VRMCA Technical Committee The Place at Innsbrook August 11, 2008.

Slides:



Advertisements
Similar presentations
1 Balloting/Handling Negative Votes September 22 nd and 24 th, 2009 ASTM Virtual Training Session Christine DeJong Joe Koury.
Advertisements

DIVISION 5 SUBCOMMITTEE OCT 2014 Update. The Washington Chapter is one of 67 local chapters in the US and Canada which make up the American Public Works.
2015 State Aid Conference Ramsey County Office Arden Hills, Mn February 19, 2015.
Asphalt Specification Changes July 2005 Contractor Asphalt Training Rich Hewitt, PE District Bituminous Engineer District Five Materials & Research.
Tolerances and Price Impacts Presented by:- Er. Bhagawan Shrestha.
PRESENTATION TO 34 TH ANNUAL AIRPORTS CONFERENCE 3/02/11 By: Casimir J. Bognacki, PE, FACI Chief of Materials Engineering.
Section 305 Technical Subcommittee Boston, MA: June 14, 2014.
Chapter 3. Obtaining Silica-Fume Concrete  Specifying Silica Fume and SFC  Proportioning SFC  Producing SFC.
2015 Winter School Structures Heidi A. Mertz, P.E. District 8-0 Structure Control Engineer.
Doc.: IEEE /0233r0 Agenda March 2015 Stephen McCann, BlackBerrySlide 1 TGaq Agenda Date: Authors:
Doc.: IEEE /0737r0 Agenda July 2015 Stephen McCann, BlackBerrySlide 1 Publicity SC Agenda Date: Authors:
Doc.: IEEE /0520r0 Submission Apr Jonathan Segev (Intel)Slide 1 NGP SG Apr. 15 th Telecon Agenda Date: Authors:
Concrete Quality Assurance: How Concrete is Specified and Supplied To Meet Construction Specifications Prepared By: Prof. Marcia C. Belcher Construction.
Doc.: IEEE /0723r4 Agenda July 2015 Stephen McCann, BlackBerrySlide 1 TGaq Agenda Date: Authors:
Asphalt Quality Assurance Program
Quality Control Testing
2002 FDOT/FTBA Construction Conference
03-0F2204 Sly Park Road UC (Replace) Prebid Outreach Meeting: CIP Structural Concrete Materials Specification Overview John Yang, P.E. Office of Structural.
NOTE: When UPGRADE MIX DESIGN or MATERIAL CHANGE TO JMF is selected, the RELATED JMF cell appears in yellow. Enter the approved JMF # for.
READYMIX INDUSTRY There are two main components in asphalt concrete: 1) the asphalt cement, or glue, and 2) the aggregates.
Update on End Result Specifications Celik Ozyildirim, Ph.D., P.E.
6 th Edition CCCWP Management Committee February 15, 2012.
BY: CASIMIR J. BOGNACKI, PE CHIEF OF MATERIALS ENGINEERING
CCSESA Chief Business Officials Conference February 18, 2015.
1 Nodal Stabilization Market Call December 28, 2010.
Pervious Concrete Design Instructor: Cris Koutsougeras Advisor: Mohamed Zeidan By: Alex Rodney October 8, 2014.
Risk Management, Assessment and Planning Committee III-4.
The Cathedral of Our Lady of the Angels. Los Angeles, California Rafael Moneo.
Omniran ecsg 1 OmniRAN EC SG Agenda March 2013, Orlando, FL Max Riegel (OmniRAN SG Chair)
Methods of Specifying ACT Objective Recognize the language, proper preparation, and appropriate situation for the four methods of specifying. 2.
New York State Department of Transportation Accelerated Bridge Program Phase 1B Design-Build Projects Request for Proposals Informational Meeting April.
Doc.: IEEE s Submission March 2015 Shoichi Kitazawa,ATRSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE /1005r0 Agenda September 2015 Jim Lansford, Chair (Qualcomm)Slide 1 WNG SC Agenda Date: Authors:
Concrete Technology Ch8: Proportioning Concrete Mixes Lecture 14 Eng: Eyad Haddad.
Canada Cooperatives Act Incorporation of a federal cooperative December 2013.
Doc.: IEEE sru Submission April 2013 Shoichi Kitazawa (ATR)Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
JUST IN TIME MIXTURE PROPORTIONING Ken W. Day Consultant, ConAd Australia.
Doc.: IEEE s Submission May 2015 Shoichi Kitazawa, ATRSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
MISUG Meeting Materials Jackie Ashbaugh/Jamie Lavas ERCOT 2/22/2011.
Doc.: IEEE /0225r0 Report and Minutes March 2005 Pat R. Calhoun, AirespaceSlide 1 Report of TGv – March 2005 DATE: January 205 Author(s) NameCompanyAddressPhone .
Doc.: IEEE /0492r0 Agenda May 2015 Stephen McCann, BlackBerrySlide 1 Publicity SC Agenda Date: Authors:
Doc.: IEEE /0028r1 Agenda January 2014 Jim Lansford, CSR TechnologySlide 1 IEEE Regulatory SC DSRC Coexistence Tiger Team DRAFT Teleconference.
Concrete Field Sampling
Date: 25 Sep 12 Presented by: Steve Watts Team Leader Aviation and Missile Research, Development and Engineering Center Presented to: MRL Government /
Doc.: IEEE /0114r1 Agenda January 2013 Clint Chaplin, Chair (Samsung)Slide 1 WNG SC Agenda Date: Authors:
High-Performance Concrete Design and Control of Concrete Mixtures – Chapter 19.
Doc.: IEEE s Submission July, 2015 Shoichi Kitazawa, ATRSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE /1537r0 Submission November 2011 Mark Hamilton, Polycom, Inc.Slide 1 ARC-agenda-minutes-november-2011 Date: Authors:
Doc.: IEEE /0491r0 Agenda May 2015 Stephen McCann, BlackBerrySlide 1 TGaq Agenda Date: Authors:
Doc.: IEEE /1515r0 AgendaStephen McCann, BlackBerrySlide 1 TGaq Agenda Date: Authors: January 2016.
Doc.: IEEE /0217r7 AgendaStephen McCann, BlackBerrySlide 1 TGaq Agenda Date: Authors: May 2016.
Doc.: IEEE /1230r0 AgendaStephen McCann, BlackBerrySlide 1 TGaq Agenda Date: Authors: November 2015.
Presented to ACI Committee 240 Washington D. C. October 27, 2014 R.E. Neal.
Athletic Training Licensure New Rules & Clinical Practice Update The 5th Annual Capital City Sports Medicine Symposium.
CVL 2407 Faculty of Applied Engineering and Urban Planning Civil Engineering Department 2 nd Semester 2013/2014 Dr. Eng. Mustafa Maher Al-tayeb.
BY: CASIMIR J. BOGNACKI, PE, FACI CHIEF OF MATERIALS ENGINEERING
IEEE TGaz April Teleconference Agenda
BCS April 24th, Telco Agenda
2016 Exploration & Production Standards Conference Subcommittee 10
2018 Revisions to NYCDOB Code
2016 Exploration & Production Winter Standards Meeting Subcommittee 10
Concrete for Box Culverts – Wet Cast Concrete
Next Generation V2X Study Group Jul 2018 Agenda
The OPTN Bylaws Rewrite Project What It Means For You
March 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Opening Information for March 2015]
IEEE TGw July Agenda Date: Authors: July 2008
July 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [4y SECN Agenda July 2019 Plenary] Date Submitted:
IEEE MEDIA INDEPENDENT HANDOVER DCN: sec
September 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [4y SECN Agenda September 2019 Interim]
Fiber Reinforced Polymer Systems
Presentation transcript:

VRMCA Technical Committee The Place at Innsbrook August 11, 2008

Agenda ► Call to Order ► Anti-Trust Statement ► Approval of Agenda ► Approval of April 9, 2008 Minutes ► Prime Outlets Pervious PresentationRomeo ► VRMCA Technical Committee Website Nablo & Neal ► Status of 4X8 CylindersNeal & Starnes ► ACI 318 – 08Sheetz ► Air Entrained Garage FloorsNeal ► VDOT Coop UpdateSheetz  VDOT Price Adjustments  Staunton District Lab ► New BusinessAll ► Adjournment

Agenda ► Call to Order ► Anti-Trust Statement ► Approval of Agenda ► Approval of April 9, 2008 Minutes ► Prime Outlets Pervious PresentationRomeo ► VRMCA Technical Committee Website Nablo & Neal ► Status of 4X8 CylindersNeal & Starnes ► ACI 318 – 08Sheetz ► Air Entrained Garage FloorsNeal ► VDOT Coop UpdateSheetz  VDOT Price Adjustments  Staunton District Lab ► New BusinessAll ► Adjournment

Agenda ► Call to Order ► Anti-Trust Statement ► Approval of Agenda ► Approval of April 9, 2008 Minutes ► Prime Outlets Pervious PresentationRomeo ► VRMCA Technical Committee Website Nablo & Neal ► Status of 4X8 CylindersNeal & Starnes ► ACI 318 – 08Sheetz ► Air Entrained Garage FloorsNeal ► VDOT Coop UpdateSheetz  VDOT Price Adjustments  Staunton District Lab ► New Business ► Adjournment

VRMCA Technical Website ► Technical Bulletins  Reorganized and renamed. ► Misc Reports Deleted  Two on Fibers  Iowa State Report ► VRMCA Bylaws Change

Agenda ► Call to Order ► Anti-Trust Statement ► Approval of Agenda ► Approval of April 9, 2008 Minutes ► Prime Outlets Pervious PresentationRomeo ► VRMCA Technical Committee Website Nablo & Neal ► Status of 4X8 CylindersNeal & Starnes ► ACI 318 – 08Sheetz ► Air Entrained Garage FloorsNeal ► VDOT Coop UpdateSheetz  VDOT Price Adjustments  Staunton District Lab ► New Business ► Adjournment

Agenda ► Call to Order ► Anti-Trust Statement ► Approval of Agenda ► Approval of April 9, 2008 Minutes ► Prime Outlets Pervious PresentationRomeo ► VRMCA Technical Committee Website Nablo & Neal ► Status of 4X8 CylindersNeal & Starnes ► ACI 318 – 08Sheetz ► Air Entrained Garage FloorsNeal ► VDOT Coop UpdateSheetz  VDOT Price Adjustments  Staunton District Lab ► New Business ► Adjournment

ACI ACI ACI Chapter 4 - Durability Requirements Rewritten Chapter 5, Section (c) "Trial mixtures shall be designed to produce a slump within +/ inches of maximum permitted, and for air-entrained concrete, within +/- 0.5 percent of the maximum allowable air content." Chapter 5, Section (c) "Trial mixtures shall have slumps within the range specified for the proposed Work; for air-entrained concrete, air content shall be within the tolerance specified for the proposed Work."

Agenda ► Call to Order ► Anti-Trust Statement ► Approval of Agenda ► Approval of April 9, 2008 Minutes ► Prime Outlets Pervious PresentationRomeo ► VRMCA Technical Committee Website Nablo & Neal ► Status of 4X8 CylindersNeal & Starnes ► ACI 318 – 08Sheetz ► Air Entrained Garage FloorsNeal ► VDOT Coop UpdateSheetz  VDOT Price Adjustments  Staunton District Lab ► New Business ► Adjournment

Agenda ► Call to Order ► Anti-Trust Statement ► Approval of Agenda ► Approval of April 9, 2008 Minutes ► Prime Outlets Pervious PresentationRomeo ► VRMCA Technical Committee Website Nablo & Neal ► Status of 4X8 CylindersNeal & Starnes ► ACI 318 – 08Sheetz ► Air Entrained Garage FloorsNeal ► VDOT Coop UpdateSheetz  VDOT Price Adjustments  Staunton District Lab ► New BusinessAll ► Adjournment

VDOT Coop Update ► Investigating Failing Coulombs  Elko has had to perform coulomb testing on cores.  Lundy has developed procedure for testing on cores.  Bridge Group still does not want to core decks.

VDOT Coop Update ► End Result Specification  Chelik to compile pilot project data  Prequalifying a Concrete Mix  Chelik to develop proposal for procedure Three point curves with 1200psi overdesignThree point curves with 1200psi overdesign Truck batch selected mix proportions – what is the strength requirement?Truck batch selected mix proportions – what is the strength requirement?  VRMCA Tech Sub-Committee to review procedure when officially presented.

VDOT Coop Update ► Flowable Backfill Special Provision Update  VDOT approved – waiting on FHWA.

VDOT Price Adjustments ► Product of our Sub-Committee  Generated a Response Document  ACI 318 Strength Analysis  Documentation of Valid Tests  Information on break reports  ASTM C 31 Compliance (Address Staunton District Issue)  Rewrite MOI with ASTM C 31 verbiage  With-in Test Variation  Unit Price Vs. Invoice Price  When concrete is accepted and/or not allowed to core.  ACI 318 Cores

VDOT Coop Update Next Meeting – January 29, 2009 Charlottesville

Agenda ► Call to Order ► Anti-Trust Statement ► Approval of Agenda ► Approval of April 9, 2008 Minutes ► Prime Outlets Pervious PresentationRomeo ► VRMCA Technical Committee Website Nablo & Neal ► Status of 4X8 CylindersNeal & Starnes ► ACI 318 – 08Sheetz ► Air Entrained Garage FloorsNeal ► VDOT Coop UpdateSheetz  VDOT Price Adjustments  Staunton District Lab ► New BusinessAll ► Adjournment

Next Meeting ► Date of Next Meeting ► Location of Next Meeting

Agenda ► Call to Order ► Anti-Trust Statement ► Approval of Agenda ► Approval of April 9, 2008 Minutes ► Prime Outlets Pervious PresentationRomeo ► VRMCA Technical Committee Website Nablo & Neal ► Status of 4X8 CylindersNeal & Starnes ► ACI 318 – 08Sheetz ► Air Entrained Garage FloorsNeal ► VDOT Coop UpdateSheetz  VDOT Price Adjustments  Staunton District Lab ► New BusinessAll ► Adjournment