Everglades Protection Area Tributary Basins February 26, 2004 First Annual Public Meeting on Implementation Progress.

Slides:



Advertisements
Similar presentations
creating a sustainable world The Chesapeake Bay TMDL A Policy Model for Nutrient Pollution Reductions James Noonan October.
Advertisements

Status Update on Future Water Quality Strategies for the Refuge Kenneth G. Ammon, P.E., Deputy Executive Director, Everglades Restoration and Capital Projects.
Flood the Sugar Cane Farms Now to Save the Estuaries: Is This Feasible ? Water Resources Advisory Commission January 5, 2006 Meeting.
Legislative Changes Affecting Water Quality at a Local Level October 2011 Robert Kollinger, P.E. Water Resources Manager Polk County Parks and Natural.
Clean Water Act Integrated Planning Framework Sewer Smart Summit October 23, 2012.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Expedited Projects + Innovative Teamwork = Measurable Improvements to the Health of Lake Okeechobee and the St. Lucie and Caloosahatchee Estuaries.
Mid-Barataria Diversion - Status Update committed to our coast Andrew Beall Project Manager Governor’s Advisory Commission Meeting December 5, 2012.
Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
Slide 1 November 2005 Oakdale Irrigation District Water Resources Plan A Community Plan. A Successful Future. Phase 1 Recommendations Oakdale Irrigation.
Chapter 8: Implementation of the Long-Term Plan for Achieving Water Quality Goals in the Everglades Protection Area 2006 South Florida Environmental Report.
Everglades Protection Area Tributary Basins January 15, 2004 Tracey Piccone, P.E.
Framework Agreement Principals Meeting #5 March 23, 2015 Everglades Water Quality Restoration.
Impaired and TMDL Waterbody Listings Impacts on DoD Facilities Bill Melville, Regional TMDL Coordinator
Update on Chesapeake Bay Issues Presentation to the Chesapeake Bay and Water Resources Policy Committee July 17, 2009 Ted Graham & Steve Bieber COG Department.
THE COST AND LEVEL OF SERVIC E PRESENTED BY: COURTNEY REICH, AICP ECOLOGICAL PLANNING GROUP Stormwater Management Programs for Local Governments.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
1 U.S. ARMY CORPS OF ENGINEERS AND ST. JOHNS RIVER WATER MANAGEMENT DISTRICT Indian River Lagoon North Restoration Feasibility Study Public Meeting September.
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
“Keeping your money in your pocket, where it belongs.” Chart of Accounts Update Florida Court Clerks & Comptrollers - New Clerk Academy March 13, 2014.
Water Supply Planning Initiative State Water Commission November 22, 2004.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Regional Grant Funding Coordination for Implementation of Watershed Management Plans Project Clean Water Summit July 15, 2004 David W. Gibson SDRWQCB
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Eastern Snake River Plain Comprehensive Aquifer Management Plan (CAMP) Progress Report ESHMC January 13, 2009.
Water Quality Program Financial Assistance Progress and Plans for Meeting RCW Requirements (Joint Legislative Audit and Review Committee)
WRAC Issues Workshop EAA/STA-2 Expansion Cell 4 April 11, 2005 Acceler8 Overview.
Presentation to the Chesapeake Bay and Water Resources Policy Committee July 30, 2010.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Briefing to the Central Valley Flood Protection Board June 28, 2013 Status of State-Led Basin-Wide Feasibility Studies.
Restoring VA Waters the TMDL Way Jeff Corbin Senior Advisor to the Regional Administrator U.S. EPA Region 3.
University of Central Florida Assessment Toolkit for Academic, Student and Enrollment Services Dr. Mark Allen Poisel Dr. Ron Atwell Dr. Paula Krist Dr.
Stationary and Area Source Committee Update OTC Committee Meeting September 13, 2012 Washington, D.C. Hall of the States 1.
FISCAL YEAR Discussion on Mid-Year Budget Adjustment: SAN JOAQUIN COUNTY DELTA ACTIVITIES 1 Tom Gau, Interim Director San Joaquin County Department.
Tracey Piccone, P.E. August 10, 2004 Tracey Piccone, P.E. August 10, 2004 STA-1W Cell 5 Limerock Berm 2003 Outstanding Project of the Year Palm Beach County.
Orange County Board of County Commissioners Update on USEPA Rulemaking for Numeric Nutrient Criteria Utilities Department January 26, 2010 Utilities Department.
Basin-Specific Feasibility Studies STA and Reservoir Alternatives Basin-Specific Feasibility Studies STA and Reservoir Alternatives November 21, 2002 Presentation.
EPA Chesapeake Bay Trading and Offsets Workplan June 1, 2012.
10/03/021 Stormwater Video-conference Department of Environmental Protection Stormwater Videoconference October 3, 2002.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives August.
Basin Specific Feasibility Studies Everglades Stormwater Program Basins Preliminary Findings Contract C-E024 HSA Engineers & Scientists DB Environmental.
STA Performance Update February 28, 2006 Long-Term Plan Annual Update Tracey Piccone, P.E. February 28, 2006 Long-Term Plan Annual Update Tracey Piccone,
Lee County Water Resource Initiative: Community Sustainability Committee June 16, 2010 Kurt Harclerode Operations Manager Lee County Natural Resources.
WRAC Acme Basin B Discharge Project February 2, 2006.
September 23, 2010 Overview of DWR’s Flood Management Activities Related to the Delta A Briefing to the Delta Stewardship Council 1.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Everglades Protection Area Tributary Basins February 28, 2006 Third Annual Public Meeting on Implementation Progress.
Revisions to the Long-Term Plan for Achieving Everglades Water Quality Goals November 18, 2004 Gary Goforth Chief Consulting Engineer South Florida Water.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Proposed Revisions to the Long-Term Plan Long-Term Plan Communications Meeting August 25, 2004 Gary Goforth Chief Consulting Engineer South Florida Water.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
The West is different August 14, 2013 OAQPS. Aerosols causing Worst Visibility Days – East vs. West 2.
Discussion of Priority Activities for Next Eighteen Months Action Plans.
Everglades Protection Area Tributary Basins February 23, 2005 Second Annual Public Meeting on Implementation Progress.
Santa Rosa Plain Groundwater Management Planning Update Fall 2013.
Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives August.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives August.
Beth Kacvinsky - Lead Project Manager Office of Everglades Policy and Coordination March 1, 2016 IRL-S / C-44 Overview.
2035 General Plan Update Joint Study Session on Draft Conservation Element Planning Commission and Parks & Recreation Commission December 1, 2015.
Metropolitan North Georgia Water Planning District DRAFT Water Resource Management Plan Review
Department of Environmental Quality Division of Mitigation Services
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA
Town of Melbourne Beach
City of Forest Lake MS4 Program
Purpose Independent piece of legislation, closely integrated in a larger regulatory framework (complement to WFD): prevent deterioration protect, enhance.
Space Coast TPO State Road (S.R.) 528 Update
Presentation transcript:

Everglades Protection Area Tributary Basins February 26, 2004 First Annual Public Meeting on Implementation Progress

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Introduction and Opening Remarks Gary Goforth

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Welcome! Welcome to the first annual public meeting on the Long-term Plan for Achieving Water Quality Goals of the Everglades (Plan) Objective today is to share the progress of implementing the Plan and receive comments from the public

Basins Addressed Seven Everglades Construction Project (ECP) Basins Six Everglades Stormwater Program (ESP) Basins

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Background 1994 Everglades Forever Act ØRequired the submittal of a permit modification by December 31, 2003 containing a PLAN for achieving compliance with phosphorus criterion in the Everglades Protection Area Strategy has been in every annual Everglades Consolidated Report Utilized results of Basin-Specific Feasibility Studies

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Basic Precepts Although existing phosphorus control programs are doing better than expected, additional measures will be needed to achieve compliance with water quality standards Substantive scientific uncertainties remain Maximum water quality improvement through an adaptive implementation process

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Overall Strategy 1.All scientifically defensible steps are taken at the earliest achievable dates 2.Focused efforts to improve the scientific and technical basis for additional steps 3.Incremental implementation of additional steps as soon as their need is confirmed

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals ECP Basins Seven ECP Basins ØS-5A, S-6, S-7, S-8, C- 139 & C-139 Annex, and C-51 West ØGrouped into six STA- specific areas (STA-1E, STA-1W, STA-2, STA- 3/4, STA-5, STA-6)

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals ESP Basins Six ESP Basins ØAcme Improvement District, Basin B ØNorth Springs Improvement District ØNorth New River Canal ØC-11 West ØL-28 ØFeeder Canal

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Florida Legislature found that the Plan provides the best available phosphorus reduction technology Florida Environmental Regulation Commission adopted Everglades Phosphorus Rule that declared the Plan shall constitute the best available phosphorus reduction technology Plan was revised to incorporate legislative guidance and public comments Final document dated October 27, 2003 was submitted to FDEP as part of Everglades Forever Act required long-term permit application due by December 31, 2003 Revisions to Plan

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Plan Components Three principal plan components ØPre-2006 Projects ØProcess Development and Engineering ØPost-2006 Strategy

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Pre-2006 Projects In the ECP Basins (STAs) ØAdditional compartmentalization ØVegetation management and conversion to more effective communities ØOperational refinements In the ESP Basins ØPrimary reliance on source controls and integration with CERP Projects, coupled with operational adjustments

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Process Development and Engineering (PDE) PDE contains seven primary elements ØIdentify means and methods to replicate the optimal performance of SAV ØDevelop engineering criteria and forecasting tools for additional measures which can be applied within the footprint of existing STAs. ØRefine estimated impacts of CERP projects on basin discharge volumes and pollutant loads

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Process Development and Engineering (PDE) ØIdentify opportunities to maintain and improve performance of urban and agricultural source controls ØEnhanced control and monitoring of water quality improvement measures now in place ØImprove the reliability of estimated STA inflow volumes and pollutant loads ØDetermine the relationship between quality of water discharged into, and water quality within, the EPA

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Post-2006 Strategy Identification and adaptive implementation of additional water quality improvement measures following completion of pre-2006 projects ØImplement as soon as their functionality and need is determined ØBased on ongoing analysis of actual performance and the PDE effort ØRecommended funding of $36 million

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Post-2006 Strategy Possible measures for adaptive implementation within proposed budget includes: ØConversion of additional lands to SAV, PSTA or other vegetative communities ØAdditional structural and operational modifications within existing STAs ØInterbasin transfer of water for more integrated and improved operation ØIntegration of water quality improvement strategies into CERP projects ØImplement more aggressive urban and agricultural source control programs

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Post-2006 Strategy Implement steps to accelerate recovery of impacted areas ØIncludes final completion of hydropattern restoration works (East WCA-3A, West WCA-3A, and WCA-2A) following a comprehensive benefit/risk assessment ØRecommended funding of $44.5 million through 2016

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Long-Term Plan Summary Plan is being implemented ØSTA Enhancement designs are underway ØBMP programs are being expanded ØResearch & monitoring are progressing ØIntegration with CERP is happening Long-Term Plan includes total recommended funding of $444 million through Fiscal Year 2016 If needed, return to Legislature for 2 nd 10-yr phase

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Long-Term Plan Update Pre-2006 Projects for ECP Basins Craig Wilson

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Bc10 STA-1E Enhancements Project Manager: Jim Sturgis Project Description: Herbicide treatment of Cells 2, 4N, 4S, and 6 for conversion to SAV. Ø2,998 acres, or 58% of total treatment area downstream of Distribution Cells

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Bc10 STA-1E Enhancements Project status Work completed to date: Coordinate with USACE on PSTA / SAV implementation. Work planned for remainder of FY: Complete design and implement plan.

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Bc20 STA-1W Enhancements Project Manager: Tim Carter Project Description: Convert Cell 3 to SAV Add Pump Station for Maintenance of Stages in Cell 5 ØPump WCA-1 Seepage from Seepage Canal to Cell 5A Refine Operation to Maintain Stages in Cells 1-4 through Normal Operation of G-250S ØSource of water: Seepage Canal Upstream, Direct Seepage to Cells 1,3

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Bc20 STA-1W Enhancements Project status Work completed to date: Survey work underway with geotechnical work to follow. Work planned for remainder of FY: Complete Detail Design by July 2004 for procurement of construction contract to start work in November 2004.

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Bc30 STA-2 Enhancements Project Manager: Tim Carter Project Description: Further compartmentalize each flow path Convert “new” cells 1B and 2B to SAV ØTotal of 4,710 acres (74% of total) in SAV Forward-pumping station in Cell 2A for stage maintenance in 2B

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Bc30 STA-2 Enhancements Project status Work completed to date: Survey, geotechnical, and hydraulic modeling complete. Detail Design underway. Work planned for remainder of FY: Complete Detail Design by June for procurement of construction contract to start work in August 2004.

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Bc40 STA-3/4 Enhancements Project Manager: Rich Virgil Project Description: Subdivide Cell 3 Convert Cells 1B, 2B, and “new” 3B to SAV Ø8,809 acres (53% of total) New forward-pumping stations in each flow path for stage maintenance in SAV cells

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Bc40 STA-3/4 Enhancements Project status Work completed to date: Detail Design is 90% complete. Work planned for remainder of FY: Complete Detail Design and procurement of construction contract to start work in December 2004.

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Bc50 STA-5 Enhancements Project Manager: Rich Virgil Project Description: Convert Cell 2B to SAV (SAV in 59% of total area) Modify G-343 structures for enhanced function and control Additional seepage return pump stations

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Bc50 STA-5 Enhancements Project status Work completed to date: Detail Design is underway nearing 30% complete. Work planned for remainder of FY: Complete Detail Design for procurement of construction contract to start work in October 2004.

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals STA-6 Enhancements (Bc60) & STA-6 Section 2 (Ba62) Project Manager: Rich Virgil Project Description: Enhancements to be completed with the Section 2 construction Compartmentalize Cell 5 Convert “new” Cell 5B and Cell 4 to SAV Add irrigation water supply pump station

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals STA-6 Enhancements (Bc60) & STA-6 Section 2 (Ba62) Project status Work completed to date: Survey, geotechnical, and Detail Design to 60% phase. Work planned for remainder of FY: Complete Detail Design for procurement of construction contract to start work in October 2004.

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals ECP Operation, Maintenance and Monitoring Sharon Trost

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Bf ECP Operations and Maintenance Project Manager: Sharon Trost Project Description: Perform routine maintenance and operation of STAs and related works in keeping with the requirements of the EFA, to maintain optimal nutrient reduction performance.

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Bf ECP Operations and Maintenance Project Status Bf work completed to date ØOperation, Maintenance and Repair of works Mowing, grading of levee roads, maintenance and operation of structures and pump stations Vegetation management- aerial and terrestrial spraying, mechanical harvesting Special projects- G-255 structure closure, Vegetation barrier re-designs

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals BF ECP Operations and Maintenance Project Status Bf work planned for remainder of FY 04 ØOn-going STA maintenance ØOn-going operations of pump stations and structures ØAddition of STA 3/4 and STA-1E to Routine Maintenance ØDe-Watering of Cell 2, STA3/4 for vegetative community succession ØReplacement of selected culverts in original ENR ØSupport of On-going streamgauging / improved flow ratings for STA compliance stations

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Bf80 ECP Permits and Compliance Monitoring Project Manager: Ron Bearzotti Project Description: To fulfill the flow and water quality monitoring, analysis and compliance reporting requirements of the EFA and NPDES permits issued to the District for the ECP.

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Bf80 ECP Permits and Compliance Monitoring Project Status Work completed to date Routine STA Compliance Monitoring and Reporting Program (on-going) ØStaff time for WQ collection and analysis (contracts) ØRoutine Maintenance, Repair and Parts for equipment (on-going) ØLab Analysis Support Mercury Monitoring and Reporting ØSTA-2 Expanded Hg Monitoring 5th Quarterly Monitoring Report Submitted ØUltra trace Hg monitoring STA-3/4 Start-up and Baseline Monitoring (on-going) Flow monitoring/ streamgauging/ improve flow measurements ØExisting STAs

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Bf80 ECP Permits and Compliance Monitoring Project Status Work planned for remainder of FY 04 On-going STA compliance monitoring and analysis Addition of STA-3/4 and STA-1E to Routine Compliance Monitoring Purchase of Monitoring Equipment for STA-3/4 and STA-1E Replacement of old STA monitoring equipment STA-2 Mercury Risk Assessment Report (late March) On-going streamgauging / improved flow ratings for STA compliance stations

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Bf81 STA Site Management Project Manager: Tom Kosier Project Description: Oversee the day-to-day activities involving operation and maintenance of the individual STAs. Provide effective coordination between the field stations, researchers, control room, performance manager, vegetation management and other entities to ensure optimal STA performance. Ensure that STA operational plans are followed. Perform efficient site management of STAs, documentation of site management activities & expenditures

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Bf81 STA Site Management Project status Work completed to date Hired and trained 2 new site managers Coordinated STA-3/4 start up activities Coordinated vegetation management in the STAs Experimental Tussock removal in STA-1W (10,000 cubic yards)

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Bf81 STA Site Management Project status Work planned for remainder of FY Bring STA-1E on line and start up Continue the STA-3/4 start up activities Investigate STA-5 flow constraints

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Bc84(2) Vegetation Maintenance Project Manager: Lou Toth Project Description: To manage vegetation in STA-2 Cell 3 in order to optimize SAV performance.

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Bc84(2) Vegetation Maintenance Project status Site assessment Planned field test of methodologies for conversion

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Long-Term Plan Update Break (15 minutes)