TVA Kingston Ash Recovery Project Roane County, TN Project Update September, 2012 Neil Carriker.

Slides:



Advertisements
Similar presentations
Kingston TVA Coal Ash Spill
Advertisements

Framework for the Ecological Assessment of Impacted Sediments at Mining Sites in Region 7 By Jason Gunter (R7 Life Scientist) and.
Former NAS Moffett Field
TVA Kingston Ash Recovery Project Roane County, TN Environmental Research Symposium Roane State Community College – August 2, 2011 Craig Zeller, P.E. US.
Fish Bioaccumulation Studies Associated with the Kingston Fly Ash Release Marshall Adams - Oak Ridge National Lab Tyler Baker - TVA Allison Fortner - Arcadis.
Mark S. Greeley 1, S. Marshall Adams 1, Tyler F. Baker 2, Logan R. Elmore 1, Mary K. McCracken 1, and Rick M. Sherrard 2 1 Oak Ridge National Laboratory.
BoRit Superfund Site Timeline
Imagine the result The TVA Kingston Ash Recovery Project: Ecological Risk Approach Daniel Jones † Suzy Young † Amber Stojak † Neil Carriker ‡ † ARCADIS.
The Past, Present and Future of Coal Ash Management in Virginia Presentation to the State Water Commission June 23, 2014.
TVA and The Kingston Ash Spill Environmental Disaster By: Tikedra Kellum.
River Corridor Closure Project Safety People Results U.S. Department of Energy Richland Operations Office 100 Area and 300 Area Component of RCBRA Steve.
Kingston Fly Ash Release Environmental Symposium August 2, 2011 Neil E. Carriker, Ph.D. Tennessee Valley Authority.
PUBLIC INFORMATION SESSION: Old Fall River Road Landfill Dartmouth, MA Massachusetts Unlined Landfill Closure Policy March 28, 2013 Mark Dakers, Acting.
Trends in Bioaccumulation of Fly Ash Contaminants by Aquatic Invertebrates Downstream of the Tennessee Valley Authority Kingston Fossil Plant John G. Smith,
2014 Dan River Ash Release-Summary and Update NC Water Resources Congress October 30, 2014.
Mudboils AEES Pre-Conference Workshop Wednesday, June 6, 2012 Nate Barlet Brandon Winfrey Roy Wood.
Airport Road Waste Disposal Area April 28, 2005 The University of North Carolina at Chapel Hill.
Colorado School of Mines Research Institute Site DRAFT REMEDIAL INVESTIGATION/FEASIBILITY STUDY AND PROPOSED PLAN.
Clear Lake Region Pesticide Environmental Risk Project Sarah Ryan Big Valley Rancheria EPA Western Region Pesticide Meeting May 2005.
Former DuPont Barksdale Works Project Update June 07, 2006 Great Lakes Visitors Center DuPont CRG.
Sustainability and Best Management Practices Environmental Remediation Russell Downey Pfizer Global Engineering 5 November 2014.
California’s Surface Water Ambient Monitoring Program SWAMP Today Emilie L. Reyes November 29, 2007.
Module 4: Getting Ready: Scoping the RI/FS. 2 Module Objectives  Explain the purpose of the scoping phase of the RI/FS  Identify existing data which.
Porewater Collection and Risk Evaluation 27 th Alabama Water Resources Conference Orange Beach, AL Jacob Gruzalski Environmental Standards, Inc.
TV Kingston Fossil Plant Coal Fly Ash Slurry Spill
National Aquatic Resource Surveys National Coastal Condition Assessment – 2010 Sarah Lehmann.
Screening Level Ecological and Human Health Risk Assessment Poplar Point, Washington, DC.
McCoy Field Proposed Keith Middle School Site EPA Proposes Approval of McCoy Field Cleanup Plan.
Jan 2005 Kissimmee Basin Projects Jan Kissimmee Basin Projects Kissimmee River Restoration Project (KRR) Kissimmee Chain of Lakes Long Term Management.
Scott Surovchak Rocky Flats Site Manager U.S. Department of Energy (DOE) Office of Legacy Management (LM) Cleanup and Remedy Implementation at the Rocky.
Update on the Superfund Program: U.S. Tour de Table NATO SPS Pilot Study Prevention and Remediation in Selected Industrial Sectors June 17-23, 2006 Ljubljana,
A Hazardous Waste Site PCB Contamination. Polychlorinated Biphenyls (PCBs) Man-made class of oil-like chemicals used in the manufacture of electrical.
COMMITMENT & INTEGRITY DRIVE RESULTS Risk Based Corrective Action Using site-specific risk assessment to achieve Regulatory Closure.
Challenges of Performing Contaminated Sediment Remediation and Restoration in China and Taiwan Brian J. Mastin, Ph.D. Dave Renfrew Jerry Chen Samuel Wu.
Multimedia Assessment for New Fuels: Stakeholders’ Meeting September 13, 2005 Sacramento, CA Dean Simeroth, California Air Resources Board Dave Rice, Lawrence.
Water Quality Data, Maps, and Graphs Over the Web · Chemical concentrations in water, sediment, and aquatic organism tissues.
Spectron Superfund Site Proposed Plan Contaminated Shallow Soils U.S. EPA Region III June 26, 2003 Philadelphia, PA Robert J. Sanchez US EPA - Remedial.
History and Cleanup at Chemical Commodities, Inc. Jeff Field US EPA Region 7 1.
Portland Harbor Superfund Site. Overview of Statutes CERCLA - Federal law –Provides EPA with authority for clean up –Provides for liability, compensation,
Development of Sediment Quality Objectives for California Bays and Estuaries Project Update-June 2004 Steven Bay Southern California Coastal Water Research.
Review of Current Conditions Report and Work Plan for Area 1 Presented by The Great Plains/Rocky Mountain Technical Outreach Services for Communities.
Development of Sediment Quality Objectives for California Bays and Estuaries Project Update-April 2004 Steven Bay Southern California Coastal Water Research.
Triangle Park Removal Action Area within the Portland Harbor Superfund Site (Portland, Oregon) Jennifer MacDonald Assistant Regional Counsel Office of.
SEDIMENT EVALUATION FRAMEWORK: THE APPLICANT EXPERIENCE Jeffrey Peterson, Ph.D.
Alternative Sediment Remediation Authorities to CERCLA: Elizabeth River Demonstration Robert Engler Moffatt & Nichol),
Development of Sediment Quality Objectives for California Bays and Estuaries Technical Approach Steven Bay Southern California Coastal Water Research Project.
Placer County Water Agency Middle Fork American River Project Plenary Meeting June 1, 2009 Handout #2.
By Mitch Cooper & Haley Herbert January 1987 Vertac site manufactured herbicides 1978 National Dioxin Survey 1983 Site placed on the National.
Project Update: Hudson River PCBs Superfund Site October 24, 2012 Mr. David King, PE – USEPA Region 2 Mr. Gary Klawinski – USEPA Region 2 Mr. Mark Surette.
Margaret Byrne, U.S. Fish and Wildlife Service
I RIS E NVIRONMENTAL Independent Review of Documents Pertaining to the Lehigh Southwest Cement Permanente Facility Rob Balas & John McLaughlin February.
Brian Hitchens and Sam Williams PCBs in the Urban Environment: Implications for Long-Term Sustainability Of Low-Threshold Remediation.
Planning Habitat Restoration for Dredging Projects WEDA Midwest Chapter Conference Green Bay, Wisconsin April 27, 2012 Jack Brunner.
Strategic Planning for Contaminated Sediment Projects: Setting the Course for Proper Project Execution Howard L. Cumberland Geosyntec Consultants October.
Tulsa Fuel & Manufacturing Superfund Site Remedial Design and Cleanup Plans September 2014.
Tennessee Division of Solid Waste Management Air and Waste Management Association - August 2010.
Alternative Evaluation Framework for Managing Dioxins/Furans in Dredged Material Proposed for Open-Water Disposal Tad Deshler Windward Environmental LLC.
David K. Paylor Virginia State Board of Health March 17, 2016.
1 FORMER COS COB POWER PLANT From Characterization to Redevelopment Brownfields2006 November 14, 2006.
 Clean Water Act 404 permit  Ohio EPA Division of Surface Water 401 water quality certification  Ohio Revised Code 6111 – Placement of dredged materials.
GEORGIA PACIFIC WEST PROPOSED INTERIM ACTION Public Meeting & Open House – July 12, 2011.
1 Historic DoD Ocean Disposal Operations, Requirements, and Research Hawaii Robotics Initiative for Underwater Military Munitions Oahu, Hawaii October.
9 th International HIA Conference A framework for public health officials to integrate HIA considerations in municipal project undertakings for the City.
Rivanna Water & Sewer Authority Presentation to City of Charlottesville Workshop South Fork Rivanna Reservoir (SFRR) Dredging Concept Review May 6, 2008.
Fort Detrick Installation Restoration Program Area B Groundwater November 1, 2010 Fort Detrick, Maryland A Sustainable Community of Excellence.
Proposed Plan for No Further Action
TVA Kingston Ash Recovery Project Roane County, TN
Niagara River Area of Concern
RINGWOOD MINES/LANDFILL SITE PUBLIC MEETING December 6, 2016
SB 807 Implementation Status Update October 2018
Presentation transcript:

TVA Kingston Ash Recovery Project Roane County, TN Project Update September, 2012 Neil Carriker

3 ½ Years of Recovery December 23, 2008 June 28, 2012

Overview Project accomplishments – Phases 1 & 2 Phase 3 — What to do about the residual ash?

Phase 1: Time-Critical (Complete) –3.5 million cu yd removed from Emory River –4.0 million tons disposed at Perry County, AL (completed 12/01/10) –Emory River reopened May 29, 2010 Phase 2: Non-Time Critical (On-going) –2.8 million cu yd –Reinforced, on-site disposal area –Perimeter containment wall Phase 3: Residual Ash –Addressing residual ash in river system –River ecosystem and human health risk assessments –Long-term monitoring (5-year reviews) CERCLA Removal Action Strategy

Phase 2 Operations Ash Excavation – North Embayment (complete) 865,000 CY removed by December 2011 – Middle Embayment: 65% complete--finish mid-2013) 800,000 CY removed/330,000 CY left – Relic: 308,000 CYs relocated Ash Stacking – Central Dredge Cell1,006,000 CY – Lateral Expansion337,000 CY – Ash Pond 213,000 CY – Complete by late 2013 Perimeter Wall Construction – 38% Complete – Finish by mid-2014 Cell Cap & Closure – Liner/Drainage Layer/2 feet of clay + soil – Finish End of 2014

3 ½ Years of Recovery December 23, 2008 June 28, 2012

Phase 3 Residual ash summary Human health risk assessment Ecological risk assessment River System EE/CA Alternatives

Phase 3 – River System Sampling & Analysis Plan

TVA’s River System Investigation Framework for Human Health and Ecological Risk Assessments Multiple approaches to evaluate effects Overall Scope: More than:  16,000 samples collected  400,000 analyses on those samples Rigorous Data Quality Assurance Several Environmental Consultants & Labs State/Federal Orgs (TDEC, TWRA, USGS, USACE, ORNL, USFWS) 12 Universities

River System SAP Investigations Water – Groundwater – Surface water – Water within sediments (pore water) Ash nature & extent – How much? – Where is it? Sediment – Mixing with ash? – Transport by storm flows? – Toxicity testing Living Organisms – Bioaccumulation – Fish and Benthic Community Surveys

Residual Ash ● Approximately 510,000 CY, total 3 % in Emory Reach C (ERM 3.5—6) –82 % in Emory Reaches A & B (ERM 0—3.5) –1% in Clinch Reach A (CRM 0—3) –14% in Clinch Reach B (CRM 3-4.5) ● Maximum ash depth is ~4-6 ft

Summary Human Health Risk Assessment Examined multiple exposure scenarios Used data from Kingston, not somewhere else Followed EPA risk assessment guidance Results:  Confirmed risks from legacy PCBs and Hg in fish tissues  TDEC fish consumption advisory pre-dating the spill  No unacceptable risks associated with residual ash  Agrees with 2010 TN DOH Public Health Assessment  Agrees with ORAU/Vanderbilt Medical Screenings

Seventeen receptors Risk indicators: –Arsenic –Selenium Findings: –Moderate/Low risk to organisms that: Live in sediment Eat organisms that live in sediment - Benthic Invertebrate (bugs) - Tree Swallow - Killdeer Ecological Risk Assessment Summary Mayfly Nymph Killdeer

Fish Community

Removal Action Objectives Protect invertebrate populations in Watts Bar Reservoir – Arsenic and selenium in ash-contaminated sediment Protect shoreline-feeding and aerial-feeding bird populations – Uptake of arsenic and selenium through diet (benthic invertebrates) Restore ecological function and recreational use of the river system to pre-release conditions Dispose of wastes from the removal action in accordance with applicable regulations

Alternatives Evaluated Alternative 1:Monitored Natural Recovery – Natural mixing/burial; 30 year monitoring program with 5 Year Reviews (NPV=$10M) – Sediment fate/transport modeling Alternative 2:In-situ capping – Alt 2a: cap 200 acres of ash deposits >0.5’ thick (NPV=$44.8M) – Alt 2b: cap 160 acres of ash deposits subject to scouring (NPV=$38.7M) Alternative 3:Dredging – Alt 3a: dredge 440,000 cys of ash deposits (NPV=$179.1M) – Alt 3b: dredge 160,000 cys in areas of greater ecological significance (NPV=$83.4M)

Community Involvement Phase 3 EE/CA Process Conducted 6 educational workshops – March-June 2012 at Roane State Community College River System EE/CA Report (and HHRA & BERA) – Made available for public comment Friday, August 10 – Public comment period - 08/11/12 – 10/10/12 Public Meeting on August 21 Press Releases/Fact Sheets Phase 3 Action Memo & Responsiveness Summary - Fall 2012

River System EE/CA available for review: – – – Kingston & Harriman, TN Public Libraries (on DVD) – On DVD upon request