PACS IIDR 01/02 Mar 2001 Instrument Interfaces1 PACS FPU Opto-mechanical Design Overview and Interfaces J. Schubert MPE.

Slides:



Advertisements
Similar presentations
PACS IIDR, Noordwijk 1-2 Mar 2001 Chopper R. Hofferbert D. Lemke, U. Grözinger, O. Krause, U. Klaas J. Katzer (ZEISS) Max-Planck-Institut für Astronomie,
Advertisements

PACS IHDR 12/13 Nov 2003 Overview and Mechanical/Thermal IFs to FPU 1 MPE J. Schubert PACS IHDR.
FourStar Image Motion Stephen Smee (410)
PACS IIDR 01/02 Mar 2001 Photoconductor Detector Arrays1 Photoconductor Detector Arrays for PAC S IIDR - ESTEC Stefan Kraft ANTEC-GmbH Germany Günter.
PACS IIDR 01/02 Mar 2001 FPU Harness and Distribution Board1 D. Kampf KAYSER-THREDE.
PACS IHDR 12/13 Nov 2003 Photoconductor Detector Modules 1 IHDR ASTEQ-GmbH Germany Peter Dinges, Michael Harr, Heribert Krüger, Hilmar Richter, Bernd Zimmermann.
PACS IIDR 01/02 Mar 2001 Instrument Overview1 PACS Instrument Design Description and System Performance A. Poglitsch.
Test Cryostat, OGSE and MGSE PACS IHDR: MPE 12/13 Nov 2003 AIV1 PACS Test Cryostat, OGSE and MGSE Gerd Jakob MPE.
NGAO Instrumentation Overview September 2008 Updated Sean Adkins.
PACS IBDR 27/28 Feb 2002 Photoconductor Detector Arrays1 IBDR Hilmar Richter ANTEC-GmbH Germany Günter Bollmann, Peter Dinges, Otto Frenzl, Heidrun Köppen,
PACS IBDR 27/28 Feb 2002 PACS FPU FPU R. Graue, D. Kampf Kayser-Threde.
WBS & AO Controls Jason Chin, Don Gavel, Erik Johansson, Mark Reinig Design Meeting (Team meeting #10) Sept 17 th, 2007.
PACS IIDR 01/02 Mar 2001 FPU Struts, Filter Wheel, Calibration Source1 D.Kampf, Dr. Roland Graue Kayser-Threde GmbH.
DM - COA Housing. DM - COA Housing with mirrors and alignment devices installed Alignment cubes Alignment devices Dummy chopper.
1 Airborne Science Program EMASHSI Kick Off Meeting Interfaces NASA Ames Research Center University of California Santa Cruz Airborne Science & Technology.
PACS IHDR 12/13 Nov 2003 PACS FPU Optics: Concept and Alignment R. Graue, D. Kampf Kayser-Threde.
Conceptual Design Review Design Requirements The Systems Perspective Rob Hubbard Systems Engineering.
PACS IBDR 27/28 February 2002 PACS DEC/MEC1 Detectors & Mechanisms Controllers (DEC/MEC) J.-M. Gillis Centre Spatial de Liège (B)
PACS IBDR 27/ BOLC/BOLA1 BOLC / BOLA SAp/DAPNIA/DSM/CEA C. CARA WE Design Team: A. BOUERE - N. DEVIN - G. DHENAIN - E. DOUMAYROU M. SEYRANIAN -
PACS IHDR 12/13 Nov 2003 PACS FPU Distribution Boards and FPU Harness Concept R. Graue, D. Kampf Kayser-Threde.
Magellan F/5 System Status A.Szentgyorgyi/SAO/30 Apr 2005.
PACS IBDR 27/28 Feb 2002 PACS Photometer1 PACS PHOTOMETER J.L Auguères L.Rodriguez CEA/DSM/DAPNIA Service d’Astrophysique.
1 FRIDA Engineering Status 17/05/07 Engineering Status May 17, 2007 F.J. Fuentes InFraRed Imager and Dissector for Adaptive Optics.
Prototype Test of Vibration Isolation System Current Status & Schedule
Takanori Sekiguchi Anual Meeting of Physics Society of Japan Sep. 22nd, 2013) Prototype Test of Vibration Isolation System Current Status & Schedule 1.
PACS IIDR 01/02 Mar 2001 FPFPU Alignment1 D. Kampf KAYSER-THREDE.
System issues System decomposition / Product tree System specification: function, performance, interfaces, budget Work-breakdown structure.
PACS IIDR 01/02 Mar 2001 PACS  -ISVR 1  -ISVR Recommendations Introduction and Close-out A. Poglitsch.
PACS IHDR 12/13 Nov 2003 PACS FPU FPU Structure, Baffle and Straylight R. Graue, D. Kampf Kayser-Threde.
Development programs and model philosophy1 Preliminary design review Prototype program Critical design review Qualification program Qualification review.
PACS IBDR 27/28 Feb 2002 IIDR Close-out1 Close-out of IIDR Recommendations A. Poglitsch.
PACS IBDR, Garching 27/28 Feb 2002 Chopper R. Hofferbert D. Lemke, U. Grözinger, O. Krause J. Katzer (ZEISS) Max-Planck-Institut für Astronomie, Heidelberg.
ASPERA-3 Apr. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/00 Schedule statused.
PACS IBDR 27/28 Feb 2002 Optical System Design1 N. Geis MPE.
Herschel Space ObservatoryPACS Science Verification ReviewMPE 22/23 June 2006 GJ / MPE 1 PACS Test Facility Capabilities – Cryogenics and OGSE Gerd Jakob.
PACS IHDR 12/13 Nov 2003 IBDR Close-out1 Close-out of IBDR Recommendations A. Poglitsch.
PACS SVR 22/23 June 2006 PACS FPU Subunits1 FM FPU Subunits A. Poglitsch.
PACS SVR-II 18 January 2007 FM ILT overview1 The PACS FM ILT Phase I overview on actual test execution and analysis Eckhard Sturm MPE.
PACS IQR ESTEC 13 January 2005 Mech Qual Status 1 PACS IQR Mechanical Qualification Status and Plans for PFM Reinhard Katterloher R. Graue, D. Kampf, R.
PACS IBDR 27/28 February 2002 PACS Grating Assembly1 Grating Assembly E. Renotte Centre Spatial de Liège (B)
Opto-Mechanics for SNAP at UM
PACS SVR: 22/23 June 2006 MPE - Ge:Ga Detector Array1/16 Ch. Hartinger / L. Barl Ge:Ga Detector Arrays.
PACS IBDR 27/28 Feb 2002 PACS Instrument Overview1 Instrument Design/Development Status and System Performance PACS Instrument Overview A.Poglitsch MPE.
3.1.1 Optics, Optical Corrector, Mechanical Systems M. Johns, C. Claver.
PACS IBDR 27/28 Feb 2002 PACS PI Summary1 Where we are and where to go… A. Poglitsch MPE.
PACS IIDR ESTEC 01/02 March 2001 System Engineering 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher System Engineering DDVP, Model.
PACS IHDR MPE 12/13 November 2003 System Engineering 1 PACS IHDR Model Philosophy, Budgets, Interfaces and IID-B Reinhard Katterloher.
GIST 24 Meeting GERB Hardware Status 14 th December 2005 Eric Sawyer.
PVPhotFlux PACS Photometer photometric calibration MPIA PACS Commissioning and PV Phase Plan Review 21 st – 22 nd January 2009, MPE Garching Markus Nielbock.
PACS IIDR 01/02 Mar 2001 PACS Cryo Harness1 U.Grözinger, D.Lemke, R. Hofferbert Max-Planck-Institut für Astronomie Heidelberg Based on input data from.
PACS IHDR MPE, 12/13 Nov 2003 Overall Schedule1 Otto H. Bauer MPE Garching.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.
1DSM/DAPNIA/SAp – J. MartignacPACS - IHDR - MPE – Nov. 12 – 13, 2003 PACS – IHDR PhFPU Design J. Martignac CEA/DSM/DAPNIA Service d’Astrophysique.
PACS IBDR MPE 27/28 Feb 2002 System Engineering 1 PACS IBDR Model Philosophy / Development Plan Reinhard Katterloher.
FourStar Status SAC Meeting 13mar2010 Persson, Murphy, Birk, Monson, Kelson, Uomoto.
PACS IBDR MPE 27/28 Feb 2002 AIV 1 PACS IBDR Test Cryostat and OGSE Gerd Jakob MPE.
The Field Camera Unit Results from technical meeting S. Scuderi INAF – Catania.
PACS IIDR 01/02 Mar 2001 PACS Grounding Scheme and EMC1 Grounding Scheme and EMC Matthias Rumitz, MPE.
IFU Management Meeting LAM – 15/10/04. Introduction (olf)
PACS IIDR 01/02 Mar 2001 Optical System Design1 N. Geis MPE.
PACS IQR Kick-off ESTEC, 13 Jan 2005 PA/QA Status1 O.H. Bauer MPE Garching PA/QA Status.
Content Lessons from writing proposals and work on PTDR How can this meeting help to remedy problems SCT AOB.
PACS IIDR ESTEC 01/02 March 2001 Budgets and Interfaces 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Budgets and Interfaces.
990901EIS_RR_Tech.1 Overview and Status of EIS Technical Program Dr. Clarence M. Korendyke EIS US Project Scientist Naval Research Laboratory
Status of the SWAP instrument
P07307: Controls for Dynamic Suspension
P07203 Dynamometry Laboratory Infrastructure
GLAST Large Area Telescope
Presentation transcript:

PACS IIDR 01/02 Mar 2001 Instrument Interfaces1 PACS FPU Opto-mechanical Design Overview and Interfaces J. Schubert MPE

PACS IIDR 01/02 Mar 2001 Instrument Interfaces2 Summary Overview on FPU- Technical Status –Optics –FPU Structure FPU- Interface Documentation and Design Status –Overview –Cryo Mechanics –s-Ge:Ga Detector Assemblies –Bolometer Unit

PACS IIDR 01/02 Mar 2001 Instrument Interfaces3 Overview - FPU Technical Status OPTICS Design completed (local optimizations only) Stray light analysis of critical components performed (top optics) Preliminary alignment plan established Open Point  Telescope interface not frozen Diffraction analysis continued

PACS IIDR 01/02 Mar 2001 Instrument Interfaces4 Overview - FPU Technical Status FPU Structures Detailed design of: Housing compartments and substructure Easily accessable subunits (chopper, grating, bolometer…) Exchange of full compartments possible Excellent stray light suppression FPU suspension (iso-static mounting) Mirrors and mounts /procurement Distribution boards, cabling configuration /procurement Interfaces to subunits Detailed planning of manufacturing phase

PACS IIDR 01/02 Mar 2001 Instrument Interfaces5 Overview - FPU Technical Status FPU Structures (cont.) Points to be worked on Structural Analysis FPU  Values for resonance amplification FPU Mass Budget  Weight to be reduced Cannon ITT Connectors  Connectors needs to be light tight

PACS IIDR 01/02 Mar 2001 Instrument Interfaces6 Overview: Status FPU Interfaces All FPU interfaces are defined Detailed interface requirements are worked out and documented in the Subunit Specifications Detailed design of the interfaces is in good progress and its status is almost completely documented in the subunit ICDs Points to be worked on  Final vibration loads for the subunits needed  Documentation status has to be adapted to the current development status

PACS IIDR 01/02 Mar 2001 Instrument Interfaces7 Interfaces Cryo Mechanics

PACS IIDR 01/02 Mar 2001 Instrument Interfaces8 FPU - Cryo Mechanics Interface Status (I) Filter Wheel Documents: PACS-ME-RS-003 Black Body and Filter Wheel Requ. Spec. PACS-KT-ID-006 PACS FPU Filter Wheel ICD elect. optical control cabling Status I/F Design Documents: PACS-ME-ID-003 Temperature Sensors ICD elect. control cabling Status I/F Design Temperature Sensors

PACS IIDR 01/02 Mar 2001 Instrument Interfaces9 FPU - Cryo Mechanics Interface Status (II) Calibration Sources Documents: PACS-ME-RS-003 Black Body and Filter Wheel Requ.Spec. PACS-KT-ID-007 PACS FPU Calibration Sources ICD optical cabling control Status I/F Design Documents: PACS-ME-RS-009 PACS Grating Assembly Requ. Spec. PACS-CL-ID-001 ICD Grating assembly – FPU PACS-CL-ID-002 Grating to DEC ICD Grating elect. Status I/F Design optical mechan. cabling control elect.

PACS IIDR 01/02 Mar 2001 Instrument Interfaces10 FPU - Cryo Mechanics Interface Status (III) Chopper Documents: PACS-ME-RS-001 Chopper Specification PACS-KT-ID-003 Chopper Interface Control Document PACS-MA-ID-001 PACS Chopper Electrical ICD optical cabling control Status I/F Design Documents: PACS-ME-ID-004 Filters and Dichroics ICD Filters/Dichroics elect. Status I/F Design optical mechan.

PACS IIDR 01/02 Mar 2001 Instrument Interfaces11 Interfaces s-Ge:Ga Detector Assemblies

PACS IIDR 01/02 Mar 2001 Instrument Interfaces12 s-Ge:Ga Detector Assemblies Interface Status Documents: PACS-ME-RS-002 Spec. for the PACS CRE PACS-NT-DS-004 PACS Detector Array Design Spec. PACS-KT-ID-002 Ge-Detectors ICD(mech) PACS-MA-ID-002 PACS Ge Detector Electrical ICD optical Status I/F Design elect. CRE Stress Modules Housing CRE Stress Modules/Housing mechan. therm. CRE

PACS IIDR 01/02 Mar 2001 Instrument Interfaces13 Interfaces Bolometer Unit

PACS IIDR 01/02 Mar 2001 Instrument Interfaces14 Bolometer Unit Interface Status Documents: PACS-ME-RS-005 PACS Instrument Requirements Document Bolometer Specification Document will be finished after the IIDR PACS-KT-ID-005 PACS FPU Bolometer Assembly ICD Sap-PACS-CCa BOLC/BOLA Subsystem Specification Sap-PACS-CCa BOLC Electrical Interface Control Document optical Status I/F Design elect. 4K Housing Filters 2K Cooler/Bolometer mechan. therm.