Road to MeerKAT KAT-7 DBE Alan Langman. meerKAT Overview Objectives of meerKAT Location Location Location MeerKAT Engineering Specification Prototypes.

Slides:



Advertisements
Similar presentations
The Karoo Array Telescope Adrian Tiplady v1.0, v1.1, v2.0, v2.1 …
Advertisements

SKAMP Square Kilometre Array Molonglo Prototype. Supporting Institutions  University of Sydney  Argus Technologies  ATNF  ICT Centre.
SADC HPC Workshop, 2 Dec 2013, Cape Town
Antennas for MeerKAT March TDP AWG, 13-14/3/08, San Francisco MeerKAT Semantics K.A.T. = Karoo Array Telescope –KAT is Afrikaans for cat –MeerKAT:
Paul Alexander DS3 & DS3-T3 SKADS Review 2006 DS3 The Network and its Output Data Paul Alexander.
Baseband Processing and SKA Simulations using Supercomputers: Enhancing Australia‘s radio astronomy facilities and its bid for the SKA Steven Tingay Swinburne.
All things DBE… Francois Kapp Sub-system Manager: DBE On behalf of the DBE team present and past... S Rajan, E Bauermeister, A.
SKA South Africa Overview Thomas Kusel MeerKAT System Engineering Manager April 2011.
Probing the field of Radio Astronomy with the SKA and the Hartebeesthoek Radio Observatory: An Engineer’s perspective Sunelle Otto Hartebeesthoek Radio.
SKAMP - the Molonglo SKA Demonstrator M.J. Kesteven CSIRO ATNF, T. J. Adams, D. Campbell-Wilson, A.J. Green E.M. Sadler University of Sydney, J.D. Bunton,
The Green Bank Telescope a powerful instrument for enhancing ALMA science Unblocked Aperture Low sidelobes gives high dynamic range Resistance to Interference.
BDT Radio – 2b – CMV 2009/10/09 Basic Detection Techniques 2b (2009/10/09): Focal Plane Arrays Case study: WSRT System overview Receiver and.
Prototype SKA Technologies at Molonglo: 2. Antenna and Front End G.B. Warr 1,2, J.D. Bunton 3, D. Campbell-Wilson 1, R.G. Davison 1, R.W. Hunstead 1, D.A.
Sascha D-PAD Sparse Aperture Array.
Prototype SKA Technologies at Molonglo: 3. Beamformer and Correlator J.D. Bunton Telecommunications and Industrial Physics, CSIRO. Australia. Correlator.
Dec 2010 AAVP Cambridge workshop AAVP AAVS1/2-low demonstrators Jan Geralt Bij de Vaate.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Digital Signal Processing.
AA-mid demonstrator Dion Kant AAVP – 10 December 2010, Cambridge, UK.
Name1 SKA(DS) System Design Aspects 4 th SKADS Workshop, Lisbon, 2-3 October 2008 SKA(DS) System Design Aspects: building a system Laurens Bakker.
VLBI in Africa Michael Bietenholz Hartebeesthoek Radio Observatory.
Ian McCrea STFC Rutherford Appleton Laboratory Chilton, Oxfordshire, UK On behalf of the EISCAT_3D Project Consortium.
Backend electronics for radioastronomy G. Comoretto.
1 © 2011 Cisco and/or its affiliates. All rights reserved. Ultra High-speed Telecommunication Requirements for the SKA Peter Elford Business Development.
DBBC Stutus Report November 2007 G. Tuccari, W. Alef, S. Buttaccio, G. Nicotra, M. Wunderlich.
Solar observation modes: Commissioning and operational C. Vocks and G. Mann 1. Spectrometer and imaging modes 2. Commissioning proposals 3. Operational.
An African VLBI network of radio telescopes as an SKA precursor Michael Gaylard Hartebeesthoek Radio Astronomy Observatory (HartRAO) P. O. Box 443, Krugersdorp.
LOFAR AND AFRICA Daan du Toit DST – South Africa.
Interference Cancellation as a Mobile Enhancement to Improve Spectral Efficiency IEEE ComSoc Denver Chapter January 16, 2007.
MeerKAT Science Processing Jasper Horrell, SKA SA Postgrad Bursary Conference, Stellenbosch – Dec 2010.
Danie Ludick MScEng Study Leader: Prof. D.B. Davidson Computational Electromagnetics Group Stellenbosch University Extended Studies of Focal Plane Arrays.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Meeting Summary Richard.
CRISP & SKA WP19 Status. Overview Staffing SKA Preconstruction phase Tiered Data Delivery Infrastructure Prototype deployment.
Correlator Growth Path EVLA Advisory Committee Meeting, March 19-20, 2009 Michael P. Rupen Project Scientist for WIDAR.
Next Generation Digital Back-ends at the GMRT Yashwant Gupta Yashwant Gupta National Centre for Radio Astrophysics Pune India CASPER meeting Cambridge.
JVLA capabilities to be offered for semester 2013A Claire Chandler.
Nov 3, 2009 RN - 1 Jet Propulsion Laboratory California Institute of Technology Current Developments for VLBI Data Acquisition Equipment at JPL Robert.
CASPER Packetised correlators Jason Manley CASPER workshop 2009.
Integrated receivers for mid-band SKA Suzy Jackson Engineer, Australia Telescope National Facility SKADS FP6 Meeting – Chateau de Limelette – 4-6 November,
Australian Astronomy MNRF Development of Monolithic Microwave Integrated Circuits (MMIC) ATCA Broadband Backend (CABB)
MeerKAT DBE Past Present Future Alan Langman 28 September 2009.
ASKAP Capabilities John Reynolds on behalf of the SEIC and ASKAP team.
S.Montebugnoli BEST 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Stelio Montebugnoli IRA -INAF- Bologna –Italy- SKADS 4th -Lisbon- Oct 2-3, 2008.
Murchison Widefield Array (MWA) : Design and Status Divya Oberoi, Lenoid Benkevitch MIT Haystack Observatory doberoi, On behalf.
Time domain science and LSST follow ‐ up in South Africa (+ SKA) Stephen Potter South African Astronomical Observatory.
Observing Strategies at cm wavelengths Making good decisions Jessica Chapman Synthesis Workshop May 2003.
ASKAP: Setting the scene Max Voronkov ASKAP Computing 23 rd August 2010.
Australian SKA Pathfinder (ASKAP) David R DeBoer ATNF Assistant Director ASKAP Theme Leader 06 November 2007.
Summary of the Paris SKA Meeting 4-8 September 2006 R. T. Schilizzi.
The Allen Telescope Array Douglas Bock Radio Astronomy Laboratory University of California, Berkeley Socorro, August 23, 2001.
Review of developments in Australasia and mainland Asia Steven Tingay Swinburne University of Technology Next Generation correlator meeting, JIVE 27 -
A real-time software backend for the GMRT : towards hybrid backends CASPER meeting Capetown 30th September 2009 Collaborators : Jayanta Roy (NCRA) Yashwant.
The SKA: Next Week, the Next 3 Years & Beyond Jim Cordes, Cornell University 24 August 01  Concepts  Science Goals & Payoffs  Configurations, Modes.
SKA Central Signal Processor Architecture SKA CSP LMC Peer Review 11.April, 2016, Madrid Sonja Vrcic SKA CSP LMC Sub-element Lead.
Engineering Commissioning May 2016 SKA1 LOW – Assembly, Integration & Verification Adam MacLeod AIV Consortium Manager & ASKAP System Engineer.
Obtaining e-MERLIN Data For Use With NRAO Legacy Projects Tom Muxlow May 17 th 2006.
SAGE meeting Socorro, May 22-23, 2007 WIDAR Correlator Overview Michael P. Rupen Project Scientist for WIDAR & Software.
Andrew Faulkner April 2016 STFC Industry Day: Low Frequency Aperture Array Andrew Faulkner Project Engineer.
Andreas Horneffer for the LOFAR-CR Team
The CSIRO ASKAP Science Data Archive Progress and Plans
Medichats 14 October 2008 ADC bit number and input power needed, in new radio-astronomical applications View of the Medicina Radiotelescopes - Italy Eng.
Modern Interferometric Arrays
JIVE UniBoard Correlator (JUC) Firmware
Pulsar Timing with ASKAP Simon Johnston ATNF, CSIRO
Capability reporting Francesco Schillirò INAF- OACT
Aperture Array Station Processing
Radio Astronomy Spectrum Management in practice – Australia (ATNF)
Technical Foundations & Enabling Technologies – DS4
Correlator Growth Path
EVLA Advisory Panel Mtg. System Overview
DBBC Stutus Report November 2007
Presentation transcript:

Road to MeerKAT KAT-7 DBE Alan Langman

meerKAT

Overview Objectives of meerKAT Location Location Location MeerKAT Engineering Specification Prototypes to MeerKAT KAT-7 Mention Control Interface Other research Questions?

Build a world class radio telescope (up to 80 dishes) Choose a frequency range that is likely to have high science impact. Commission a 7 dish system from end of 2009, engineering risk mitigation and do some early science. Train a new generation of scientists and engineers who are capable to participate in large international projects, such as the SKA. Provide an excellent facility for local and international scientists. Implement mission-driven innovation to mobilise industry, academia and research fraternity. SKA pathfinder KAT/MeerKAT Objectives

SKA Bid - Remote site

The SKA & KAT site

South African Radio Frequency Measurement Campaign

Radio Frequency Environment HartRAO

MeerKAT Specifications ParameterMinimum scenarioGoal scenario Frequency range GHz GHz Expandable to include bands >8 GHz Ae/Tsys200 m 2 /K300 m 2 /K Feed & FoV Single-pixel wideband feed giving natural primary beam FoV Dish diameter12 m Number of dishes80100 Tsys30 K25 K Array configuration 70% core array with 500m max. baseline. 30% extended array with 10km max. baseline. Instantaneous bandwidth512 MHz1024 MHz Number of channels16 k64 k Polarisation purity-25dB Dynamic Range50 dB Phased array beams5> 5

MeerKAT DBE Functions Imaging (continuum + spectral line) Beamforming(continuum + spectral line) Pulsar Timing Transient Detection Baseband recording VLBI (and more … scope is still under revision)

Operations Centre (Cape Town) Station Controller (Karoo) Internet access Front end station processor Digital Receiver Back end station processor User (Scientist) Optical RF links: 80 x 2 optical links (80 dishes, 2 polarisations) Station data: High speed, large data volume, long distance data transfer Karoo Station to off- site data processing facility. Station data: Distribution internationally, typically over TCP/IP. Key interfaces Dishes and Feeds: 80 x 12 m dishes, each equipped with a single pixel prime focus feed What is the KAT/MeerKAT?

The prototyping phases KAT-7 construction & commissioning Experimental development model (XDM) Phased Experimental Demonstrator (PED) 4x3x2 FPA Completed Current – at HartRAO Current – at SAAO On the proposed SKA site in Karoo – 2008 onwards MeerKAT roll-out & commissioning Same site in the Karoo – 2009 onwards

11 April 2007

Drift scan across Cygnus A First extra-galactic object recorded by XDM – 17/07/2007

KAT-7 7

KAT-7 Specifications ParameterSpec Dish diameter12 m Number of dishes7 Tsys30 K Frequency range0.5-3 GHz Array configuration< 100 m Feed configuration Single pixel feed, prime focus Instantaneous bandwidth 256 MHz Number of channels16 k

MeerKAT DBE Functions Imaging (continuum + spectral line) Beamforming(continuum + spectral line) Pulsar Timing Baseband recording VLBI

KAT-7 Functional View

KAT-7 Physical Architecure

DBE Architecture for KAT-7

Mechanical

Roach

katADC Requirements The katADC shall include an E2PROM to store configuration information. The katADC shall operate from 50MHz to 1GHz (goal 1.5GHz). The katADC shall sample data with more than 6.5 ENOB over the full operating frequency range. The katADC shall have a 50 ohm termination on the input, switchable via a suitable RF switch. The katADC shall have 30dB RF gain control The katADC shall have an onboard PLL clock generator. The katADC shall have RFI shielding.

katADC

Gateware/Firmware 100% CASPER tools Developed Board Support Package for ROACH Integrated into toolchain U-boot port on board Ready for ROACH

Control / Monitoring Control interface are lines of text –Similar to tinysh, but with two differences: Syntax somewhat more formal, more amenable to machine parsing Not only set and get commands – commands defined for application domain (eg: start a data capture) In concept similar to a shell, but also SMTP, IMAP, POP, FTP

Implementation Runs out of FPGA blockrams on PPC Control protocol runs over serial port Multiple simultaneous data products over network interfaces (100Mbit, 10Gbit): –Histograms (2 * 256 bins) –Radiometers (2 * integrated power value) –Spectrometer (1024 channels, IQUV integrated) –Raw (2 * 1024 complex values)

Datastream control Create and destroy streams Set up parameters for data products Start and stop data streams Data transfer –High speed data products emitted autonomously by gateware over 10Gbit –Lower bandwidth data products transferred by processor via 100Mbit interface

Example Command Broadcast histogram data for 15 seconds: ?capture-create stream1 ?capture-source stream1 hist ?capture-destination stream1 xdp1: :7002 ?channel-dump-rate stream1 4 ?capture-start stream ?capture-stop stream ?capture-destroy stream1

Other control and monitoring Set time Configure network interfaces Dump and restore settings to survive reprogramming Report log events...

hiBOB (M. Aitken)

hubbleADC (J. Salkinder)