LDEQ RECAP Miscellaneous Topics
Exposure Assessment n Site-specific under MO-3 only n Construction worker scenario n Greatly reduced ET, EF, and/or ED n Site-specific data should be documented
Exposure Assessment n Absence of site-specific data Default values n Permanent vs non-permanent structures n Enclosed structures
Exposure Assessment Additional exposure considerations when the site- specific GW2 or GW3 DAF is large: n Construction worker exposure n Volatile emissions to ambient air (GW air ) n Cross-media transfer - migration to deeper zones
Toxicity Assessment n Unavailability of toxicity values Develop a toxicity value(s) Identify a surrogate toxicity value based on structure/activity and/or targets Route-to-route extrapolation Qualitative evaluation
Toxicity Assessment nNo speciation data ex) Cr +3 vs Cr +6 nNew slope factor ranges in IRIS nDermal toxicity values If GI absorption efficiency < 50% adjust oral tox value If GI absorption efficiency > 50% do not adjust RAGS HHEM Supplemental Guidance Dermal Risk Assessment Interim Guidance (EPA 1998)
Background Data n Where should samples be collected? n How many samples??? n How should the data be used? Calculate arithmetic average Obtain Department approval Compare to arithmetic average for AOI n What if there are high anthropogenic bg levels???
TPH Issues nTPH-G, TPH-D, and TPH-O Physical/chemical properties presented Soil sat and Water sol not applicable Target organs/critical effects identified
Wet Weight vs Dry Weight nData is routinely reported on wet-weight basis nWet weight used for exposure concentrations nDry weight used for EF&T calculations nWet weight Dry weight
Soil to Groundwater Pathway SPLP Data nWhere should SPLP samples be collected? nHow is the SPLP data used to evaluate the soil to gw pathway? Soil GW1 : Compare SPLP to GW 1 x DF Summers Soil GW2 : Compare SPLP to GW 2 x DF Summers x DF2 Soil GW3 : Compare SPLP to GW 3 x DF Summers x DF3
Soil to Groundwater Pathway SPLP Data If SPLP <, then screen out soil to gw pathway If SPLP >, then delineate area of concern SPLP vs TCLP SPLP vs LRS
Estimation of S d S d = Thickness of impacted groundwater within permeable zone Un-impacted groundwater 10’ 15’ Impacted groundwater 5’ S d = 5’
Estimation of S d S d = Thickness of permeable zone if thickness is not known or if the zone is not impacted Un-impacted groundwater 10’ 15’ S d = 15’
Alternate RS nMO-3 only nTechnically impracticable and/or economically infeasible ONLY nCorrective Action Study nRequires Department Approval
Workplans nRequired for MO-3 nRecommended for some MO-2 nThe more detailed, the better Id of AOI/COCs CSM Id of approaches/methods Id of assumptions/site-specific and default inputs
Fractional Organic Carbon Fractional Organic Carbon (foc) -Estimated by dividing the percent organic matter (POM) by a conversion factor of 174 -POM determined using ASTM D2974 -Samples should be collected from a non- impacted area at a depth consistent with the depth of impact - Default foc = 0.006