Central Valley Flood Protection Board Meeting – Agenda Item No. 4E APPLICATION NO. 19046.

Slides:



Advertisements
Similar presentations
Adobe 5 Collaborative Proposed Project Plan February 23, 2004.
Advertisements

Scoping Meeting Yuba Goldfields 200-Year Flood Protection Project Environmental Impact Report June 23, 2014.
BUILDING STRONG ® Do not include this Slide. This template is a guide for preparing power points presentations. The information requested is important.
TVI Resource Development (Phils), Inc. September Canatuan Tailings Management Completion of Stage 1 Tailings Management Facilties Gossan Dam and.
Permanent Protection System Opinion of Probable Cost May 2010 Courtesy USACE Photograph Courtesy USACE.
Sandbagging Techniques
PROPOSITION 218 IMPACTS ON UTILITY USER FEES Case Study City of Dixon Sewer Rate Repeal of 2007.
Central Valley Flood Protection Board Meeting – Agenda Item No. 7A APPLICATION NO
Public Information Meeting #6 City of Fargo Flood Risk Reduction Projects Rose Creek Coulee October 9, 2012.
US Army Corps of Engineers BUILDING STRONG ® Methods for Determining Maximum Flood Elevations Landward of Failed Levees: An Example from the Great Missouri.
City of St Helena Upper York Creek Ecosystem Restoration Project April 28, 2015 St. Helena City Council Meeting.
US Army Corps of Engineers BUILDING STRONG ® FOLSOM DAM MODIFICATIONS APPROACH CHANNEL EIS/EIR Major Robert Dion and Cameron Sessions Project Managers.
Central Valley Flood Protection Board Meeting – September 27,
FloodSAFE – how one local agency works to keep its levees and public safe Ann Draper, Assistant Operating Officer National Levee Safety Summit, St. Louis.
TRLIA Certification of Environmental Impact Report and Selection of Project for Feather River TRLIA Board Meeting: February 6, 2007 Briefer: Paul Brunner,
Central Valley Flood Protection Board Meeting – Agenda Item No. 13B.
SUTTER BUTTE FLOOD CONTROL AGENCY Supplemental Presentation on Variances and Encroachments Feather River West Levee Project Project Area C May 24, 2013.
California’s Central Valley Flood System Improvement Framework California Levees Roundtable March 27, 2009 California Levees Roundtable March 27, 2009.
Dredging, Disposal Management and Impacts on Lake Sediments US Army Corps of Engineers.
Seattle District Seattle District U. S. Army Corps of Engineers U. S. Army Corps of Engineers.
Central Valley Flood Protection Board Meeting – Agenda Item No. 10A APPLICATION NOS and
Acquisition of Flood Control Easements Triangle High-Ground Area City of West Sacramento, Yolo Co. Meeting of the Central Valley Flood Protection Board.
BUILDING STRONG ® 1 Regional General Permit (RGP) 31 Interagency Meeting June 11, 2015.
Central Valley Flood Protection Board Meeting – Agenda Item No. 11 DESIGNATED FLOODWAY MODIFICATION.
Proposed Benefit Assessment District Overview Three Rivers Levee Improvement Authority (TRLIA) TRLIA.ORG March 10,
Three Rivers Levee Improvement Authority (TRLIA) Briefer: Mary Jane Griego, TRLIA Board Member Three Rivers Levee Improvement Authority March, 2007.
SKAGIT COUNTY SHORELINE REGULATIONS Planning Commission Workshop April 3, 2012.
BUILDING STRONG ® Do not include this Slide. This template is a guide for preparing power points presentations. The information requested is important.
Central Valley Flood Protection Board Meeting – December 20,
Broadview Second Access. Parlette Annexation What has changed? Parlette has asked for reconsideration –Recitals in agreement are not operative provisions.
CALIFORNIA DEPARTMENT OF WATER RESOURCES Preparations for Flood Season DFM Flood Maintenance Office Presented By: Noel Lerner, Former Chief Flood.
Shoreline & Waterway Management Section Regulations Governing Beach Protection and the Use of Beaches December 27, 1983 Beach – is that area which extends.
Chapter 33 Dam Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Give reasons why.
August 28, 2015 Meeting of the Central Valley Flood Protection Board Dave Wheeldon, Chief Flood System Sustainability Branch FMO, Division of Flood Management.
1 Three Rivers Levee Improvement Authority Follow-up on Twelve Compliance Issues Raised on February 26, 2007 March 22, 2007.
Riverside County Flood Control and Water Conservation District Murrieta Creek Flood Control, Environmental Restoration and Recreation Project June 2006.
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
Broad Beach Sand & Dune Habitat Restoration Project Broad Beach Revetment Owners August 29, 2015.
Prepared by: Burnham – Floodplain Study October 23, 2009 Presented by: Marty Spongberg, PhD, PE, PG AMEC Geomatrix, Inc.
Solano Habitat Conservation Plan 580,000 Acres 36 Covered Species; 4 Natural Communities 17,500 acres of Urban Development; 1,280 acres of other New Facilities.
Cumberland Park CCB Project Virginia Department of Environmental Quality October 9, 2007.
Central Valley Flood Protection Board Meeting – Agenda Item No. 6B APPLICATION NO
Regional Water Availability Rulemaking Chip Merriam Water Resources Advisory Commission February 8, 2007 Chip Merriam Water Resources Advisory Commission.
September 23, 2010 Overview of DWR’s Flood Management Activities Related to the Delta A Briefing to the Delta Stewardship Council 1.
YCWA Flood Management for Relicensing 9/24/14 9/24/20141.
Melinda Terry, Executive Director CA Central Valley Flood Control Association 1.
Yuba County Comprehensive Flood Protection Program
Presented to: Central Valley Flood Protection Board August 23, 2013 Sacramento Area Levee Accreditation Key Results from Encroachment Analysis.
Central Valley Flood Protection Board Meeting – Agenda Item No. 9A CVFPB MEETING – October 25, 2013.
TOPSAIL BEACH 30 Yr Beach Management Plan June 8, 2011.
Tracey Ferguson Project Manager, Integrated Water Resources ATKINS.
Three Rivers Levee Improvement Authority February 26, 2007 Presentation to the State Reclamation Board Subcommittee Proposed Feather River Setback Levee.
Central Valley Flood Protection Board Meeting – Agenda Item No. 7D Methylmercury Open Water Workplan.
2 West Sacramento, California Project General Reevaluation Report Letter of Support for the West Sacramento General Reevaluation Report Agenda Item 4G:
2 American River Common Features General Re-evaluation Report Request for Board Approval of Letter Requesting Consideration of Locally Preferred Plan (LPP)
Central Valley Flood Protection Board Meeting – Agenda Item No. 7C.
CVFPB Executive Committee Meeting – Agenda Item No. 4C Central Valley Flood Protection Board.
Community Development Department Dimensional Variance In Connection with The Agreement to Convey Property – City Initiated Application # Palm.
APPLICATION NO LEVEE DISTRICT No. 1 Of SUTTER COUNTY STAR BEND SETBACK LEVEE SUTTER COUNTY April 17, 2009.
Update to Proposition 1E – Early Implementation Project (EIP) Application and Local Share Reclamation Board Sub-Committee Meeting September 11, 2007.
1 Calcasieu River & Pass, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting February 2, 2005 Project Manager Mireya Laigast, Civil Engineer,
West Sacramento Area Flood Control Agency November 10, 2011 Update on Current Levee Construction Projects and on the Southport Sacramento River Levee Early.
permitting.
City of Stockton Levee Flood Protection Status Report January 29, 2008 Agenda Item 4.03.
May 14, Planning Commission Planning Commission May 14, 2015.
STOCKTON DELTA WATER SUPPLY PROJECT (DWSP) Final Environmental Impact Report (EIR) Certification Hearing November 8, 2005 Mark J. Madison, Director Municipal.
Environmental Quality Board
Central Valley Flood Protection Plan Senate Bill 5 Amendments
Washoe County Board of Adjustment
Appeal: Time Extension for Variance # East Walnut Street
Presentation transcript:

Central Valley Flood Protection Board Meeting – Agenda Item No. 4E APPLICATION NO

Central Valley Flood Protection Board Meeting – Agenda Item No. 4E Consider approval of Permit No to:  to enlarge and reshape existing dredge tailing embankments,  construct a 16-foot-wide patrol road on the embankment crest,  construct access ramps within the Yuba Goldfields, and  *allow construction activities during the flood season. 2

Central Valley Flood Protection Board Meeting – Agenda Item No. 4E California Water Code § 8534, 8590 – , and 8700 – 8710 Title 23 standards:  § 6 – Need for a Permit  § 11 – Variances  § 13 – Evidentiary Hearings  § 112 – Streams Regulated and Nonpermissible Work Periods  § 116 – Borrow and Excavation  § 121 – Erosion Control  § 130 – Patrol Roads and Access Ramps 3

Central Valley Flood Protection Board Meeting – Agenda Item No. 4E The project is located:  In Yuba County  Approximately 10 miles northeast of Marysville  Upstream of RD 784 urban areas of Linda and Olivehurst Marysville Yuba City Linda Olivehurst Yuba River Daguerre Point Dam Proposed Tailing Embankments Proposed Tailing Embankment “Crossing 21” Proposed 2.1 mile Tailing Embankment Extension Yuba River Daguerre Point Dam 4

Central Valley Flood Protection Board Meeting – Agenda Item No. 4E  U.S. Army Corps of Engineers non-federal letter received August 27, 2015  USACE District Engineer has no comments or recommendations because the project does not affect a federally constructed project  TRLIA endorsed the project on May 28, 2015 – the Goldfields are not currently part of an existing LMA, therefore TRLIA will be responsible for maintenance of this interim project 5

Central Valley Flood Protection Board Meeting – Agenda Item No. 4E  TRLIA constructed a group of projects to provide 200-year flood protection to the RD 784 urban area (10 years and nearly $400 million)  A permanent 200-year flood protection project is currently in design  Goldfields were formed by hydraulic mining (since the early 1900s)  The RD 784 levee system is part of the SPFC within the Sacramento River Flood Control Project (SRFCP) and in a 1953 memorandum between the Federal government and the State of California, the Goldfields are called “high ground”  Research for the “high ground” determination indicates the decision was made based on an original Yuba River design flow of 120,000 cfs  Design flow was increased to 180,000 cfs in 1970 with the authorization of the New Bullards Bar Dam on the North Fork of the Yuba River  TRLIA has been unable to locate documentation from the USACE or State to confirm that the Goldfields would function as high ground at 180,000 cfs 6

Central Valley Flood Protection Board Meeting – Agenda Item No. 4E  Evaluations from 2010 to 2013 identified significant erosion points in the south bank tailing mounds of the Yuba River that may breach and allow Yuba River flood flows to enter the Goldfields during a 100-year event  if the Goldfields can’t contain the flows then flooding in RD 784’s urban area could occur  The proposed interim project is in advance of the future 200-year flood protection project for the Goldfields and would improve the functionality of the SPFC, without modifying SPFC facilities or affecting the SRFCP  It will prevent flanking of the SPFC facilities during a 100-year event 7

Central Valley Flood Protection Board Meeting – Agenda Item No. 4E  Due to current public safety risk to RD 784 urban area  TRLIA is requesting Board approval to continue the interim 100-year construction through the flood season**  The following Board standard applies to TRLIA’s requests:  § 112(b)(2) – “The board, at the prior written request of the applicant, may allow work to be done during the flood season within the floodway, provided that, in the judgment of the board, forecasts for weather and river conditions are favorable.”  Per Title 23, Table 8.1, the flood season for the Yuba River is November 1 to April 15  Request allows construction during the flood season, as needed for completion  TRLIA determined it is possible to construct during the flood season in wet weather:  material properties of dredge tailings, which drain freely  within a few days of heavy rain it can be excavated, placed, and compacted without pumping issues*  proposed embankments separated from the Yuba River by thousands of feet  shaping of these embankments with dredge tailing fill will not adversely impact river hydraulics during or after construction because of existing activities and conditions  Board staff determined that the variance to Board’s standards can be approved without adverse risk to the SRFCP or SPFC facilities and can be constructed in this area regardless of weather conditions (Special Condition TWENTY-FOUR added to permit) 8

Central Valley Flood Protection Board Meeting – Agenda Item No. 4E  Project is located on property owned in fee by Western Aggregates (for the 2.1 miles of embankment extension) and the USACE (for the “Crossing 21” embankment location)  The lands are regulated by the State Mining and Geology Board  Western Aggregates holds vested surface aggregate mining rights along the embankment extension  Cal-Sierra Development holds vested mineral rights along a portion of the embankment extension and for “Crossing 21”  Rather than obtaining fee title or an easement for an interim project TRLIA will execute co-operation agreements with Western Aggregates (executed), Cal-Sierra Development (executed), and the USACE (drafted)  agreements will allow TRLIA to construct and maintain the 100-year embankments for the next 10 years with options to extend the agreements if needed  TRLIA would be responsible for all regular O&M activities  Board staff has incorporated Special Condition SEVENTEEN to require execution and review by the Board of said Co-operation Agreements prior to the start of construction at the specific project locations 9

Central Valley Flood Protection Board Meeting – Agenda Item No. 4E  Proposed embankments constructed using existing dredge tailings  minimum crown (top) width of 35 feet  waterside 3:1 (horizontal to vertical) and landside 5:1 slopes  crown constructed to a height 3 feet above the 100-year WSE  Approximately 200,000 cubic yards (CY) of tailings will be placed to extend approximately 2.1 miles of high ground into the Goldfields from the YRSL  Approximately 10,000 CY of tailings will be placed at “Crossing 21”  Fill material will be required to be primarily granular, limited to a maximum particle size of 10 inches, will be spread in maximum 18-inch lifts, and compacted by the weight of equipment and at least one pass of either a vibratory or other compaction roller  A 16-foot wide patrol road will be constructed on the crest 10

Central Valley Flood Protection Board Meeting – Agenda Item No. 4E Hydraulic Summary:  designed to intercept and block 100-year breach flows originating from YRSL and hold them long enough to allow flood peaks to pass  blocked flows would then return to the Yuba River or percolate into underlying groundwater aquifers  Both embankment locations are removed and separated from the Yuba River by thousands of feet of existing dredge tailings  shaping of these embankments with dredge tailing material would result in no changes to the existing Yuba River floodway and thus no impacts to river hydraulics would result (convey flood flows in the same manner as today)  Board staff has determined that the project is not anticipated to result in any adverse hydraulic impacts to the SRFCP, nor will it modify or affect existing SPFC facilities. 11

Central Valley Flood Protection Board Meeting – Agenda Item No. 4E  The dredge material offers its own protection to rain erosion once the surface fines have been washed away and gullying is not an issue with this material  Board staff agrees with TRLIA’s assessments, which indicate that the proposed project and fill placement (within an active mining area outside of the SPFC) will cause no adverse geotechnical impacts to the SRFCP or existing SPFC facilities. 12

Central Valley Flood Protection Board Meeting – Agenda Item No. 4E  CEQA Analysis is included in Staff Report Section 8.0  Water Code §§ Considerations are included in Staff Report Section

Central Valley Flood Protection Board Meeting – Agenda Item No. 4E Board Staff Recommends that the Board: Adopt:  the CEQA findings; Approve:  *construction during the flood season from November 1 through April 15;  draft Encroachment Permit No (in substantially the form provided); and Direct:  the Executive Officer to take the necessary actions to file a Notice of Determination with the State Clearinghouse and execute the permit. 14

Central Valley Flood Protection Board Meeting – Agenda Item No. 4E Presented by: Nancy Moricz, Senior Engineer 15