CERGOP-2 Conference, Warsaw, September 29 - 30, 2003 CERGOP-2/Environment A Challenge for the Next 2.5 Years P. Pesec Space Research Institute, Graz, Austria.

Slides:



Advertisements
Similar presentations
DNV No. 1 © 2000 Det Norske Veritas D ET N ORSKE V ERITAS THEMES Plans and expected contribution WP VII - Network Management.
Advertisements

Characteristics of projects in EU research programmes
EGIDA Stakeholder Network and Advisory Board and Their Relevance for EGIDA and GEO Stefano Nativi 1 st Joint Workshop of the EGIDA Stakeholder Network.
Progress and Financial Reporting Geoff Butters, MDR Partners 05 March 2012, KB, The Hague.
Training Module: The MED-Dialogue project (611433) is co-funded by the European Community's ICT Programme under FP7 6 - Resource Allocation and Budgeting.
1 Emerging communities for collective innovation: ICT Operational tool and supporting methodologies for SME Associations 2010 January,
ASPERA-2 WP2: Extension of the network and update of the status of Astroparticle Physics  Objectives  Structure  Tasks  Milestones & Deliverables Kickoff.
GENIUS T4 - September 2014 GENIUS T4 Teleconference X. Luri.
EPN LAC Workshop 2008 Frankfurt Main, Germany, October, 2008 ASI Local Analysis Center Report C. Ferraro, Telespazio/CGS Matera R. Pacione, e-GEOS/CGS.
FINANCIAL REPORTING Rules and Regulations
ACCEPT project Grant Agreement FP7-SSH-2009-A.
Funded by:. Thank you all! For your inputs in the first both contents and financial annual reporting, which has now been accepted Note that all reports.
Michael Warren Senior Emergency Services Coordinator HMEP GRANT ADMINISTRATOR (916) ~~~~~~~~~~~~~~~~~~~~~~~
M.Sc Projects David Wilson M.Sc Projects Coordinator for Computing & Information Systems.
TUTORIAL Grant Preparation & Project Management. Grant preparation What are the procedures during the grant preparations?  The coordinator - on behalf.
EVALUATION AND QUALITY ASSURANCE STRATEGY PRESENTED BY DR SHYAM PATIAR.
Development plan and quality plan for your Project
STRUCTURE SCIENTIFIC REPORT / MANAGEMENT REPORT Progress / objectives (WP and project level) Progress / milestones (WP and project level) Progress / deliverables.
NOV-3733-SL-9715 Carbones KOM - May 10-11, 2010 – Toulouse, France 1 KICK-OFF MEETING May 10-11, 2010.
Name, Surname, Position Event, Date, Place Managing a LIFE project.
© TU Darmstadt-IPG p 1 The CEGRN 2011 Campaign and the densification of ETRF2000 in Central Europe A. Caporali, M. Barlik, M. Becker, L. Gerhatova, G.
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
Matching Grants. Address humanitarian conditions that benefit a community in need Direct Rotarian involvement Match at least two countries (host and international)
WP7 - Architecture and implementation plan Objectives o Integrating the legal, governance and financial plans with technological implementation through.
Ismar Financial and administrative procedures Nearest Kick-off meeting Bologna, 11 October 2006.
Information on the ANNUAL REPORT OCTOBER 18 th, 2006.
Project overview: objectives, work programme & management guidelines FIRST MEETING OF EUROPEAN POLICY CORE GROUP Thursday, 03 March 2005 in Berlin PRESENTATION.
RESISTVIR Work Package 1 (Project Management & Further Development) Mid-Term Meeting 7 th July 2006 Damian Cooper-Smith Chalex Research.
EPOCA – 11. June EPOCAConsortiumOrganisation.
Quality Management (WP5) Roman CHIRCA Agency for Innovation and Technological Transfer TecTNet ………... This project has been funded with support from the.
QRIS Quality Improvement Grants Board of Early Education and Care March 9, 2010.
1 EUDET Status Preparation Annual Meeting Information Annual Report Joachim Mnich Extended Steering Committee Meeting September 11, 2006.
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Kick-off.
Pre-Project Components
Science, research and development European Commission IDARI Project Meeting Tartu, June 2005 Martin Greimel Scientific Officer Directorate-E ‘Biotechnology,
DonQ – Air Project presentation. DonQ-Air – About project Objective: Objective: to encourage R&D activities in the aeronautic-related.
Slide 1 PAO MO75 M. Hugon D:/DATA/POWERPNT/HNML. 0107kickoffconcertedaction ADvanced Options for P&T ADOPT Thematic Network kick-off Meeting.
United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September.
ACTIONS AT NATIONAL LEVEL Proposal on criteria to choose ERFP activities/projects on national (sub-regional) level Elżbieta Martyniuk on behalf of the.
Project preparation workshop “Bringing a transnational project to life” Project idea “Challenges and chances from Climate Change for regional and local.
NSHIELD Project Meeting Brussels - 15 Feb 2012 Luigi Trono.
Ismar Project management issues the non-scientific side of NEAREST Alessandra Borgatti ASTER Nearest Kick-off meeting Bologna, 11 October 2006.
STRUCTURE SCIENTIFIC REPORT / MANAGEMENT REPORT −Progress / objectives (WP and project level) −Progress / milestones (WP and project level) −Progress /
Project Management Birutė Markevičiūtė Joint Technical Secretariat Lead Partner Seminar 13 October 2008, Riga.
Work Package 1: Progress and Focus on specific issues 5th Steering Committee Meeting Rijeka, 26/2/2015 Presented by: Mrs Maria Poulou.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
EGS Nice 2003 G17 Deficits of CEGRN Solutions and Time Series G. Stangl.
Workshop 1 – Implementation of the new CAP Michael Cooper Director – UK Co-ordinating Body 12 September 2012.
Österreichische Akademie der Wissenschaften (ÖAW) / Institut für Weltraumforschung (IWF), 8042 Graz, Austria, Contact:
Mathias DEPRETZ – EuroVO-DCA Project Manager Work Package 1 – Management First Board Meeting – 2&3 october 2006 WP1 Management EuroVO-DCA Project FIRST.
Practical work (simulation) Financial forms Peter Jany.
Presentation of Work Package 6 (WP6) “Design and implementation of Dissemination Activities” MATcHES Kick-off meeting Feb 2014 Ruse, Bulgaria TEMPUS BG-TEMPUS-JPHES.
Review Preparation Meeting of the FP7 Project J-AGE Vienna 25th March 2015.
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
1 FP6 – Financial Management and Reporting 1 April 2006 Sofia, Bulgaria.
ARIES WP2 Task 2.2 kick-off Coordination, support and enhancement of communication/outreach activities for accelerators in Europe Jennifer Toes (CERN),
4th. Plenary Meeting, Edinburgh, May 2010
Baltic Regional Conference, , Riga
SOUTH BALTIC CROSS-BORDER CO-OPERATION PROGRAMME
Chisinau, Republic of Moldova 2017
Dr Sally Priest, Flood Hazard Research Centre
Davor Kozmus, MHEST Steering Platform Meeting 29. October 2009, Zagreb
Matching Grants PP June Jonet
Reporting 25 April 2018.
Financial Control (FC)
Financial and Administrative presentation on PARTICULATES project
WP 1 Management and Coordination
Presentation transcript:

CERGOP-2 Conference, Warsaw, September , 2003 CERGOP-2/Environment A Challenge for the Next 2.5 Years P. Pesec Space Research Institute, Graz, Austria Coordinator

CERGOP-2 Conference, Warsaw, September , st half-year meeting Connected with the yearly CERGOP-2 conference and the meeting of the CERGOP Consortium Maximal EU contribution: € 2, Advance payment received: € that are 40 % as usual. Money distributed: € Money left in Vienna (CO): € Money for Bosnia/H: €

CERGOP-2 Conference, Warsaw, September , st half-year meeting Aim: Getting information about the project progress starting with the kick-off meeting in Graz May 5-6, 2003 What is required: A report for all work-packages not exceeding 2 to 3 pages An estimate of the man-hours consumed by end of September 2003 First ideas to construct an implementation plan which will one of the major output of the complete project

CERGOP-2 Conference, Warsaw, September , st half-year meeting Date for the delivery of the half-year report by the coordinator to Brussels: End of October 2003 So I need all informations by October 15 at the latest. Keep in mind that you have to present a certified financial estimate by end of March 2004 which is the basis for receiving the second partial amount of money Take care of your expenses within the project with utmost care

CERGOP-2 Conference, Warsaw, September , st half-year meeting Some advices how to handle the money received by EU: Please keep inside the sum confirmed by EU. Do not change money between different items without contacting me beforehand. May be we need some certification by EU for larger changes. I remind you that FC is full cost (50% have to be payed by the institute, but you dispose of larger overheads). Additional cost (AC) investigators get the total sum approved.

CERGOP-2 Conference, Warsaw, September , st half-year meeting Durable equipment costs: 1.) ISRSG:depreciated by 2/5 but 50 % (FC) 2.) UBW:depreciated by about 2/5 3.) ASI:no equipment 4.) Padova:no depreciation 5.) CLGBAS:no depreciation 6.) VUGTK:no depreciation but 50 % (FC) 7.) FOMI:no depreciation for GPS, ½ for rest, but 50 % (FC) 8.) PWWUT:no depreciation

CERGOP-2 Conference, Warsaw, September , st half-year meeting Durable equipment costs: 9.) ICGFC:no depreciation 10.) FCESUT:no depreciation 11.) FGG:no depreciation 12.) FGUZ:no equipment 13.) NULP:no depreciation 14.) GDFCE:depreciaton 2/5, assistance from Austria. Complete sum for equipment: €

CERGOP-2 Conference, Warsaw, September , 2003 The Scientific Task Problems to be solved: Maintainance and update of the monitoring network CEGRN Guarantee of long term stability and operation (at least one decade) Moving towards real-time (hourly files, 1-sec sample rate, real-time communication) Establishment of a timely changing velocity field for the complete project area and some dedicated regions Objectives and approach: Creation of new permanent station facilities Precise site monitoring Computation of weekly co- ordinates (time series) Periodic re-measurements of CEGRN and local networks Interpretation of the results (velocity/stress field, geodynamic) Meteorology, hazard mitigation, local assessments

CERGOP-2 Conference, Warsaw, September , 2003 Geographical and Political Aspects All partners except Germany are members of the CEI The territory of the project comprises 15 % of Europe 5 Partners will join the EU 2004, 2 partners hopefully We will try to include further countries during the project EU accepted 3 partners for funding which are not in the list for EU support We took the right time: The planned extension of EU was an important argument for granting the proposal

CERGOP-2 Conference, Warsaw, September , 2003 Work Packages – An Overview The work packages are the basic content of the project. Their success guarantees an optimal termination of the project and the definition of an implementation plan. In order to give each partner a considerable part of responsibility each partner (except Bosnia) is a responsible leader of a work- package. We defined 10 work-packages, work-package 10 is extended to sub-packages 10.1 to The performance of these work packages is supported by the special study groups CSG-1 to CSG-6, which have a nearly congruent task. Half yearly reports as well as regular meetings of CERGOP-2 and/or the consortium will act as a means to adjust the work in the work packages, which are partly highly correlated.

CERGOP-2 Conference, Warsaw, September , 2003 Deliverables The deliverables are arranged in 3 categories: Category 1: “immediately and permanently available” e.g.: information system, raw/met data, station coordinates, zenith delays, RTK corrections, hazard indicators. Category 2: “periodic delivery by date” e.g.: data from epoch stations, station velocities, quality assessments, time series analysis, reference frame, geophysical interpretations, geo-kinematical maps and strain analysis Category 3: “final product delivered once” e.g.:station prototype, tools for site monitoring, models for height determination, long term observation facility

CERGOP-2 Conference, Warsaw, September , 2003 Conclusions That was the first input from the project management point of view I wish all of you great success for this symposium I am here for everybody to discuss open questions which may be easier now but after the next 6 months. Again, good luck