Site Investigation and Storage Structure Sizing CNMP Core Curriculum Section 4 – Manure Wastewater Storage and Handling.

Slides:



Advertisements
Similar presentations
Cochise, Maricopa, Mohave, Navajo, Pima, Pinal, Yavapai and Yuma Counties.
Advertisements

2008 Subsurface 3D Modeling: An Application to Waterfront Project Planning and Site Evaluation Andrew S. Thomas Moffatt & Nichol 600 University St, Ste.
Site Characterization Instructional Goal: Upon completion of this topic the participant will better understand the need to identify and evaluate various.
Offices in Jefferson City, Rolla, Springfield and St. Louis, Missouri. ENVIRONMENTAL ENGINEERINGLAND - AIR - WATER GREDELL Engineering Resources, Inc.
Ground Water Mounding & P Evaluations
PHASE II ESA 2014 ESA GUIDELINES. PHASE II ESA 2014 ESA GUIDELINES PROJECT DEVELOPMENT PROCESSES –PATH 2 AND 3 PROJECTS –PATH 4 AND 5 PROJECTS W/ WORK.
Groundwater Mounding and Minnesota ISTS Rules MPCA 2/21/06.
In Situ Permeability Testing of Animal Waste Storage Ponds and Lagoons The University of Tennessee Biosystems Engineering & Environmental Science Department.
SISR : STORIE INDEX Soil Ratings. Storie Index Rating System The Storie Index Rating system ranks soil characteristics according to their suitability.
Prepared by: Earth Data N.E., Inc. August 19, 2008.
Design Parameters.
Carcass Disposal Overview. Method Selection ●Animal species ●Number of animals – Space and equipment needed ●Pathogen and its ability to persist or spread.
Carcass Disposal On-Site Burial. ●Excavated trench or pit – Decomposition – Heat ●Length of time required varies – Species and size – Total volume – Soil.
Site and Soil Investigations Terry L. BoveeSteve Lawler Professional Soil Scientists Henderson, MN 56044Rochester, MN
LANDFILL PROFILING FOR GAS, LIQUIDS AND VACUUM & ENHANCED STEAM BIOREACTORS STI Engineering By Reg Renaud.
Geotechnical Investigation Step 1 - Gather Existing Information Structure Data Bridge, building, road, wall, etc. Type - stories, loads, materials, etc.
NRC LICENSE APPLICATION PROCESS
Rainfall Runoff Management CNMP Core Curriculum Section 4 – Manure Wastewater Storage and Handling.
Getting the Big Picture How to Look at Your Watershed Indiana Watershed Planning Guide,
G3 – Environmental Geomechanics (Dr Sam Yuen)
Unified Soil Classification System Training
Soils Investigation Soil Investigation
Irrigation Water Management
Designation of Nitrate Vulnerable Zones in Romania Catalin Simota Research Institute for Soil Science and Agrochemistry Bucharest - Romania.
SITE EVALUATION BASICS OF THE TRADE. Ken Stratton.
The sand filter has to be moved from this location. The embankment cross section used in the slope stability analysis did not include the sand filter.
Farm Visit Biosecurity CNMP Core Curriculum Section 2 — Conservation Planning.
2010 Agricultural Water Resource Development Workshop Series HOW TO APPLY FOR ASSISTANCE “PRELIMINARY SITE ASSESSMENT – THE PROCESS”
The Field Office Technical Guide and Other Technical Resources CNMP Core Curriculum Section 2 — Conservation Planning.
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN PLANNING APPROACH Issued May 2009 Level II: Introduction to Design Education and Certification for Persons.
EnE 301: ENVIRONMENTAL ENGINEERING
Land Treatment and the Conservation Planning Process CNMP Core Curriculum Section 3 — Land Treatment Practices.
Geotechnical Exploration for Reach 2B of the San Joaquin River Restoration Program Nicholas Hightower Division of Engineering, Project Geology 2011 DWR.
Agricultural Careers Soil Scientist By: Dr. Frank Flanders and Ms. Anna Burgess Georgia Agricultural Education Curriculum Office Georgia Department of.
Nebraska CNMP Educational Program Records for NPDES Permit.
Field Specific Decisions: N vs P CNMP Core Curriculum Section 5 – Nutrient Management.
OVERVIEW OF OIL & GAS EXPLORATION, DEVELOPMENT and STATE REGULATION OVERVIEW OF OIL & GAS EXPLORATION, DEVELOPMENT and STATE REGULATION February 18, 2012.
Record Keeping CNMP Core Curriculum Section 7— Record Keeping.
Massachusetts Public Health Inspector Training Wastewater Certificate Program (MA PHIT WW) Session 3: Site Evaluation and Selection 1 MA PHIT- Wastewater.
By: Rick Ayers Yates County Soil & Water Conservation District
Comprehensive Nutrient Management Plans in Minnesota.
Environmental Toolbox. Technical Module Introduction.
CNMP Core Curriculum Section 4 — Manure and Wastewater Storage and Handling Emergency Action Planning.
Area I Burn Pit Santa Susana Field Laboratory RCRA Facility Investigation Work Plan February 19, 2008 Laura Rainey, P.G. Senior Engineering Geologist California.
Active Corrosion Process Nisource – COH/CKY. Objectives  Understanding the terminology –Active Corrosion –& Suspected Areas of “Active Corrosion”  Developing.
Feed Management Summary CNMP Core Curriculum Feed Management – Section 6.4.
Presented by: Uri Eliahu, GE (925) May 23, 2011 G EOTECHNICAL C ONSTRAINTS IN S TORMWATER I NFILTRATION P RACTICE.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Geotechnical Conditions Tom Joos Civil/Structural Engineer BNL Plant Engineering.
Manure Wastewater Handling & Storage Summary CNMP Core Curriculum Section 4 – Manure Wastewater Storage and Handling.
HIGHWAY DESIGN PROCESS & ROUTE LOCATION Spring 2016.
Waste Storage System Closure CNMP Core Curriculum Section 4 — Manure and Wastewater Storage and Handling.
IAEA International Atomic Energy Agency Presenter Name School of Drafting Regulations for Borehole Disposal of DSRS 2016 Vienna, Austria Siting Strategies.
Nutrient Management Planning CNMP Core Curriculum Section 4 – Nutrient Management.
Waste Characteristics and Volumes CNMP Core Curriculum Section 3 – Manure and Wastewater Storage and Handling.
Nutrient Management Summary CNMP Core Curriculum Section 5 – Nutrient Management.
Models of the Earth Section 3 Section 3: Types of Maps Preview Key Ideas Topographic Maps Topographic Maps and Contour Lines Index Contour, Contour Interval,
NRCS Update Interagency Nutrient Management Conference 2015.
SOIL MECHANICS AND FOUNDATION ENGINEERING-II (CE 311)
Geotechnical Investigation Methods and Site Characterization Presented by: Robert J. Niber, P.E. WDP & Associates, P.C. Manassas, Virginia.
SITE INVESTIGATION ARUN MUCHHALA ENGINEERING COLLEGE-DHARI
What is a published soil survey? What is a published soil survey? A soil survey is a detailed report on the soils of an area. The soil survey has maps.
Construction Inspection for FO Activities - Soils and Earthwork
Division of Engineering Geotechnical & Engineering Services Branch Project Geology Section in West Sacramento Rob Barry Supervising Engineering Geologist.
SAL INSTITUTE OF TECHNOLOGY AND ENGEENIRING RESEARCH Ahmedabad B.E (3rd Semester)-Civil-Shift 2 December-2014 Shah Disha R.( ) Gosai Beran.( )
Geotechnical Investigation
Transitioning from the Percolation Test to Soils Evaluation
Comprehensive Nutrient Management Plan Concept
Overview of US EPA & State Manure Management Regulations
HIGHWAY DESIGN PROCESS & ROUTE LOCATION
Presentation transcript:

Site Investigation and Storage Structure Sizing CNMP Core Curriculum Section 4 – Manure Wastewater Storage and Handling

CNMP Development Core Training Curriculum These course materials have been developed as a cooperative effort between five land-grant universities and The Natural Resources Conservation Service. Ames, Iowa 50011, (515) Copyright © , Iowa State University of Science and Technology. All rights reserved. Copyright Information

Objectives Students should become familiar with necessary considerations for siting and sizing waste storage facilities. In this section, students will learn what soil and geologic issues should be considered where structures should be located.

Required Materials USDA – NRCS. Conservation Practice Standard 313 Waste Storage Facility. Washington D.C. USDA – NRCS. Conservation Practice Standard 359 Waste Treatment Lagoon. Washington D.C. USDA – NRCS Animal Waste Management Field Handbook, Part 651, Chapter 10, Agricultural Waste Management System Component Design. Washington D.C. ftp://ftp.wcc.nrcs.usda.gov/downloads/wastemgmt/AWMF H/awmfh-chap10.pdf. ftp://ftp.wcc.nrcs.usda.gov/downloads/wastemgmt/AWMF H/awmfh-chap10.pdf

Siting Waste Storage Facilities

Siting Waste Storage Facilities

Be sure to identify all existing storage facilities: –Location –Surface Area –Design and Existing Capacity Discuss the need to upgrade existing facilities to meet minimum NRCS standards. Key Points -

Siting Waste Storage Facilities

Waste Storage Facility 313 Waste Treatment Lagoon 359

Site Investigation

(a) Corrosivity (b) Location of water table (c) Depth to rock (d) Stability for embankment and excavated cut slopes (e) Excavatability (f) Seismic stability (g) Dispersion (h) Permeability (i) Puncturability (j) Settlement potential (k) Shrink/swell (l) Topography (m) Availability and suitability of borrow material (n) Presence of abandoned wells and other relics of past use Site Investigation Engineering Geology Considerations in Planning -

Site Investigation

Determine Intensity of the Investigation –Your experience –Quality of information –Complexity of the site –Regulations Consult Geologist, Geotechnical Engineer, and/or a Soil Scientist for Complex Sites

Site Investigation Prior to Investigation Study Existing Background Information: –Soil Surveys –Topography Maps –Aerial Photos –Geologic Maps –Geologic Reports –Conservation Plans –Well Logs

Site Investigation –Use Existing Background Information to Identify Potential Concerns: Karst Terrain Groundwater Organic Materials Wells – “CALL BEFORE YOU DIG” Prior to site investigation.

Site Investigation Perform on-site investigation –Earthfills: 1 pit/boring/100 lineal feet –Storage Area: 1 pit/boring/10,000 ft 2 Go  2 ft. below planned grade or refusal. Find 150 % borrow for clay liner. –Red Flags: High water table Seeps in sand/gravel lenses Bedrock  2 ft. below grade

Site Investigation Characterize the Site and Borrow Materials –Use Unified Soil Classification System to log soils at the site. ASTM D-2488, Standard Practice for Description and Identification of Soils by Visual-Manual Procedures. –Be sure to identify depth, color, and texture of soil layers.

Survey site during investigation to determine: –Topography –Existing ground elevation –Water table elevations –Location and bottom elevation of geology investigation pit. Site Investigation

Goal: Adequately investigate the site to know what lies beneath. Site Investigation

Geology Note 3 - Investigation Process –Reconnaissance –Geologic Mapping –Investigational Objectives –Safety –Report Requirements –Monitoring and Evaluation Site Investigation

Testing to Request –Unified Classification (ASTM D2487) Percent Fines (< #200 Sieve) –Atterberg Limits (ASTM D4318) –Hydraulic Conductivity (ASTM D5084) –Standard Proctor (ASTM D698) Sample Size –100 pounds for tests listed above –Small sample for Natural Water Content Site Investigation

Geology Note 5 – Soil Sample Size for Laboratory Analysis

NRCS Guidance Statement of Work

Other Siting Considerations Culture Resources –Known Native Americans –Check with local NRCS office –Local Knowledge –Stop – Wait – Investigate - Document-Next Step On-Site Burial Pits –Hazardous Waste –Mortalities –Landfill material

Utilize Geologic/Soils information, NRCS procedures, policy, and guidance to investigate a site. Perform thorough site investigation and document findings. Summary