18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD Mechanics IDM.

Slides:



Advertisements
Similar presentations
24 June 2010 Immanuel Gfall (HEPHY Vienna) CO 2 Cooling for PXD/SVD IDM Meeting.
Advertisements

A Low Mass On-chip Readout Scheme for Double-sided Silicon Strip Detectors 13th February 2013 C. Irmler, T. Bergauer, A. Frankenberger, M. Friedl, I. Gfall,
The Intermediate Silicon Layers detector OUTLINE ISL inside CDFII Why the ISL? Conceptual Design Ladders and Spaceframe Rasnik Online Alignment System.
Milestones and Schedule of SVD Construction Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
The Origami Chip-on-Sensor Concept for Low-Mass Readout of Double-Sided Silicon Detectors M.Friedl, C.Irmler, M.Pernicka HEPHY Vienna.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
S Temple CLRC1 End-cap Mechanics FDR Cooling Structures Steve Temple, RAL 1 November 2001.
INFN-LNF / D. Orecchini – S. Tomassini – 06/24-25/2015 CLAS12 – RICH MECHANICS REVIEW SLIDE 1 RICH MODULE INTEGRATION IN CLAS_12 – LAST LAYOUT RICH MODULE.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD IR Mechanics 7 th B2GM.
27 January 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Mechanics and Cooling DEPFET Meeting Prag.
SVD Mechanics 21th B2GM Florian Buchsteiner (HEPHY Vienna)
1 Mechanics news from KEK S.Tanaka (KEK) SVD/PXD meeting SVD parallel session.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1.
7 th B2GM SVD Summary 19 November 2010 Markus Friedl (HEPHY Vienna)
Origami Chip-on-Sensor Design: Progress and New Developments 19th September 2012 TWEPP 2012, C. Irmler (HEPHY Vienna) TWEPP 2012, Oxford University.
Collision Analysis SVD Meeting Markus Friedl (HEPHY Vienna) 18 June 2015.
Jochen Ebert, Uni Karlsruhe1 Powering via cooling pipes very first results.
Jigs and procedure for ladder assembly BelleIInote #8 6 th Feb 2012 Yoshiyuki Onuki University of Tokyo 1.
ACFA-7; Taipei, Nov 2004 H.Weerts status Si licon D etector Status H.Weerts Fermilab/Michigan State Univ. (Progress on Si-tracker layout)
Construction and Test of the First Belle II SVD Ladder Implementing the Origami Chip-on-Sensor Design 29 Sept TWEPP 2015, C. Irmler (HEPHY Vienna)
The Belle II Silicon Vertex Detector Florian Buchsteiner (HEPHY Vienna)
The Mechanical Structure for the SVD Upgrade
SVD Mechanics Markus Friedl (HEPHY Vienna) BPAC, 26 October 2015.
11 June 2015 Thomas Bergauer (HEPHY Vienna) Belle II SVD beam Test SPS 2015 SPS users meeting.
1 ILD meeting LAL M. Joré – Integration status Matthieu Joré – 25 th of May ILD integration status and open issues.
12/3/2015R. Mountain, Syracuse University LHCb CO2 Cooling EDR2.
Update on Micro Channel Cooling Collaboration Meeting , G. Nüßle.
Jan. 28, 2014W. Bertl, PSI BPIX Cooling Status W. Bertl, PSI.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
10 September 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Upgrade, Mechanics and Cooling OEPG/FAKT Meeting 2010.
SVD Ribs and SLM M.Friedl, F.Buchsteiner, R.Thalmeier (HEPHY Vienna) 27 May 2014.
SVD assembly S.Tanaka. Outline SVD assembly work is individual with Beam pipe, heavy metal shield and PXD system. –Assembly work will be done on two assembly.
Technical Design for the Mu3e Detector Dirk Wiedner on behalf of Mu3e February Dirk Wiedner PSI 2/15.
Ladder Mount R&D T. Tsuboyama (KEK) 2 Oct T. Tsuboyama (KEK) 2 Oct
Origami and Cooling 24th September 2012 C. Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
SVD IR mechanics status S.Tanaka SVD mechanics session.
25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) Ladder Assembly Procedure Belle II – New Collaborators Meeting.
7 February 2012 Annekathrin Frankenberger (HEPHY Vienna) Open CO 2 Cooling System at the beam test Belle II SVD-PXD Meeting.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
13 Januar 2011 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Cooling Cooling Meeting Karlsuhe.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
SPS High Energy LSS5 Thermal contact & cooling aspects
Schedule 24 September 2012 Christian Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
SVD Slow Control Markus Friedl (HEPHY Vienna) DAQ/SC Kickoff Meeting, 8 November 2012.
Silicon Vertex Detector Schedule 23 July 2012 Christian Irmler (HEPHY Vienna) 12 th Open Meeting of the Belle II Collaboration.
EC: 7 DISK concept Preliminary considerations
8 September 2011 Belle II SVD/PXD Installation Procedure Mockup Meeting Munich Immanuel Gfall (HEPHY Vienna)
Florian Buchsteiner (HEPHY Vienna)
SVD Electronics Constraints
Progress with System Integration of the CBM Silicon Tracking Detector
Status of GASPARD mechanics
Update of MVD services and requests
Update on the SVD construction
7th Belle II VXD Workshop, Prague
Christoph Schwanda (HEPHY Vienna) For the Belle II SVD group
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Discussion items SVD mechanics session.
KEK IR status Shuji Tanaka KEK DEPFET workshop 2011/2/7-9 1.
Local Supports for Inclined Layout: CERN Update
Cooling pipes and Space for Services
Micro Vertex Detector of PANDA Strip Detector
? ENDCAP: Mechanics IFIC-Valencia.
Vertex Detector Mechanical R&D Design Questions and Issues
Integration issues at IHEP
Rod adaptors for module tests Module positioning studies
WG4 – Progress report R. Santoro and A. Tauro.
Comments to the SVD4 structure
Presentation transcript:

18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD Mechanics IDM

SVD Mechanics 2Immanuel Gfall (HEPHY Vienna)4 November 2010 Current Ladder 6 Design The ladder is 645 mm long with a distance between the ribs of 16.5 mm Ribs are attached to end ring mounts End ring mounts also connect hybrid boards to cooling channels integrated in the end rings APV25 aligned in one line Slanted / wedge sensor in the forward region to minimize sensor count and material budget 2Immanuel Gfall (HEPHY Vienna) Sensor CF Ribs Mount Structure Hybrid Board Origami Modules Origami Modules Sensor without Origami Wedge Sensor

SVD Mechanics 3Immanuel Gfall (HEPHY Vienna)10 September 2010 End Ring Ladder Link 15 mm wide mount block supports CF ribs Alignment purpose and CTE compensation Mount point for hybrid boards Thermal control through conduction and cooling ribs Design will be overhauled! 3Immanuel Gfall (HEPHY Vienna) Cable ConnectorsPrecision Pins Ladder Fixture Mountblock Hybrid BoardCooling Ribs

SVD Mechanics End Ring Design Fix the ladders to the support structure Offer space for cable and cooling tubes routing Need to be cooled Two available design scenarios: Open end ring Closed end ring 4Immanuel Gfall (HEPHY Vienna)18 November 2010

SVD Mechanics Open End Ring +Interesting choice from service routing point of view +Cables and tubes can be installed “from top”  Overly complex shape  Can easily get damaged during machining  Heat sink too far away from source 5Immanuel Gfall (HEPHY Vienna)18 November 2010 Cooling grooves Ladder Fixture

SVD Mechanics Static Simulation 6Immanuel Gfall (HEPHY Vienna)18 November 2010 Maximum deformation under full load: 5 µm Setup: Ladder equivalent mass has been applied to each mount point and gravitational sag has been simulated

SVD Mechanics Closed End Ring Similar to SVD 2 design but bigger Cooling channel is implemented into the ring Thermocompression bonding is used End ring consists of four parts, two are bonded together 7Immanuel Gfall (HEPHY Vienna)18 November 2010 Cooling inlet Split Line Cooling outlet (not visible in picture) Cooling Channel

SVD Mechanics Static Pressure Simulation 100 bar pressure 60 g weight per fixture Maximum deformation: mm 8Immanuel Gfall (HEPHY Vienna)18 November 2010

SVD Mechanics Forward Region “Old Solution” 9Immanuel Gfall (HEPHY Vienna)18 November 2010 Beam Mask End Rings

SVD Mechanics Service Ways 10Immanuel Gfall (HEPHY Vienna)18 November 2010 Ribbon Cables CAD study to show if service space is available Almost straight cable paths are possible Study shows that there is still space left

SVD Mechanics Current Status Added components that fix certain parameters Interesting concept for end ring cooling Estimation of beam mask shape / size Updated isolation/support shell 11Immanuel Gfall (HEPHY Vienna)18 November 2010 Beam Mask Support Cone Hybrid Board

SVD Mechanics Support Assembly Built around beam pipe SVD support structure is split into halves Beam mask needs to be split as well 12Immanuel Gfall (HEPHY Vienna)18 November 2010 Beam Mask End Rings Support Cone Patch Panel Space

SVD Mechanics Space Requirement SVD 13Immanuel Gfall (HEPHY Vienna)18 November 2010

SVD Mechanics Barrel Support 14Immanuel Gfall (HEPHY Vienna)18 November 2010 SVD 2 had a carbon fiber shell to combine forward and backward support Belle 2 SVD needs thermal insulation (Airex cover) Carbon fiber-Airex sandwich Adds stiffness that could be of use during installation Does not add more material as is present in SVD 2 Carbon Fiber SandwichCarbon Fiber Layer Airex Core

SVD Mechanics Installation Support Proposal SVD will be very heavy Suitable support for installation required “Sled” from SVD 2 not sufficient Oil drill style sliding tube for installation support 15Immanuel Gfall (HEPHY Vienna)18 November 2010 Oil Drill Style Tube Slide Support Flange SVD

SVD Mechanics CO 2 Cooling Status Sophisticated open CO 2 system under development Goal is to learn a lot about controlling / running a cooling plant Components are selected and bought Current work: plant layout Goal is to have a compact and transportable system Annekathrin Frankenberger and I are working on this system 16Immanuel Gfall (HEPHY Vienna)18 November 2010 CAD Model of Mass flow control valve

SVD Mechanics Cooling: CO 2 Blow System 17Immanuel Gfall (HEPHY Vienna)10 September 2010 T= 23°C P=57bar T> -20°C P=57bar T= -20°C P=20bar

SVD Mechanics Components already in Vienna 18Immanuel Gfall (HEPHY Vienna)18 November 2010 Massflowmeter + Control Pressure Regulator Backpressure Regulator Pressure Sensor 50µm Wallthickness Coolingtube!!!

SVD Mechanics Outlook Complete overhaul of the ladder mount support Refinement of end ring structure Finding better manufacturing solution for ribs Tweaking and tuning of CFRP support Build and run the CO 2 cooling system 19Immanuel Gfall (HEPHY Vienna)18 November 2010

SVD Mechanics Backup 20Immanuel Gfall (HEPHY Vienna)18 November 2010

SVD Mechanics Mechanical Feasibility of Slanted Design 21Immanuel Gfall (HEPHY Vienna)18 November 2010 Angle is determined by 2D cutout precisionManageable Stiffness of rib around the angled sectionSufficient Slanted ribs are shorter and have to support less weightIdeal End ring design and space allocationNo concern Beam mask thickness and space with slanted optionSufficient Knee is reinforced by Crossply Conclusion: Plausible but…

SVD Mechanics … there are challenges 22Immanuel Gfall (HEPHY Vienna)18 November 2010 Production of ribs is difficult because of small applicable forces for clamping Rib vibrates during routing Water cutting could also lead to mechanical degradation Better rib end ring link solution Twist of sensor plane due to mechanical imperfection There are even more! Same problems for both options except for angle precision!