Plan 1
India Energy Congress 2013 Sustainable Sources of Energy February 2013.
Scaling up of Renewable Energy for Power Generation in the Western Balkan countries
Synergies between NDCs & SDGs; Integration into National Planning
Presentation transcript:

Integrated electricity planning: introduction & demonstration Tira Foran, PhD Unit for Social and Environmental Research, Chiang Mai University Mekong Energy and Environment Network Workshop 14 May 2009

Purpose of talk Review power development plan (PDP) process in Thailand Introduce IRP ~ integrated electricity resource planning Demonstrate how it might work Review governance challenges

Motivation: during the 1990s, Thailand’s EGAT built a controversial dam... During the “5 month, 9 day rally” Dec Source: Buchita After the “win-win” opening solution, June 2004

... But also successfully implemented energy efficiency!

Can Thailand find more clean, efficient, sustainable options? Integrated electricity planning may help What is it? Who does it and in what context? What governance obstacles exist?

Part I: Review and critique of Thailand’s (EGAT’s) PDP

EGAT’s planning objectives

EGAT’s PDP: Six limitations 1 Definition of basic objectives 2 Costs 3 Role of energy efficiency 4 Role of renewable energy 5 Role of scenario thinking ( เหตุการณ์จำลอง ) 6 How to deal with risks

1 Basic emphasis is on supply-side options

Thailand power development plan (EGAT 2007)

Example of “ 20-year load forecast and resource plan”

Basic emphasis is on supply-side options

2 PDP still discloses little data to public about costs  Real fuel price assumed constant  or slight increase for inflation Cost is financial cost of EGAT, not society’s economic costs  Many externalities not included

3 PDP still does not take energy efficiency seriously EGAT’s DSM division does a 5-year plan, but PDP is a 15-year plan Energy efficiency is not modeled in a detailed manner  Assumption that “elasticity” of economy will improve  Top-down approach

... But top-down assumptions must link to bottom- up program design!

Energy Efficiency is <50% of cost of new supply capacity or energy Source: EGAT’s DSM Division 2008

4 PDP still does not consider renewable energy seriously Many small power producers (“non-firm”) are not counted as supply option in the PDP Very small power producers (VSPP) are not counted as supply in the PDP  They are accounted for on the demand-side (which is external to the optimization)  analyzed in a superficial manner in the Load Forecast Long-term planning by Dept of Alternative Energy Dvmt (DEDE; กรม พพ.) not in the PDP

5 Limited use of scenario thinking  “Scenarios”  Stories about different possible futures (social and/or technical), based on what is already known  Help improve understanding about different factors that planners cannot control  Economic conditions  Fossil fuel markets  Political changes  For example: How would the power system look if...  EGAT cannot just build any power station it wants to  renewable energy is subsidized more strongly (“feed-in tariff”)  energy efficiency is planned and implemented more vigorously

6 PDP does not explicitly deal with risk

Reasons for limitations of PDP  Institutional limitations 1  Financial model: rate-of-return หรือ ROIC  Institutional limitations 2  Many units, many plans, no integration  Power of discourse ( วาทกรรม )  “energy efficiency is not as reliable as building new power plant”  If you want cheap electricity, you need to build large power stations

Part II: Introducing integrated electricity resource planning

IRP: what is it? Comprehensive options assessment Balanced treatment of demand-side and supply- side options Invest in least-economic cost first Can be done for energy, water

IRP: who typically does it & in what context? Requires engineering and economic data... utilities typically do it In North America: required to do so by strong regulators Hasn’t always been popular  belief that privatization makes detailed planning unnecessary

Demonstration of IRP Work in progress (see Foran 2008 [in Thai]) How much electricity (kWh, MW) from large stations could be avoided if Thailand were to attain its ‘practically achievable potentials’ in  energy efficiency +  renewable energy +  CHP (combined heat and power) ? Timeframe: ; (for RE) Practically achievable potential  It is < Commercially viable potential < Economically viable potential < Technical potential  การประหยัดพลังงานไฟฟ้าที่คุ้มค่าทางการเงินและบรรลุได้ในทาง การตลาด ... thus it is an estimate

IRP can be designed as an integrated, participatory assessment

Step 1 Create reference scenario Business-as-Usual (BAU) scenario = Thailand power development plan (EGAT 2008)

Step 2 Review demand forecasting I took the official load forecast (pink line) as a BAU scenario Ideally forecasting would be bottom-up (based on regular user surveys) as well as top- down (macroeconomic)

Step 3 Estimate the achievable potential energy efficiency options Review literature  Du Pont 2005  Foran, du Pont & Parinya 2006  Bundit Limmeechokchai 2006

Review energy efficiency cost data Lack of recent data But Thai data show energy efficiency is much cheaper than new supply International data confirm SourceCostNotes du Pont THB / kWhbased on EGAT (2000) & earlier EGAT THB/ kWhIncludes new ESCO start-up 0.49 THB / kWhEGAT’s Long-run marginal cost

Energy efficiency options: achievable potential by 2018

Step 4 Estimate the achievable potential renewable energy options Review literature  du Pont 2005  JGSEE 2007  Jepsen et al. 2006

Review renewable energy cost data (THB / kWh)

Step 4a Estimate the achievable potential renewable energy options New modeling: explore effect of different prices for renewable energy, biomass feedstock and crude oil Same model as Jepsen et al. (2006), revised assumptions  Crude oil  Biomass  Base tariff  Feed-in tariff

Achievable renewable energy potential Case: year-1 base tariff: 3.34 THB/kWh + Feed-in tariff: Southern provinces rate Assumptions: Crude oil: 110  146 USD/barrel Biomass: 1000  1200 THB/ton

Step 5 Estimate achievable potential of combined heat and power (CHP) options Review literature: Dusan Gvozdenac et al  Study of Thailand’s existing ‘designated buildings’  42% are suitable for CHP installation  Estimated 3633 MW (23,565 GWh) potential I took 30% of this as achievable potential

Step 6 Review other data for near-term achievable potential Ministry of Energy has small power producer (SPP) and very small power producer programs (VSPP) Private-sector apply to sell power to grid Popular with private-sector (favorable prices: ‘feed-in tariffs’) Some applications already in PDP; many not NGOs criticize arbitrary limits on SPP (= 1700 MW) I assumed all bids submitted to Ministry but not yet in the PDP power are achievable ‘Near-term potential’ : 3023MW

Step 7 Sum the clean, distributed, domestic options achievable by 2018 Near-term potential: 3023 MW (previous slide) Medium-term potential: 4890 MW Total clean domestic achievable by 2018: 7913 MW (~ 33,000 GWh)

Step 8 Compare clean domestic options with reference case (EGAT 2008) Thailand needs total net new supply of 30,413 MW, according to reference case  EGAT’s PDP 2007, Revision 1 Clean domestic options: total achievable by 2018 = 7913 MW (~ 33,000 GWh)  Can substitute large central stations (coal, gas, hydropower, nuclear) If demand grows according to reference case (5.5% per annum)  tremendous challenge! But it may not New imports – hydro + coal Clean domestic (EE +RE +CHP

If all clean domestic (7913 MW) substitutes for imports, might avoid: 2011 ~ Nam Ngum 2 (597 MW) 2012 ~ Theun Hinboun Expansion (220 MW) 2013 ~ Nam Ngum 3 (440 MW) + Hongsa 1 (490MW) 2014 ~  Either: Nam Theun 1 (523 MW), Nam Ngiap (261 MW), Nam Ou 1 (200 MW)  Or: Hongsa 2 & 3 (2 x 490 MW) 2015 ~ Nam Ou 2 (843 MW) 2017 ~ Unspecified (510MW)

But may also want to use clean domestic (7913 MW) as substitute for ‘dirty’ domestic Reference case:  Nuclear: 4000 MW (2020 and 2021)  Old coal: Mae Moh  New thermal (coal + natural gas)

IRP: governance challenges  Basic regulatory framework = “rate-of- return”  Profits are a fixed percentage return on invested assets (8.4%)  Institutional preference for large scale, supply- side options  Political tension  Challenges are institutional, but also involve powerful discourses E.g., ‘Energy efficiency not as reliable as power plant’ ‘Very small power producers not as reliable’

IRP: institutional challenges Preference for large scale, supply-side options Governance problems  Basic regulatory framework = “rate-of- return”  Lack of meaningful participation  Conflicts of interest  La rge scale (PDP model options): 700 MW Coal-Fired Thermal Power Plant 700 MW Gas-Fired Combined Cycle Power Plant 230 MW Gas Turbine Power Plant 1,000 MW Nuclear Power Plant  Demand forecast: Low Medium (“Base”) High

Summary: clean, distributed, domestic options achievable by 2018 for Thailand Total clean domestic achievable by 2018:  7913 MW (~ 33,000 GWh)  Based on detailed review + modeling Near-term potential:  3023 MW (SPP + VSPP programs) Medium-term potential:  4890 MW (our analysis)  Enhanced feed-in tariffs for RE  Enhanced support for EE Already have successful DSM Need to implement new building code Need to mainstream EE building design

Summary: IRP presents opportunities & challenges Opportunities (1) Provides structure for meaningful public participation - Lots of interest in civil society (2) Coherent framework - Boost legitimacy - helps identify gaps in analysis (3) Helps communicate to policy-makers Challenges (1) Legitimacy (2) May need additional data (3) Time-intensive; requires modeling

IRP should be designed as an integrated, participatory assessment

Recent + recommended steps for pro- sustainability advocacy in Thailand Build good relations with elite actors  Energy Regulatory Commission: Palang Thai, CMU-USER, AWISH organized 2008 study tour to USA + January 2009follow-up visit by U.S. experts  Demand Side Management Division with EGAT Promote integrated electricity planning to other actors  Private sector: SPP + VSPP Increase public interest in energy efficiency and micro- generation