26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.

Slides:



Advertisements
Similar presentations
24 June 2010 Immanuel Gfall (HEPHY Vienna) CO 2 Cooling for PXD/SVD IDM Meeting.
Advertisements

CO2 cooling for FPCCD Vertex Detector Yasuhiro Sugimoto KEK 1.
A Low Mass On-chip Readout Scheme for Double-sided Silicon Strip Detectors 13th February 2013 C. Irmler, T. Bergauer, A. Frankenberger, M. Friedl, I. Gfall,
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
The Intermediate Silicon Layers detector OUTLINE ISL inside CDFII Why the ISL? Conceptual Design Ladders and Spaceframe Rasnik Online Alignment System.
Milestones and Schedule of SVD Construction Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
Mechanical Work Plan Discussion Bill Cooper Fermilab.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD IR Mechanics 7 th B2GM.
27 January 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Mechanics and Cooling DEPFET Meeting Prag.
SVD Mechanics 21th B2GM Florian Buchsteiner (HEPHY Vienna)
1 Mechanics news from KEK S.Tanaka (KEK) SVD/PXD meeting SVD parallel session.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD Mechanics IDM.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.1 Grid Box Design 1 GLAST Large Area Telescope:
1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1.
7 th B2GM SVD Summary 19 November 2010 Markus Friedl (HEPHY Vienna)
Origami Chip-on-Sensor Design: Progress and New Developments 19th September 2012 TWEPP 2012, C. Irmler (HEPHY Vienna) TWEPP 2012, Oxford University.
, T. Tischler, CBM Collaboration Meeting, GSI Status MVD demonstrator: mechanics & integration T.Tischler, S. Amar-Youcef, M. Deveaux, D. Doering,
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
VG1 i T i March 9, 2006 W. O. Miller ATLAS Silicon Tracker Upgrade Upgrade Stave Study Topics Current Analysis Tasks –Stave Stiffness, ability to resist.
Construction and Test of the First Belle II SVD Ladder Implementing the Origami Chip-on-Sensor Design 29 Sept TWEPP 2015, C. Irmler (HEPHY Vienna)
The Belle II Silicon Vertex Detector Florian Buchsteiner (HEPHY Vienna)
The Mechanical Structure for the SVD Upgrade
SVD Mechanics Markus Friedl (HEPHY Vienna) BPAC, 26 October 2015.
1 Beam pipe and VXD mockup status at KEK S.Tanaka (KEK) SVD/PXD meeting.
11 June 2015 Thomas Bergauer (HEPHY Vienna) Belle II SVD beam Test SPS 2015 SPS users meeting.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
PHASE II FLIGHT-SAFETY REVIEW AMS-02 EXPERIMENT sub-detector SILICON TRACKER Roberto Battiston - AMS-02 Phase II Safety Review - Houston JSC May 21-25,
10 September 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Upgrade, Mechanics and Cooling OEPG/FAKT Meeting 2010.
Comments on ladder structure 5 Feb Toru Tsuboyama.
SVD Ribs and SLM M.Friedl, F.Buchsteiner, R.Thalmeier (HEPHY Vienna) 27 May 2014.
SVD assembly S.Tanaka. Outline SVD assembly work is individual with Beam pipe, heavy metal shield and PXD system. –Assembly work will be done on two assembly.
Technical Design for the Mu3e Detector Dirk Wiedner on behalf of Mu3e February Dirk Wiedner PSI 2/15.
,C. Kiesling, 10th BPAC Meeting, KEK, Japan, Feb. 7-9, VXD Commissioning Organizational Matters (in response to the BPAC October report) Overall.
Next chance for Service test. In the next B2GM Use of old VXD KEK The screw connection may not work. -> double scotch tape for PXD PP mock 1/4.
Ladder Mount R&D T. Tsuboyama (KEK) 2 Oct T. Tsuboyama (KEK) 2 Oct
Origami and Cooling 24th September 2012 C. Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
SVD IR mechanics status S.Tanaka SVD mechanics session.
25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) Ladder Assembly Procedure Belle II – New Collaborators Meeting.
B [OT - Mechanics & Cooling] Stefan Gruenendahl February 2, 2016 S.Grünendahl, 2016 February 2 Director's Review -- OT: Mechanics &
7 February 2012 Annekathrin Frankenberger (HEPHY Vienna) Open CO 2 Cooling System at the beam test Belle II SVD-PXD Meeting.
VXD mechanics issues S.Tanaka. Remaining issues (short term) SVD ladder mount table –Mount arm design(KEK+SVD) –Origami cooling pipe assembly procedure.
13 Januar 2011 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Cooling Cooling Meeting Karlsuhe.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
SVD Docks Markus Friedl (HEPHY Vienna) B2GM, 23 July 2012.
Schedule 24 September 2012 Christian Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
Silicon Vertex Detector Schedule 23 July 2012 Christian Irmler (HEPHY Vienna) 12 th Open Meeting of the Belle II Collaboration.
EC: 7 DISK concept Preliminary considerations
8 September 2011 Belle II SVD/PXD Installation Procedure Mockup Meeting Munich Immanuel Gfall (HEPHY Vienna)
Florian Buchsteiner (HEPHY Vienna)
The design of a photodetector unit of a new Shashlyk EM
SVD Electronics Constraints
GSI, for the CBM Collaboration
Status of GASPARD mechanics
Markus Friedl (HEPHY Vienna)
Update on the SVD construction
Christoph Schwanda (HEPHY Vienna) For the Belle II SVD group
IBL Overview Darren Leung ~ 8/15/2013 ~ UW B305.
Discussion items SVD mechanics session.
KEK IR status Shuji Tanaka KEK DEPFET workshop 2011/2/7-9 1.
Local Supports for Inclined Layout: CERN Update
Cooling pipes and Space for Services
FP420 Detector Cooling Thermal Considerations
The Quench Detection-Wire-Feedthrough Plug-In of W7-X
SVD Mechanics Group Organization & Work packages
Comments to the SVD4 structure
BPAC, 17 October 2017 VXD GND/EMC Markus Friedl (HEPHY Vienna)
Presentation transcript:

26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview

Belle II SVD Carbon Fiber Structures Immanuel Gfall (HEPHY Vienna)26 April 2013 Detector Overview The SVD consists of 4 Layers Each Layer is supported by end rings The end rings are supported by the support cones The support cones are connected with the CDC through the end flanges

Belle II SVD Carbon Fiber Structures General Dimensions Length: 925 mm Largest diameter: 313 mm Smallest diameter: mm Immanuel Gfall (HEPHY Vienna)26 April 2013 LayerRadius [mm]Ladder #Windmill °Overlap %

Belle II SVD Carbon Fiber Structures Immanuel Gfall (HEPHY Vienna)26 April 20134Immanuel Gfall (HEPHY Vienna) Design Goals of the Mechanical Structure Lowest possible material budget Maximum gravitational sag equal or lower than 100µm over a length of 700mm Minimum coefficient of thermal expansion (CTE) Match or compensation of CTE at joints Radiation hardness up to 10 Mrad Compliant with the Origami concept Reproducible production quality

Belle II SVD Carbon Fiber Structures Mechanical Component Groups Ribs Mount Blocks Ladder End rings Support Cone End flange Support shell Immanuel Gfall (HEPHY Vienna)26 April 2013

Belle II SVD Carbon Fiber Structures Ribs The ribs support the Origami Sensor Modules They are made from carbon fibers and Airex R82 Due to their sandwich composite structure, they are extremely light, stiff and have a low material budget The contact surface between the ribs and the sensors are the “stand-offs” Those are pillars to separate the electrically conductive fiber from the sensor Inserts glued into each hole serve as the rib mount block interface Immanuel Gfall (HEPHY Vienna)26 April 2013

Belle II SVD Carbon Fiber Structures Mount blocks The are the interface between the ribs and the main support structure They serve also as a cooling block that conducts the dissipated heat from the APV’s to the actively cooled end rings They feature the a Simple Locking Mechanism (SLM) which can be tightened from the side and does not require top access Immanuel Gfall (HEPHY Vienna)26 April 2013

Belle II SVD Carbon Fiber Structures Mount Block The mount block has been thoroughly redesigned The new design is optimized for heat transport The backward SLM is overhauled and several mockups prove the concept Thermal simulations suggests a small thermal gradient on the APV cooling contact surface ( ~2.5 K) Immanuel Gfall (HEPHY Vienna)26 April 2013 Lock mechanismHybrid Board

Belle II SVD Carbon Fiber Structures SLM Single precision pin with a groove The pin determines the position The groove is used to pull down and fix the pin in the end ring This locking mechanism is accessible during installation Immanuel Gfall (HEPHY Vienna)26 April 2013

Belle II SVD Carbon Fiber Structures Ladder A ladder consists of sensors, and readout electronic Those components are carried by the carbon fiber sandwich ribs and connected to a rigid support structure (end rings) by the mount blocks A ladder is the smallest replaceable unit within the SVD Immanuel Gfall (HEPHY Vienna)26 April 2013 APV25

Belle II SVD Carbon Fiber Structures Composition of a Ladder Immanuel Gfall (HEPHY Vienna)26 April 2013 Cooling Block / Electronics Stack NAHA Locking Mechanism (SLM4) Carbon Fiber Ribs Sensors Origami Modules on Top

Belle II SVD Carbon Fiber Structures Ladder 3 Immanuel Gfall (HEPHY Vienna)26 April 2013 Backward bridge: longer than the forward bridge, has no CTE compensation (fixed position), heat transport optimized with heat pipes Forward bridge: Trimmed to fit into the envelope, CTE compensation implemented with slots CFRP Ribs with Airex core Cables are glued and soldered directly onto the hybrid boards, no space for connectors

Belle II SVD Carbon Fiber Structures Layer 3 Differs from the other layers in many aspects No slant angle but close proximity to the adjacent layers Sensor support is a carbon fiber / Airex sandwich The proximity to the layer 4 requires a mounting scheme different from the other layers Immanuel Gfall (HEPHY Vienna)26 April 2013

Belle II SVD Carbon Fiber Structures End Ring End rings provide the interface between the ladders and the support structure The feature internal cooling channels Each layer has two end rings that are split in half Layer 3+4 share one end ring Immanuel Gfall (HEPHY Vienna)26 April 2013

Belle II SVD Carbon Fiber Structures End Ring Cooling One half end ring consists of two pieces with a half circled groove The halves are then combined with diffusion welding This process leaves a circular channel inside of the end ring without a strength sacrifice Connecters are brazed into the stainless steel end rings Immanuel Gfall (HEPHY Vienna)26 April 2013

Belle II SVD Carbon Fiber Structures Support Cones Carbon fiber cones are used to position the end rings Lightweight thin shells that provide some degree of thermal insulation Separates PXD and SVD Volume Immanuel Gfall (HEPHY Vienna)26 April 2013 Endring contact surfaces

Belle II SVD Carbon Fiber Structures End Flanges The end flanges provide an interface between the SVD and the surrounding detector This part needs to carry the full SVD load including heavy metal shielding Slots need to provide space for services (cooling, cables) End flanges encapsulate the nitrogen volume of the SVD Immanuel Gfall (HEPHY Vienna)26 April 2013

Belle II SVD Carbon Fiber Structures SVD Support Structure The support structure consists of all end rings, support cones and the end flanges This structure needs to be separable The support structure encloses the beam pipe Immanuel Gfall (HEPHY Vienna)26 April 2013

Belle II SVD Carbon Fiber Structures Support Shell The support shell couples the forward and backward end flanges Purpose is to provide mechanical stability, thermal insulation and a conductive path for grounding Immanuel Gfall (HEPHY Vienna)26 April 2013

Belle II SVD Carbon Fiber Structures SVD Support Structure The support structure consists of all end rings, support cones (end flanges provided by KEK) This structure needs to be separable The support structure encloses the beam pipe and masks Immanuel Gfall (HEPHY Vienna)26 April 2013 End Rings Support Cones End Flange Support Shell/ Thermal Envelope

Belle II SVD Carbon Fiber Structures Support Shell / End Flange Immanuel Gfall (HEPHY Vienna)26 April 2013 Service Slot Layer 3 CFRP shell - end flange interface part Design is not fixed The shell is required to implement a compensation mechanism for mechanical imperfections during assembly and later serve as the rigid exoskeleton of the SVD

Belle II SVD Carbon Fiber Structures Belle II SVD Assembly of the detector Missing in the picture: cables, cooling tubes and support shell Immanuel Gfall (HEPHY Vienna)26 April 2013

Belle II SVD Carbon Fiber Structures Cooling A closed loop CO2 system is used Operation temperature: -20°C Pressure: ~56 bar 20 bar in the evaporator Cooling tube serpentine for each half layer Immanuel Gfall (HEPHY Vienna)26 April 2013