1 EU-Twinning Project RO2006/IB/EN-09 “ Implementation and Enforcement of the Environmental Acquis National Environmental Protection Agency– Phase II”

Slides:



Advertisements
Similar presentations
Environmentally sound management of ship recycling- simple or complex? Roy Watkinson Department for Environment, Food and Rural Affairs UK Promoting Sustainable.
Advertisements

The Committee and Research – Where are we and where might we be going?
ENVIRONMENTAL MONITORING AT SOLID WASTE (SW) LANDFILLS QUIZ Ruxandra Floroiu, Environmental Engineer, ECSSD WB Safeguards Workshop Chisinau, Moldova October.
BoRit Superfund Site Timeline
Managing Hazardous Solid Waste and Waste Sites
Basic Economic Development Course in Pennsylvania Environmental and Commercial Real Estate Legal Issues Surrounding Economic Development Act 2 Issues Scott.
Further Site Investigation Sutton Walls Former Landfill
BLG Environmental Liabilities and the Professions Valerie Fogleman Partner and Head of Environmental Liability Group Barlow Lyde & Gilbert solicitors,
Addressing Historical Environmental Damages in Privatization Bulgaria ’ s Road Towards Improved Environmental Management Adriana Damianova Environment.
C.H. Montin, Ankara 12 May Ankara, 12 May 2014 Further techniques to improve the design of legislation Charles-Henri Montin, Smart Regulation Consultant.
Costs & Benefit of Ecology Integration Serbia - Austria 3rd Conference GREEN SERBIA, Belgrade, 29 February 2012 © Thomas Seegers – Fotolia.com.
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
ENVIRONMENTAL MANAGEMENT PLAN
Environmental Engineering
Environmental Health Unit: Lesson 1 - Introduction Objective: TSWBAT identify issues of how the environment affects our personal health on a daily basis.
Copyright © 2004 McGraw-Hill Ryerson Limited 1 PART 8 – SPECIAL LEGAL RIGHTS AND RELATIONSHIPS  Chapter 35 – Environmental Law Prepared by Douglas H.
Company "ECO" Services (ТОВ “ЕКО”) Company "ECO" (ТОВ “ЕКО”)
Technical Meeting on Evaluation Methodology for Nuclear Power Infrastructure Development December, 2008 Nuclear Safety in Infrastructure Building.
Professor Kenneth C Ross Partner Brodies LLP. Historical background Who pays? Law Society leaflet “Recent clarification of Law Society advice Why is this.
Copyright © 2005 Pearson Education Canada Inc. Business Law in Canada, 7/e, Chapter 3 Business Law in Canada, 7/e Chapter 3 Government Regulation and the.
Update on progress with development of DS459
Sustainable Development of Megacities: A Mega-Challenge for China and the World Tuesday, May 8, 2012 – ICM, International Congress Center, Munich, Room.
* Old gas stations * Old dry cleaners * Oil/chemical spills from past commercial/ industrial operations * Industrial wastes left on property * Old.
4-7 June 2006NATO-CCMS Pilot Study, Athens Contaminated Land in Greece Recent Developments Nymphodora Papassiopi NATO-CCMS Pilot Study Tour de Table -
The Contaminated Land Regulations – Consolidated Review 21 September 2005 Craig Edwards.
Gregor Stephani Umweltministerium Baden-Württemberg 1 EU-Twinning Project RO/2006/IB/EN/09 Implementation and Enforcement of the Environmental Acquis at.
Member of: Austrian Showcase Sarajevo
Romania Hazard Risk Mitigation & Emergency Preparedness Project Aurel Bilanici Ministry of Interior and Administrative Reform.
Quality assurance / Quality control system for the Greek GHG emissions inventory Yannis Sarafidis, Elena Georgopoulou UNFCCC Workshop on National Systems.
Portland Harbor Superfund Site. Overview of Statutes CERCLA - Federal law –Provides EPA with authority for clean up –Provides for liability, compensation,
Policy and Legal Framework on Soil Contamination Management in Thailand Workshop on Strengthening Contaminated Soil Monitoring in Vietnam, November.
1 st Program of Experience Exchange INSPECTION – PLANNING AND REPORTING (CURRENT SITUATION IN THE REPUBLIC OF CROATIA IN CORRELATION WITH IPPC) Brijuni,
State of Environment Reporting in the Republic of Serbia Elizabeta Radulovic EEA NRC SOE Serbia Serbian Environmental Protection Agency Meeting on Environmental.
DEREL TEMPUS DEVELOPMENT OF ENVIRONMENTAL AND RESOURCES ENGINEERING LEARNING DEVELOPMENT OF ENVIRONMENTAL AND RESOURCES ENGINEERING LEARNING.
1 BULGARIA PUBLIC- PRIVATE PARNERSHIP FOR REMEDIATION OF HISTORICAL POLLUTION Dr. Vania Grigorova Ministry of Environment and Water Bulgaria Managing for.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Regulatory Authority.
BUWALOFEFPUFAFPSAEFL Environmental Pollution and Applicability of Remediation Technologies in Latin American Countries BUWALOFEFPUFAFPSAEFL Contaminated.
3/9/12 PURPOSE: manage and ensure chemical and waste management policies and legislation are implemented and enforced in compliance with chemicals and.
1 Key challenges and possible solutions Croatia 10 th REReP Task Force meeting November 27 th, 2007 Brussels, Belgium.
Capacity Building of Kazakhstan Aarhus Centres in Providing Access to and Exchange of Environmental Information Olga Melnik, Information and Analysis Center.
South Australia’s Environment Protection Authority Articulating aesthetics Monday 24 August 2015 Andrew Pruszinski.
Strengths and weaknesses of the permitting system and enforcement process in RIEW – Veliko Turnovo Regional Inspectorate of Environment and Water - Veliko.
Progress with Priority Environmental Infrastructure Investment Projects in Croatia PEIP Regional Meeting - 26 th November 2007 Brussels MINISTRY OF ENVIRONMENTAL.
Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 MONITORING Mr. Jan Prášek IPPC Agency.
UK Tour de Table NATO/CCMS Pilot Study Baia Mare, Romania 2003 Dr Theresa Kearney.
Environmental Factors In this module, we will discuss: Environmental legislation Environmental hazards Due diligence Conducting an environmental.
Ukraine Petro Nakhaba All-Ukrainian Public Organization “ Chysta Khvylya ” Deputy Head Kyiv, Ukraine Contaminated Sites Management Joint UMOE-DEPA Project.
19/11/2015 PSB and PS&TT2 Facilities YETS L. Kobzeva.
Jim Lapp City of Edmonton SWANA Northern Lights Chapter 2/19/2016Lesson 11 1.
The Resource Conservation and Recovery Act of 1976 and 1989 (RCRA) Alex Chenault Period 4.
Socially Acceptable Costs for Municipal Solid Waste Management Services Vojtěch Doležal, SEWACO s.r.o 24 June 2015 ISWA Study Tour WASTE-TO-ENERGY.
Environmental Site Assessments Hazardous Materials/ Regulated Substances Categorical Exclusion Training Class.
Lithuanian Water Suppliers Association LEGAL REGULATION OF WASTEWATER DISPOSAL AND TREATMENT IN LITHUANIA.
Development of Decision Support Tools for brownfields and contaminated sites management and redevelopment [Bezama, A.; Navia, R.; Novak, J. & Lorber, K.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
Lecturer: Lina Vladimirovna Zhornyak, Associate Professor.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 27 – Environment and Climate Change.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 27 – Environment and Climate Change.
MONITORING Mr. Jan Prášek IPPC Agency.
Soil Pollution 2: Electric Boogaloo -The powerpoint-
International HCH & Pesticides Association
Establishing the Infrastructure for Radiation Safety Preparatory Actions and Initial Regulatory Activities.
AFPC Policy Protect its personnel, contractors,3rd parties and the environment against the hazards of exposure to ionizing radiation due to AFPC activities.
Representative Measurements – AQ-Workshop Bucharest, July 2008
INDOT Storm Water Management
Relationship between World Bank and Romanian EA requirements
Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Purpose To address the hazards to human health and the environment presented.
The Government Role in BOT
a. Financing b. Designing c. Construction d. Operating
Palais des Nations, Geneva, Switzerland
Presentation transcript:

1 EU-Twinning Project RO2006/IB/EN-09 “ Implementation and Enforcement of the Environmental Acquis National Environmental Protection Agency– Phase II” Draft Technical Guidline Zur Methodologie, der Bewertung und Beurteilungskriterien zur Erfassung und Untersuchung von Altlasten Art.15 der Regierungsentscheidung 1408

2 EU-Twinning Project RO2006/IB/EN-09 “ Implementation and Enforcement of the Environmental Acquis National Environmental Protection Agency– Phase II” World Bank Project National Strategy for the Management of Contaminated Areas in Romania, 29.May 2008 Royal Haskoning Nederland

3 EU-Twinning Project RO2006/IB/EN-09 “ Implementation and Enforcement of the Environmental Acquis National Environmental Protection Agency– Phase II” National Inventory Scoring and prioritization system Compendium remediation techniques Training needs Compendium fieldwork techniques Technical guidline assessment,risk assessment Action plan Technical guidline historical investigation

4 EU-Twinning Project RO2006/IB/EN-09 “ Implementation and Enforcement of the Environmental Acquis National Environmental Protection Agency– Phase II” Lessons from the German restructuring process Rough cost estimates are indispensable to budget planning (use of formalised procedures is helpful in attaining goals). The instrument of non-liability for site contamination is, in principle, anappropriate means of removing obstacles to investment and privatisation. Special and individual arrangements for financial compensation for expenditure for site remediation by the private investor is not unproblematic from the viewpoint of the environmental authorities. Permanently unsolved site risks and unpaid financial contributions from remediation projects cause a conflict of goals. Consensus between the financing parties is only possible on the basis of solid research dealing with hazards and a pragmatic search for solutions. The privatisation process has led to a surplus of former industrial sites. Intelligent use strategies must lead to the harmonisation of site attractiveness.

5 EU-Twinning Project RO2006/IB/EN-09 “ Implementation and Enforcement of the Environmental Acquis National Environmental Protection Agency– Phase II” Historical Investigation Site inspections Main elements of a site inspection: Registering of the state of the area as a whole (applicable to former industrial sites and waste disposal sites); Investigation of the possibilities for sampling such as wells and level indication or foundations of buildings; Registering of the present condition of buildings in comparison to already existing plans; Photo documentation

6 EU-Twinning Project RO2006/IB/EN-09 “ Implementation and Enforcement of the Environmental Acquis National Environmental Protection Agency– Phase II” Historical Investigation/ Site inspections The following checklist gives an overview of the data that could possibly be obtained during a site inspection: Drainage conditions (erosion pathways, discharges into water bodies etc.); Vegetation, damage of vegetation; Characteristics of the soil (morphology, odour, consistence, type of soil, humus content, etc.); Condition of water bodies; Use at the site; Use in the surrounding area; Containment against unauthorised access; Other remarks. Size and limits; Correspondence with available plans; External areas, internal premises (condition, odour, visible waste or harmful substances, etc.); Special features of construction, discolouration of buildings; Anomalies of the territory, strange topography; Leakage of seepage water and landfill gas (gas emissions are possible also in the farer surrounding);