IWBS 2004 PSI, Grinderwald, Switzerland 6-10 December 2004 1 Orbit Stability: Recent Activities at ELETTRA, D. Bulfone Orbit Stability: Recent Activities.

Slides:



Advertisements
Similar presentations
M.Gasior, CERN-AB-BIBase-Band Tune (BBQ) Measurement System 1 Base-Band Tune (BBQ) Measurement System Marek Gasior Beam Instrumentation Group, CERN.
Advertisements

Beam position monitors LCABD Plenary meeting Bristol, 24th March 2009 A. Aryshev, S. T. Boogert, G. Boorman, S. Molloy, N. Joshi JAI at Royal Holloway.
1 Slow Global Orbit Feedback at Pohang Light Source (PLS) Heung-Sik Kang Pohang Accelerator Laboratory Pohang, Korea.
FAST ORBIT CORRECTION AT THE ESRF Eric Plouviez on behalf of: J. Chavanne, J.M. Koch, J.L. Pons, F. Uberto, L. Zhang.
Laser to RF synchronisation A.Winter, Aachen University and DESY Miniworkshop on XFEL Short Bunch Measurement and Timing.
Low Emittance Program David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education CesrTA.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Stability Workshop April , 2007 NSLS-II Electrical Systems G. Ganetis NSLS-II Electrical Systems NSLS-II.
Searching for Quantum LOVE at the Australian Synchrotron Light Source Eugene Tan On behalf of Rohan Dowd 120/10/2010Eugene Tan – IWLC 2010, Genega ASLS.
29/06/2007FOFB at Diamond1 Fast Orbit Feedback (FOFB) at Diamond Guenther Rehm, Head of Diagnostics Group.
Concepts for Combining Different Sensors for CLIC Final Focus Stabilisation David Urner Armin Reichold.
Alignment and Beam Stability
Beam Instrumentation for Orbit Stability I. Pinayev.
Volker SchlottIWBS’04, Grindelwald, Report on internal „mini-workshop on beam stability at SLS” SLS PAUL SCHERRER INSTITUT The workshop.
Characterization of Fast Orbit Feedback System Om Singh, APS, ANL NSLS-2 Beam Stability Workshop BNL, April 18-20, 2007.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
Performance Improvement of APS Booster Ring Dipole Magnet Power Supplies Ju Wang The 3 rd Workshop on Power Converters for Particle.
12/6/2004ALS, C. Steier, IWBS IWBS 2004: ALS Facility Report Christoph Steier, A. Biocca, M. Chin, E. Domning, G. Portmann, D. Robin, T. Scarvie,
M.Gasior, CERN-BE-BIBE-KT Innovation Day, 3 June Base Band Tune (BBQ) measurement systems - observing beam oscillations with sub-micrometre amplitudes.
Digital Signal Processing and Generation for a DC Current Transformer for Particle Accelerators Silvia Zorzetti.
SPIE, PA-IVKrzysztof Czuba1 Improved fiber-optic link for the phase reference distribution system for the TESLA technology based projects Krzysztof.
Photon Beam Position Monitors and Beam Stability at the Swiss Light Source E. van Garderen, J. Krempaský, M. Böge, J. Chrin, T. Schmidt Paul Scherrer Institute,
Orbit Control For Diamond Light Source Ian Martin Joint Accelerator Workshop Rutherford Appleton Laboratory28 th -29 th April 2004.
Problems setting-up the ALBA FOFB Problems setting-up the ALBA FOFB DEELS May - ESRF Angel Olmos.
Peter Spiller, DIRAC Kick-off meeting Peter Spiller Design Study Group DIRAC kick-off meeting SIS100.
Activities on the Orbit Feedback System for the Super-SOR Light Source SRL-ISSP, University of Tokyo Norio Nakamura 3rd International Workshop on Beam.
1 C. Simon CLIC Instrumentation workshop BPM C. Simon on behalf of the Saclay’s group CLIC Instrumentation workshop 2 nd - 3 rd June.
The Cavity Beam Position Monitor (BPM) Massimo Dal Forno Paolo Craievich, Raffaele De Monte, Thomas Borden, Andrea Borga, Mauro Predonzani, Mario Ferianis,
3rd International Workshop on Beam Orbit Stabilization - IWBS2004 December 6-10, 2004 Hotel Kirchbühl, Grindelwald, SWITZERLAND Orbit Stabilization at.
1 BROOKHAVEN SCIENCE ASSOCIATES Issues on Closed Orbit Feedback for NSLSII NSLS-II Stability Workshop April 18-20, 2007 Li-Hua Yu.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
1 BROOKHAVEN SCIENCE ASSOCIATES Stability Issues NSLS-II PAC Meeting May 24, 2007 S. Krinsky.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
1 G9a -FROST. 2 Experiments FROST New generation of CLAS photoproduction experiments with FROzen Spin Polarized Target (FROST) E02-112: γp→KY (K + Λ,
F Beam Line Tuners Vic Scarpine Instrumentation DoE Review Oct 28-31, 2002.
1 BROOKHAVEN SCIENCE ASSOCIATES The use of fast-modulated elliptically polarized soft x-rays in the detection of small polarization signals Cecilia Sánchez-Hanke.
Jørgen S. Nielsen Institute for Storage Ring Facilities (ISA) Aarhus University Denmark 1 ESLS-RF 14 (29-30/9 2010), ASTRID and ASTRID2 new LLRF.
Collimator BPM electronics – Results from the lab, SPS and LHC
B. Caron, G. Balik, L. Brunetti LAViSta Team LAPP-IN2P3-CNRS, Université de Savoie, Annecy, France & SYMME-POLYTECH Annecy-Chambéry, Université de Savoie,
Experience Laurent S. Nadolski Accelerator Physics Group On behalf of the Sources and Accelerator Division.
Recent Work Towards Increasing the AP2 & Debuncher Aperture – Keith Gollwitzer – May 9, Recent Work Towards Increasing the AP2 & Debuncher Aperture.
R.SREEDHARAN  SOLEIL main parameters  Booster and storage ring low level RF system  New digital Booster LLRF system under development  Digital LLRF.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Diagnostics and Optimization Procedures for Beamline Control at BESSY A. Balzer, P. Bischoff, R. Follath, D. Herrendörfer, G. Reichardt, P. Stange.
Advanced Optics Control, CERN, Masamitsu Aiba, PSI Recent optics measurements at SLS M. Aiba, M. Böge, Á. Saá Hernández, D. Mayilyan and.
Photon Beam Position Monitors and Beam Stability at the Swiss Light Source Elsa van Garderen March 12 th, 2008.
ATF2 beam operation status Toshiyuki OKUGI, KEK The 9 th TB&SGC meeting KEK, 3-gokan Seminar Hall 2009/ 12/ 16.
U. Raich CERN Accelerator School on Digital Signal Processing Sigtuna Digital Signal processing in Beam Diagnostics Lecture 1 Ulrich Raich CERN.
Electron beams in order to sense nm-size mechanical vibrations? CERN: Marek Gasior: BBQ electronics (Andrea Boccardi: VME electronics) Juergen Pfingstner:
Booster bpm’s Jim Crisp 3/29/06. Plate width and linearity with the response linearized along the axis 60 and 20 degree plates become nonlinear in the.
NLC - The Next Linear Collider Project Keeping Nanometer Beams Colliding Vibration Stabilization of the Final Doublet Tom Himel SLAC NLC MAC review October.
4. Operations and Performance M. Lonza, D. Bulfone, V. Forchi’, G. Gaio, L. Pivetta, Sincrotrone Trieste, Trieste, Italy A Fast Orbit Feedback for the.
Beam Diagnostics Seminar, Nov.05, 2009 Das Tune-Meßverfahren für das neue POSI am SIS-18 U. Rauch GSI - Strahldiagnose.
1 Jean-Claude DENARD Workshop on Accelerator R&D for Ultimate Storage Rings Version 2.0 ORBIT FEEDBACK SYSTEMS and XBPMs J-C. Denard, N. Hubert * and L.
1 BROOKHAVEN SCIENCE ASSOCIATES Beam Stability Overview NSLS-II CFAC Meeting May 8, 2007 S. Krinsky.
Midterm Review 28-29/05/2015 Progress on wire-based accelerating structure alignment Natalia Galindo Munoz RF-structure development meeting 13/04/2016.
1CEA/ Saclay/ SACM CARE/SRF/WP11 Development of a new Beam Position Monitor for FLASH, XFEL and ILC Cryomodules Claire Simon, Michel Luong, Stéphane Chel,
Accuracy of the orbit measurement by KEKB BPM system for the study of ILC damping ring H. Fukuma (KEK) Requirement for the accuracy of BPM data.
Fast Global Orbit Feedback for the Australian Synchrotron Eugene Tan Accelerator and Operations 13/12/20101 ACAS Workshop on Accelerator Feedback Systems.
Beam Instrumentation of CEPC Yue Junhui (岳军会) for the BI Group Accelerator Center, IHEP HF2014.
Ultra-low Emittance Coupling, method and results from the Australian Synchrotron Light Source Rohan Dowd Accelerator Physicist Australian Synchrotron.
MACHINE OPERATION AT ALBA Montse Pont, CELLS-ALBA 16-18/12/2013.
Libera and ELETTRA Marco Lonza, Giulio Gaio, Vincenzo Forchi’
Status of the ASTRID2 facility
Coupling Correction at the Australian Synchrotron
SOLEIL Fast Orbit Feedback System
Commissioning the Fast Orbit Feedback System at SSRF
Latency measurements on the ALBA Electron units
Rogowski coils as beam position monitors
Rogowski coils as beam position monitors
Fast Orbit Feedback at the SLS
Presentation transcript:

IWBS 2004 PSI, Grinderwald, Switzerland 6-10 December Orbit Stability: Recent Activities at ELETTRA, D. Bulfone Orbit Stability: Recent Activities at ELETTRA D. Bulfone - ELETTRA Operating Scenario - Orbit Instability Sources - Machine Alignment - ID Feedforward Systems - Fast Local Orbit Feedback Systems - Low-gap BPMs - Feedback Electronics - Control Algorithms - Operation & Performance - Developments Outlook

IWBS 2004 PSI, Grinderwald, Switzerland 6-10 December Orbit Stability: Recent Activities at ELETTRA, D. Bulfone ELETTRA Operating Scenario PM = Pure Permanent Magnet, HYB = Hybrid, EM = Electromagnetic SCW = Superconducting - Machine Operating Parameters: - Insertion Devices: - 23 ID segments installed (6 APPLE-II) - All eleven long straights filled.

IWBS 2004 PSI, Grinderwald, Switzerland 6-10 December Orbit Stability: Recent Activities at ELETTRA, D. Bulfone - ground settlings and temperature fluctuations - thermal load on vacuum chamber: orbit shift up to 100/30  m H/V at ID center within 2 hours after the end of energy ramping (without any orbit correction or feedback) - ID gap changes: residual orbit distortion, not completely compensated by feedforward systems: <3-4  m rms on closed orbit and up to ~5  m at ID center after recalibration - mechanical vibrations: recently increased bump of components around 23 Hz, due to magnet cooling water flux: <10  m at ID centre horizontally - 50 Hz and its harmonics: from mains: power supplies, etc…: < 6  m for each component 0.01 Hz 0.1 Hz 1 Hz 10 Hz 100 Hz Frequency - 23 Hz Hor. mechanical vibrations of Q2_S2.2 quadrupole - Hor. & Ver. beam spectra at low-gap BPM, Section 2 Orbit Distortion and Instability Sources

IWBS 2004 PSI, Grinderwald, Switzerland 6-10 December Orbit Stability: Recent Activities at ELETTRA, D. Bulfone Machine Alignment - Complete machine re-alignment, including insertion devices, was performed in January and August ‘04 shut-downs. - A laser tracker is used for magnet alignment. P2P 1.3 mm P2P Corrected 200 µm Radial displacement of Bending magnets before and after (blue line) alignment

IWBS 2004 PSI, Grinderwald, Switzerland 6-10 December Orbit Stability: Recent Activities at ELETTRA, D. Bulfone Vertical orbit and tune dependence on Horizontal orbit Before and After Re-alignment -Prior to machine re-alignment: machine was sensitive to orbit position: e.g., feeddown effects (tune shifts with amplitude) and coupling of x-y motion. - Following the re-alignment: Tune and chromaticity changes with no orbit distortions, small corrector strengths, faster converging orbit correction, faster calibrations of ID correction coils. Machine Alignment

IWBS 2004 PSI, Grinderwald, Switzerland 6-10 December Orbit Stability: Recent Activities at ELETTRA, D. Bulfone ID Feedforward Systems - Closed orbit distortion created by ID gap/phase changes is compensated by feedforward systems based on two pairs of correction coils. - Correction coils look-up table values are obtained by off-line calibration for different gap/phase values, aimed at minimizing the rms of the difference orbit. - About 10 table entries/coil (10x10 for APPLE-II), linearly interpolated by the feedforward loop, which runs when the gap/phase change (from 2 to 10 Hz for the different ID cases). - Electromagnetic Elliptical Wiggler: - Residual vertical orbit distortion measured by low-gap BPMs, not completely compensated by feedforward systems ID6, gap 150 -> 30 mm ID8.1, ph 0 -> 20 -> -20 -> 0 mm 4.5 μm 5 μm - Feedforward system for the compensation of the EEW dynamic orbit distortions allows to change the radiation polarization in AC mode (trapezoidal, sinusoidal up to 100 Hz) with no measurable orbit perturbation.

IWBS 2004 PSI, Grinderwald, Switzerland 6-10 December Orbit Stability: Recent Activities at ELETTRA, D. Bulfone FAST LOCAL ORBIT FEEDBACK

IWBS 2004 PSI, Grinderwald, Switzerland 6-10 December Orbit Stability: Recent Activities at ELETTRA, D. Bulfone Fast Local Orbit Feedback - Two LOF systems in routine operation during users shifts (Section 2 & 7) - Correct beam position & angle on both planes at ID centre - Use two low-gap BPMs and four corrector magnets - 8 kHz rate

IWBS 2004 PSI, Grinderwald, Switzerland 6-10 December Orbit Stability: Recent Activities at ELETTRA, D. Bulfone - Low vertical gap (14 mm), following the adjacent ID vacuum chamber profile + bellows 14mm Carbon fiber reference column Contact-free capacitive sensors - Mechanical movements monitored (<50 nm rms resolution) with respect to a Carbon fiber reference column (thermal expansion coeff. = 1.9 µm/ºCm): taken into account in the final beam position reading Low-gap BPM 1 Low-gap BPM 2 Low-gap BPMs

IWBS 2004 PSI, Grinderwald, Switzerland 6-10 December Orbit Stability: Recent Activities at ELETTRA, D. Bulfone Feedback Electronics RF Front End Digital Receivers CPU PowerPC Board VME Bus PCI Bus 4 8 PMC 8 ch DAC RF Front End Digital Receivers 4 IF Signals V A1 V B1 V C1 V D1 V A2 V B2 V C2 V D2 BPM Detector Digital Processing Interface to Corrector PS

IWBS 2004 PSI, Grinderwald, Switzerland 6-10 December Orbit Stability: Recent Activities at ELETTRA, D. Bulfone Digital Receivers Feedback Electronics - BPM Detector: - RF Front-end translates RF signals to Intermediate Frequency (20 MHz). - RF02 from IT. - VME Digital Receiver (collaboration with SLS and IT) sampling at 62.5 MSample/s, 14 bits. RF Front-ends

IWBS 2004 PSI, Grinderwald, Switzerland 6-10 December Orbit Stability: Recent Activities at ELETTRA, D. Bulfone No dedicated DSPs - Digital Processing: - Feedback digital processing algorithms executed at 8 kHz rate by a “standard” control system PowerPC (G4 at 400 MHz) CPU board - GNU/Linux with real-time extension RTAI (Real Time Application Interface). - Same CPU board performs feedback supervision, 8 kHz data acquisition and executes the usual TANGO control system tasks. Feedback Electronics PowerPC CPU board

IWBS 2004 PSI, Grinderwald, Switzerland 6-10 December Orbit Stability: Recent Activities at ELETTRA, D. Bulfone - Latencies of an Interrupt Service Routine and of a thread triggered by a VME interrupt under Linux/RTAI [Executed on the PowerPC CPU board in a heavily loaded configuration] - Context switching time between two threads [Executed on the same hw/sw configuration] Feedback Electronics - Real-Time Performance Figures:

IWBS 2004 PSI, Grinderwald, Switzerland 6-10 December Orbit Stability: Recent Activities at ELETTRA, D. Bulfone Feedback DAC 16 bits DC DAC 16 bits Corrector PS setting signal Analog Sum - The same corrector magnets/power supplies normally used for ‘standard’ DC orbit correction are also employed by the fast feedback system. - The corrector power supply set point is obtained as the sum of the signals generated by the ‘standard’ DC DAC (16 bits) and the feedback DAC (16 bits), which acts on a reduced current range. - 8 channel PMC DAC mezzanine plugged on the CPU board Feedback Electronics - Interface to Corrector Power Supplies: PMC DAC mezzanine

IWBS 2004 PSI, Grinderwald, Switzerland 6-10 December Orbit Stability: Recent Activities at ELETTRA, D. Bulfone Control Algorithms Measured open-loop system frequency response, fit by a 3 rd order polynomial in z. - Dynamic behavior dominated by corrector magnet + power supply: - 3dB cut-off frequency of 70 Hz. - Negligible phase delay induced by eddy currents in stainless steel vacuum chamber: - System Dynamics: Hz 70

IWBS 2004 PSI, Grinderwald, Switzerland 6-10 December Orbit Stability: Recent Activities at ELETTRA, D. Bulfone - The PID: - Low Pass Filter limits input signal dynamics to avoid non-linearities of corrector power supplies: cut-off frequency 150 Hz. - Closed-loop frequency response with PID (K P =3, K I =0.01, K D =10): - 3dB point at 150 Hz. - The PID: - The Harmonic Suppressors: Block diagram of the model used to simulate closed-loop response. - Delay from BPM to corrector DACs is 330 μs. - Remove specific periodic components, like those induced by the mains (50 Hz and harmonics). - Digital resonator placed in the loop acts as a notch filter if the open loop phase rotation at the resonance frequency is 360º - Run in parallel to the PID Control Algorithms

IWBS 2004 PSI, Grinderwald, Switzerland 6-10 December Orbit Stability: Recent Activities at ELETTRA, D. Bulfone - Mean values of the four LOF vertical corrector currents while opening/closing the gap of some IDs (LOF ON). - LOFs activated at the end of injection + ramping procedure, after orbit correction at all ID and bending source points. - Corrected horizontal/vertical position values at low-gap BPMs taken as set point by LOFs. - Periodic orbit correction disabled in the corresponding ID straight sections. - To avoid saturation, a slow loop runs every minute and transfers, through the control system, the mean values of the LOF DACs to the DC DACs. Operation & Performance - Given the reduced range of the corrector current available for the LOFs, significant orbit drifts may saturate the feedback DACs. [s]

IWBS 2004 PSI, Grinderwald, Switzerland 6-10 December Orbit Stability: Recent Activities at ELETTRA, D. Bulfone Operation & Performance - Horizontal and vertical beam position spectra measured by a low-gap BPM: LOF OFF (blue) LOF ON with PID only (green) LOF ON with PID + HS at 50, 100, 150, 200, 250, 300 Hz (red) - Beam Position Spectra (1): Vertical Horizontal

IWBS 2004 PSI, Grinderwald, Switzerland 6-10 December Orbit Stability: Recent Activities at ELETTRA, D. Bulfone - Horizontal photon beam position spectra measured by photon BPM: LOF OFF (blue) LOF ON with PID + HS at 50, 100, 150, 200, 250, 300 Hz (red) Operation & Performance - Beam Position Spectra (2):

IWBS 2004 PSI, Grinderwald, Switzerland 6-10 December Orbit Stability: Recent Activities at ELETTRA, D. Bulfone - rms of position and angle of source point at ID centre over 8-hour period with LOF ON, calculated from the two low-gap BPM readings: - Time Domain Measurements: Horizontal (left) and vertical (right) beam position measured by a low-gap BPM with LOF OFF / ON (8 kHz acquisition rate, low-pass filtered at 250 Hz) Operation & Performance LOF ON LOF OFF Horizontal LOF ON LOF OFF Vertical [8 kHz BPM acquisition rate][20 Hz BPM acquisition rate]

IWBS 2004 PSI, Grinderwald, Switzerland 6-10 December Orbit Stability: Recent Activities at ELETTRA, D. Bulfone - Mirror current with LOF OFF/ON (one measurement every 3 s) - With PID + 5 Harmonic Suppressors, noise reduced from about 1.2% to 0.3% - Measurements taken at different values of the stored electron beam current. - Effect of ID 3, 8 and 9 gap movement - Mirror current with LOF OFF/ON during spectrum scan (one measurement every 13 s, 25 min total period) - Measurements taken at different values of the stored electron beam current. - Beamline Measurements (1): Operation & Performance

IWBS 2004 PSI, Grinderwald, Switzerland 6-10 December Orbit Stability: Recent Activities at ELETTRA, D. Bulfone - First Harmonic of the Undulator Spectrum with LOF OFF (blue) and ON (red). Operation & Performance - Beamline Measurements (2): - Zoomed first Harmonic of the Undulator Spectrum with LOF OFF (blue) and ON (red).

IWBS 2004 PSI, Grinderwald, Switzerland 6-10 December Orbit Stability: Recent Activities at ELETTRA, D. Bulfone - Histogram of the electron beam xy position (320 position samples at 8 kHz, refreshed at 25 frames/s) - Beam position monitoring & FFT, refreshed at 25 frames/s - LOF is OFF. Operation & Performance - A Beam Position Monitoring Tool (1):

IWBS 2004 PSI, Grinderwald, Switzerland 6-10 December Orbit Stability: Recent Activities at ELETTRA, D. Bulfone - Real-time observation of the LOF effect. - PID (K P =3, K I =0.01, K D =5) + 5 Harmonic Suppressors at 23, 50, 100, 150 and 200 Hz Operation & Performance - A Beam Position Monitoring Tool (2): FEEDBACK OFF FEEDBACK ON

IWBS 2004 PSI, Grinderwald, Switzerland 6-10 December Orbit Stability: Recent Activities at ELETTRA, D. Bulfone - LOFs do not stabilize orbit at bending magnet sources - Cross-talk between many LOFs (not measurable now) could become an issue. Fast Global Orbit Feedback: - Use (potentially) all existing rhomboidal BPMs equipped with state-of-art detectors (implies upgrade of all BPM electronics) - 12 feedback substations (1 per sector) connected by a real-time “reflective memory” network, sharing all BPM readings and correction values - Existing LOF stations already designed to be integrated in the GOF architecture Developments Outlook - Full Energy Injector: - A full energy Booster injector, allowing top-up mode, is under construction.

IWBS 2004 PSI, Grinderwald, Switzerland 6-10 December Orbit Stability: Recent Activities at ELETTRA, D. Bulfone - Thanks to the following Groups: - Alignment, Metrology and Thermal Loads - Controls - Insertion Devices - Instrumentation - Machine Physics