Multi-Jurisdictional Use Facilities O&M Flow Share Review February 28, 2013 Update with 4 Alternative Approaches.

Slides:



Advertisements
Similar presentations
A Methodology To Design and/or Assess Baffles for Floatables Control Thomas L. Newman II, P.E. HydroQual, Inc.
Advertisements

Recommending a Strategy Ideas for Today and Tomorrow.
Nutrient Issues at the Blue Plains WWTP February 2004.
THE DISTRICT’S ANACOSTIA RIVER TRASH TMDL IMPLEMENTATION STRATEGY
Capital Budgeting Decisions
DC Water Town Hall Meeting Series 2013 General Manager George S. Hawkins.
1 The fully constructed combined sewer overflow (CSO) program will reduce CSOs by 96% and over 98% in the Anacostia River alone, relieve flooding in northeast.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
Adelanto Elementary School District Fiscal Review Presented by: Anthony Bridges, Deputy Executive Officer Diane Branham, Fiscal Intervention Specialist.
Sampling Mathsfest Why Sample? Jan8, 2003 Air Midwest Flight 5481 from Douglas International Airport in North Carolina stalled after take off, crashed.
ESTIMATING THE 100-YEAR FLOOD FORDECORAH USING THE RAINFALL EVENTS OF THE RIVER'S CATCHMENT By Kai TsurutaFaculty Advisor: Richard Bernatz Abstract:This.
Population Estimates 2012 Texas State Data Center Conference for Data Users May 22, 2012 Austin, TX.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Split Generation Resources (SGRs) (Also known as Jointly Owned.
United Nations Statistics Division
Update on the District of Columbia’s Watershed Implementation Plan (WIP) for the Chesapeake Bay Total Maximum Daily Load (TMDL) November 18, 2010.
The Nevada Department of Employment, Training and Rehabilitation is a proactive workforce & rehabilitation agency STATE OF NEVADA Department of Employment,
Peak-to-Peak, RMS Voltage, and Power. Alternating Current Defined In alternating current (ac), electrons flow back and forth through the conductor with.
System Development Life Cycle
1 Availability Modeling of Cooling Water Pumps to Assess if a Replacement Option is Economically Feasible. Dr. Salman Mishari.
Software Project Management1 EA – Cash Flow Forecasting What? – Estimation of the cash flow over time Why? – An excess of estimated benefits over the estimated.
Independent Review of FY 2008 Proposed Rates D.C. Water and Sewer Authority Public Hearing June 13, 2007.
Waste Water Facilities Plan Update November 2, 2009 Palmer Engineering Company / Hazen & Sawyer / CDP Public Hearing Presentation.
Software cost estimation Predicting the resources required for a software development process 1.
Section 7.5 –4 – ii of Indian Electricity Grid code (IEGC): “The summation of station-wise ex-power plant drawal schedules for all ISGS after deducting.
Updated Estimates of Impervious Area, Equivalent Residential Units, IA Rate, and Customer Bill Impacts AOBA October 27, 2008.
QC Follow-up for Single Family SEEM Calibration, HVAC UES Measures, and Weatherization Measures Adam Hadley Regional Technical Forum May 12, 2015.
Analysis of Weatherization Measures Options for Savings Methodology and Presentation of Costs from 6 th Plan Regional Technical Forum May 4 th, 2010.
APPA’s Financial Planning for Municipals Mark Beauchamp, CPA, CMA, MBA September 27, 2005 Business & Finance Workshop.
P 3 Actuaries you can understand 1 Review of Actuarial Methodology Issues November 8, 2006 P.
Chapter 6 Common Stock Valuation: Putting all the pieces together.
1 District of Columbia Water and Sewer Authority George S. Hawkins, General Manager August 29, 2012 Revised August 30, 2012 Operating Agency Workgroup.
Briefing on IMA Negotiation Issues Presented to: Blue Plains IMA Negotiating Team Operating Agency Work Group March 11, 2010 District of Columbia Water.
1. 2 Traditional Income Statement LO1: Prepare a contribution margin income statement.
Facilities Plan Update July 2, 2009 Palmer Engineering Company / Hazen & Sawyer / CDP.
1 Analysis of Cost and Savings Values for Revised Energy Star Dishwasher Specifications June 6, 2006 Revised August 8, 2006.
1 Briefing Materials Flow and Nitrogen Issues By: D.C. Water and Sewer Authority February 28, 2008 Blue Plains Regional Committee Presented to: District.
1 Discussion Points for IMA Participants – Flow Studies December 19, 2006 District of Columbia Water and Sewer Authority.
Fundamentals of Enrolment Projections Slide 1 Module E5 - Session 1 Mekong Institute & UNESCO Regional Office-Bangkok Prepared by the Education Policy.
Business Consulting Services Engagement Proposal & Letter of Agreement Project Management Timelines/GANNT Chart.
Commonwealth of Massachusetts Executive Office of Health and Human Services Chapter 257 of the Acts of 2008 Provider Information & Dialogue Session: Lead.
Class Size Reduction: Accountability Calculations FAMIS Summer Conference June 13, 2012.
Using GIS to Find Suitable Locations for Solar Power Plants Submitted By: Scott Peterson May 12, 2005 Texas A&M University Department of Civil Engineering.
©Ian Sommerville 2000Software Engineering, 7th edition. Chapter 26Slide 1 Software cost estimation l Predicting the resources required for a software development.
Interim Alternate Route Adjustment Process Joint Training INTERIM ALTERNATE ROUTE ADJUSTMENT PROCESS Joint Training October 31, 2008 INTERIM ALTERNATE.
1 Briefing for IMA Participants on Results of Flow Studies October 31, 2006 District of Columbia Water and Sewer Authority.
Winchester Municipal Utilities 2009 Rate Plan April 9, 2009.
John B. Cole Animal Improvement Programs Laboratory Agricultural Research Service, USDA, Beltsville, MD Best prediction.
Multi-Jurisdictional-Use Facilities Capital Cost Allocation Study Update Presented to Blue Plains Regional Committee December 20, 2010 District of Columbia.
Warren Township Study To Examine Enrollment Project (STEEP) Project Plan & Criteria High Level Timeline Sub-Committee Goals & Deliverables Revised October.
Preliminary Proposal Equity Factor for FY13. Context Wide variation in the distribution of resources across districts in Tanzania and in the effective.
Delon Hampton and Associates, Chartered EPMC 3B Joint-Use Facilities Capital Cost Allocation Study Presented to Environmental Quality & Operations Committee.
Presentation to Board June 17, 2008 Presented by: J. A. Sabo, Associate Director – Leading Services & Treasurer of the Board BUDGET York Catholic.
Point Sources Progress Reporting Management Board Conference Call February 9, 2012.
District of Columbia Water and Sewer Authority George S. Hawkins, General Manager July 14, 2015 Commission for Environmental Cooperation of North America.
1 Briefing for Blue Plains Regional Committee on Potomac Interceptor Capacity Analyses June 28, 2007 District of Columbia Water and Sewer Authority.
Multi-Jurisdictional-Use Facilities Flow Analysis Study Update Presented to Blue Plains Regional Committee March 24, 2011 District of Columbia Water and.
Blue Plains IMA Suburban Position February 22, 2007.
1 District of Columbia Water and Sewer Authority George S. Hawkins, General Manager June 28, 2012 Blue Plains Regional Committee Briefing for: Cost Allocation.
2012 GIS Upgrades Improved Accuracy of District Shoreline and Civic Addresses COMMITTEE OF THE WHOLE Monday, January 14 th 2013.
Critical Path Analysis (CPA)
Update on PI Modeling and Nitrogen Removal at Blue Plains
LTCP and TN Cost Allocation
Recommending a Strategy
Recommending a Strategy
Recommending a Strategy
Warren Township Study To Examine Enrollment Project (STEEP)
Facilities Plan Update
Recommending a Strategy
Recommending a Strategy
MECH 3550 : Simulation & Visualization
Presentation transcript:

Multi-Jurisdictional Use Facilities O&M Flow Share Review February 28, 2013 Update with 4 Alternative Approaches

Agreed Issues (TechSc meeting 01/24/2013) Current assumptions regarding District versus Suburban flow ratios are old and not well understood. Unmetered District flow data probably should be updated but additional metering cost should be borne by DC. Costs for Interceptor O & M are relatively low compared to plant and pump station O&M costs therefore a more streamlined approach to allocating MJUF O&M Costs for interceptors would be desirable.

Existing Methodology Current O&M flow calculation estimates DC flow as a % of Suburban flow. D 1 = % of Suburban flow (S) Methodology Alternative No.1 (Cost share Calculated Node to Node) Suburban Flow (S) D1 D2 D… D11 X1 X2 % = D 1 /(D 1 +S) D1 to D11 = DC Catchments = DT D t = P p - S Total District flow between pump station and boundary input Oxon Runs D t = B - (X1 + X2) - S Total District flow between pump station and blue Plain Recommended Methodology The proposed methodology relates each flow component to the total DC contribution in that segment D T. D 1 = % of District Flow (D t ) Watts Branch Pump Stations (P) Blue Plains (B) Poplar Point PS (Pp) CSO % = D t /(D t +S) Anacostia Potomac

Methodology Alternative No.2 (Cost share Calculated per Interceptor) Suburban Flow (S) X1 X2 % = Dt/(Dt+S) D t = P p - S Total District flow between pump station and boundary input Oxon Run D t = B - (X1 + X2) - S Total District flow between pump station and Blue Plains Pump Stations (P) Blue Plains (B) CSO % = D t /(D t +S) Anacostia Potomac District flow discharged directly into Pump Station DC Flow normalized over the length of each interceptor

Methodology Alternative No.3 (Cost share calculated by averaging previous 10-year data and prorating using 2009 BPRFF data Suburban Flow (S) X1 X2 S1 to Sn Oxon Run Pump Stations (P) Blue Plains (B) Anacostia Potomac D i % x D 2009 = D i based on 2009 data S i % x S 2009 = S i based on 2009 data S cost share = S i2009 / (D i S i2009 ) S i % = S n / S t based on past data D i % = D n / D t based on past data ( D t = P-S i ) D 2009 Total district flow in 2009 S i Suburban flow at each route D i District flow at each route S 2009 Total suburban flow in 2009 D cost share = D i2009 / (D i S i2009 ) Same principal as above.

Methodology Alternative No.4 Do Nothing (Except Improve data processing and ensure that all O &M Costs are captured)

Proposed Cost Cost ItemCost Alternative No.1Alternative No.2Alternative No.3 Alternative No.4 Study and Report $217,500.00$187, Flow Metering $242,000.00$128, $0.00 Developing Billing and Reporting Software $41, $0.00 $41,000 Total $500,500.00$316,460.00$187,500.00$41,000.00

Advantage and Disadvantage Alternative No.AdvantagesDisadvantages 1 More accurate and current representation of flows More costly to do study and implement. More administrative work and costs for billing. Longer learning curve. 2 Simple to implement Less costly to do study and implement. Shorter time to learn. Less flow metering than No1 and 4 Less administrative effort for billing. Flows not accounted for as accurately ( Cost share not as accurate ( normalized per route) 3 Simpler to implement than all except No2 Less costly to do study and implement. Shorter time to learn. No Flow metering needed. Almost no administrative effort. Flows not accounted for accurately Cost share not as accurate (normalized per 2009 base flow) 4 No time required for training No study required, only revised billing SOP and software. Shorter time to learn. More administrative work and costs for billing (metering etc) Does not account for new MJUFs