PLANNING, DESIGN & CONSTRUCTION SOUTH DINING RENOVATION PROJECT # 09.630.161 CONSTRUCTION MANAGER AT RISK (CMAR) SELECTION PRE-SUBMITTAL MEETING September.

Slides:



Advertisements
Similar presentations
ENTITIES FOR A UN SYSTEM EVALUATION FRAMEWORK 17th MEETING OF SENIOR FELLOWSHIP OFFICERS OF THE UNITED NATIONS SYSTEM AND HOST COUNTRY AGENCIES BY DAVIDE.
Advertisements

CEFPI is a Registered Provider with The American Institute of Architects Continuing Education Systems (AIA/CES). Credit(s) earned on completion of this.
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
CMGC Contracting at UDOT Program, Projects & Lessons Learned
A relentless commitment to academic achievement and personal growth for every student. Redmond School District Graduates are fully prepared for the demands.
Education Campus What a Difference a Year Makes! Takoma.
FY 2012 SIG 1003G LEAD PARTNER REQUEST FOR SEALED PROPOSAL (RFSP) BIDDERS’ CONFERENCE February 7, 2011.
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
CSN Project # RFQ 180 and RFQ 181 Fire Station/College Instructional Center Scope of Work 14,000 SF structure on West Charleston Campus to house.
Facilities Institute July , 2012 Houston, Texas Click to edit Master title style
Auxiliary Services CWU Board of Trustees February 4, 2010.
CSN Project # EHSB Addition - Scope of Work 10,000 SF addition to K Building on West Charleston Campus to house the Cardiorespiratory Program.
Presentation By: Chris Wade, P Eng. Finally … a best practice for selecting an engineering firm.
WELCOME TO THE PROCUREMENT SEMINAR Procurement and Contracts An Overview of Contract Administration.
How Architects and Engineers Get Business with the State June 3, 2015.
How to Prepare for State Architect & Engineering Services and Upcoming Construction Projects How Architects and Engineers Get Business with the State May.
FY14 Budget Priorities August UAS Mission UAS Core Themes  Student Learning enhanced by faculty scholarship, undergraduate research and creative.
Human Resource The Recruitment Agency. ABOUT US HRRA (Human Resource Recruitment Agency) is an independent company specializing in staff recruitment since.
Atlanta Public Schools Project Management Framework Proposed to the Atlanta Board of Education to Complete AdvancED/SACS “Required Actions” January 24,
THE ECONOMICS OF RE-CREATING EDUCATIONAL ENVIRONMENTS HOW TO ACHIEVE HIGH PERFORMANCE SCHOOLS.
Partnerships and Broadening Participation Dr. Nathaniel G. Pitts Director, Office of Integrative Activities May 18, 2004 Center.
Mission The faculty and staff of Pittman Elementary School are committed to providing every student with adequate time, effective teaching, and a positive.
PLANNING, DESIGN & CONSTRUCTION SOUTH DINING RENOVATION PROJECT # DESIGN PROFESSIONAL SELECTION PRE-SUBMITTAL MEETING September 2 nd, 2015.
Main Building Utility Plan Phase 1 - Study PRE-SUBMITTAL CONFERENCE May 14, 2008, 9:00 AM.
Atlanta Board of Education AdvancED/SACS “Required Actions” February 14, 2011.
Indiana Hoosier Lottery Lottery Draw Witness Pre-Proposal Conference September 14, 2012 Stan Judson IDOA Strategic Sourcing Analyst.
January 24, …a delivery method which entails a commitment by the Construction Manager to deliver the project within a Guaranteed Maximum Price (GMP).
Presented by: Masoud Shams Ahmadi February 2007 Enterprise Resource Planning (ERP) Selection Presented by: Masoud Shams Ahmadi
NCHRP Study (30) Performance Measures for Context Sensitive Solutions – A Guidebook for State DOTs As presented by Sally Oldham at the 2005 Midwest.
Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.
CENE 386 Engineering Design: The Methods. Getting Ready to Get the Job Getting as much information as possible prior to making the proposal –Profile the.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
An Introduction To Food Service Consulting FCSI & AIA Working Together.
RFP Oligonucleotides Pre-Submittal Conference 1 October 13, 2015.
PLUTUS PARTNERS COMPANY PROFILE : Plutus Partners is a leading consultancy and contracting company in India that has executed construction work for some.
All rights reserved © 2005 Eminent System. April 14, Oct 04, 2007 EMINENT SYSTEM.
LEED Certified Experience Samet Corporation was founded in 1961 by Norman Samet in High Point, NC (NC GC License 3538). While Samet started as a design/build.
Office of the Vice Chancellor for Student Affairs (OVCSA) Barbara Henley, Ph.D. Vice Chancellor.
PLANNING, DESIGN & CONSTRUCTION RECITAL HALL PROJECT # DESIGN PROFESSIONAL SELECTION PRE-SUBMITTAL MEETING January 12, 2016.
Project Budget Review _ Control Developed by: Daniel J. Renna 3/16/20161.
Office of Major Project Development (OMPD) Overview November 2015.
Construction Management At Risk Process
CONSTRUCTION MANAGEMENT AT RISK Prepared by: Nancy Fouad Carey Attorney AGC Alabama Birmingham Section Meeting November 5, 2012.
1 EASTERN MUNICIPAL WATER DISTRICT Indirect Potable Reuse Public Outreach Framework Jolene Walsh Senior Director, Public and Governmental.
Higher Learning Commission (HLC) Re-affirmation of accreditation in
Leadership for Project and Program Success How professional Construction Management saves time, saves money and delivers quality projects.
PENNSYLVANIA’S STATE SYSTEM OF HIGHER EDUCATION
Container Freight Station, Utilities and Drainage at Bayport Container Terminal (RFQ-148) Brenda Trevino, P.E. Project Manager October 11, 2016.
Fort Stanwix National Monument Energy Audit Contract
Overview of MSBA Building Process and Project Timeline
Procurement & Strategic Sourcing
Planning, design & construction RECITAL HALL Project #
Clinical Practice evaluations and Performance Review
Planning, design & construction TINSLEY HALL RENOVATION Project # 09
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
RFP EMISSIONS SOURCE VALIDATION
Management of Placement Area at Bayport Container Terminal (RFQ-147)
American Institute of Constructors
Consultant Selection Training
Drainage Improvements at VW Yard (RFQ-101)
UNC Charlotte INTERCOLLEGIATE SWIM TEAM PROJECT
PROJECT DELIVERY METHODS
CxA at Georgia Tech TRAINING OUTLINE Overview of CxA
PENNSYLVANIA’S STATE SYSTEM OF HIGHER EDUCATION
The emphasis of Construction Management and Preconstruction Services in the AEC industry Preconstruction Services Construction Management.
Add Engineering Value to your Project through BIM Preconstruction Services Preconstruction Services BIM Engineering U.S., L.L.C. – Best Preconstruction.
OCPS CCNA SELECTION COMMITTEE TRAINING
Multi-discipline academic research science technology engineering & math (stem) building project phase 1 NAU Project No RFQ for Construction.
Procurement & Strategic Sourcing
Procurement & Strategic Sourcing
Presentation transcript:

PLANNING, DESIGN & CONSTRUCTION SOUTH DINING RENOVATION PROJECT # CONSTRUCTION MANAGER AT RISK (CMAR) SELECTION PRE-SUBMITTAL MEETING September 9, 2015

AGENDA 2 NAU Mission & Goals: 2015 and beyond… South Dining Renovation: Project’s Mission & Goals Site & Utility Maps Pre-Construction Phase Construction Phase Schedule Project Cost Assumptions Sustainability & Total Cost of Ownership Pre-Construction and Construction Expectations Other Consultants under Owner Qualification submittal format Questions??

NAU MISSION & GOALS: 2015 AND BEYOND… 3 Mission: To provide an outstanding undergraduate residential education strengthened by research, graduate and professional programs, and sophisticated methods of distance delivery. Values: Excellence in Education: Offer a rigorous, high-quality education to all students. Student Success: Place learner needs at the center of our academic and service planning, policies, and programs. Educational Access: Provide all qualified students with access to higher education. Diversity: Achieve multicultural understanding as a priority of educational and civic life. Integrity: Operate with fairness, honesty, and the highest ethical standards to sustain a community of trust. Civility: Support a civil, engaging, and respectful campus climate.

NAU MISSION & GOALS: 2015 AND BEYOND… 4 Strategic Goals: Student success Nationally recognized research excellence Global engagement Diversity, civic engagement, and community building Commitment to Native Americans Sustainability and effectiveness Design a sustainable and effective building that will streamline kitchen and food service efficiency to the benefit of the students and dining staff.

SOUTH DINING RENOVATION PROJECT’S MISSION & GOALS 5 South Dining Renovation Mission: The Mission will be developed with the successful Design and CMAR Team, NAU stakeholders, Commissioning Team and NAU PDC Rep’. The focus of this project from Day 1 will be “Teamwork”.

SOUTH DINING RENOVATION MISSION & GOALS 6 South Dining Renovation Goals: Codes upgrades (FLS, ADA, etc…), Structural repairs, Building upgrades to create an exceptional dining experience, Building efficiency, Flexible/Adaptable Dining Spaces, Students study/learning areas (as allowed in budget), Sustainability & Total Cost of Ownership, Win-Win-Win Team concept for all, Design and Construction teams engaged at the beginning and throughout, Tight delivery schedule (for both design & construction)

SITE MAP 7

8 Site considerations: Create a sense of community on South Campus Proximity of existing student housing facilities (construction working hours, safety, etc..) Food deliveries Relocation of utilities as required NAU ITS Central Hub for fiber distribution (do not disturb) Continuous delivery of food services to students throughout construction Disruption avoidance Site logistic plan

UTILITY MAP 9 Utility wise, the entire South Dining building is fed from same utility points.

PRE-CONSTRUCTION PHASE 10 Review Pre-construction and Construction requirements in the RFQ and in DP/CMAR contracts. Review the DP’s Agreement so you understand their responsibilities as well Review NAU Design Guidelines & NAU Technical Standards Be ready to submit your Pre-Construction proposal shortly after CMAR Team selection!!!

PRE-CONSTRUCTION PHASE 11 Residential Dining is about 28,000 GSF within South DuBois. The area is sufficient in size but is old, structurally not sound, the kitchen is all electric, and overall is not as efficient as it should be… We do not need to add square footage to the facility. CMAR team will be required to investigate a full on renovation vs total demo and re-construction of the residential dining, in collaboration with the DP team. Decisions on construction phasing options. Build a cutting-edge, modern equipment kitchen… Retail dining must remain open during this project. Subcontractor Selection for design-assist as needed. Accurate, real-time estimates throughout pre-con. It should not take weeks for estimate feedback.

SITE MAP 12

PRE-CONSTRUCTION PHASE 13 Bldg. 64 Not in scope Basement

PRE-CONSTRUCTION PHASE 14 Bldg. 64 Not in scope 1 st Floor

PRE-CONSTRUCTION PHASE 15 Bldg. 64 Not in scope 2 nd Floor

PRE-CONSTRUCTION PHASE 16 Bldg. 63 In scope Basement 130’-6” 114’-11”

PRE-CONSTRUCTION PHASE 17 Bldg. 63 In scope 1 st Floor 113’-9” 114’-11”

CONSTRUCTION PHASE 18 Review the current CMAR NAU contract prior to submittal as terms & conditions of the contract won’t be negotiable. Review Pre-construction and Construction requirements in the RFQ and in DP/CMAR contracts. Need to maintain Food Service function in the building (Bldg. 63 and/or 64) or in immediate proximity of this facility. Potentially work construction in phases. Students traffic around the project. Safety. Working hours.

SCHEDULE 19 DP selected by 9/29/15 CMAR selected by 10/08/15 Assessment/Feasibility/Programming done by 11/13/15 100% Schematic Design done by 12/24/15 100% DD done by 2/26/16 100% CD done by 4/22/16 ABOR Approval at the 6/8/16 Business & Finance meeting JCCR Approval TBD Start construction either right after ABOR approval (6/9/16) if we can start without JCCR’s approval, or after 7/16/16 (after the Explorer 2016 Conference). Substantial Completion Date is 7/14/17. Open Food Services to Students around mid-August 2017.

SCHEDULE 20

PROJECT COST ASSUMPTIONS 21 Construction Cost:$10,500,000 to $14,000,000 Soft Cost (40%):$4,500,000 to $6,000,000 o This includes FF&E, DP Fee, Other Owner Costs Total Project Cost:$15,000,000 to $20,000,000 o $15M is for dining, up to $5M additional for student learning space Estimated Total Gross Square Footage Range: o Bldg. 63 (South Dining) =~ 28,000 GSF o Potential Students tutoring space = TBD

SUSTAINABILITY & TOTAL COST OF OWNERSHIP 22 This facility is expected to be LEED Gold Certified. CMAR Team (including proposed Sub-Contractors such as MEP Trades) shall have strong knowledge and experience with sustainability initiatives relative to this type of building and with renovation and construction. Pre-construction team must have a strong understanding/experience with energy-efficient HVAC systems. Total Cost of Ownership shall be calculated to demonstrate that building materials and building systems will be selected based on most sustainable criteria.

PRECONSTRUCTION & CONSTRUCTION EXPECTATIONS & TEAM APPROACH 23 Collaboration between DP and CMAR for: o dynamic estimating of construction costs throughout the design process to prepare cost estimates that accurately forecast a detailed GMP, o detailed scheduling around design and construction efforts. Analyze of phasing options, o budget and scope management, o constructability reviews, system reviews and value engineering. Active/Engaged participation with constructability from Assessment/Programming through Commissioning. Experience with achieving low Cost of Ownership (energy efficient building with adaptability).

OTHER CONSULTANTS UNDER OWNER 24 Geo-Tech investigation: as needed Survey: as needed 3 rd party Estimating Firm: to provide independent estimating and validation of DP’s and CMAR’s estimates at Schematic and GMP phases. Commissioning: Commissioning Agent will be hired by NAU by end of September and will actively participate in design review during the pre-construction phase. Both DP and CMAR will be required to be fully engaged during commissioning activities at the end of construction.

QUALIFICATION SUBMITTAL FORMAT 25 Proposal due date: September 21, 2015 by 3:00 pm 1 Original and 8 Copies + 1 Electronic Version Page Count: o Items A – G cannot exceed 20 pages o Tabs do not count as pages unless there is content on them o Resumes cannot exceed 2 pages each Proposed team-member’s projects, not firm’s projects o Submittal Certification is 1 page

DISQUALIFICATION ITEMS 26 Refer to RFQ for specifics o Turning in submittal late – if mailing, be mindful of slow delivery times o Contacting any NAU employee regarding this project other than as outlined in the RFQ (Stephanie Bauer) o Not providing the correct number of submittals or exceeding the page limit o Submitting in the wrong location o Company profiles in Resumes. Resumes should be about the individual, not the firm

SOUTH DINING RENOVATION PROJECT # QUESTIONS???