Preparation and Implementation of Nepal Trade Integration Strategy (NTIS 2010) Shiv Raj Bhatt EIF Programme Manager, Nepal Enhanced.

Slides:



Advertisements
Similar presentations
MDG based national development strategies and plans in Africa: the role of the Integrated Package of Services Presentation by BDP/BRSP at RBA Workshop.
Advertisements

Delivering as One UN Albania October 2009 – Kigali.
Enhanced Integrated Framework for Trade-Related Technical Assistance to Least Developed Countries (EIF) IF Programme Implementation Unit (PIU) World Trade.
1 Jacek Cukrowski Economic Development and Poverty Reduction Advisor, UNDP, Europe and the CIS Bratislava Regional Centre Aid for Trade (AfT) Needs Assessment.
PRESENTATION AT THE WORKSHOP ON LDC PRIORITY NEEDS FOR TECHNICAL AND FINANCIAL COOPERATION 29 OCTOBER 2009 GENEVA Sari Laaksonen Coordinator, Integrated.
World Bank and SPS With special emphasis on the recently established multi-donor Standards and Trade Facility Cees de Haan Agriculture and Rural Department,
Aid for Trade and Pacific Development Dr Chakriya Bowman Director, Economic Governance Programme PACIFIC ISLANDS FORUM SECRETARIAT.
Kosovo Donor Coordination
HHA, A N e w W a y o f W o r k i n g T o g e t h e r Status of Preparation of the Conference of Ministers of Health and Finance F. Sergent (AfDB) and B.
URUGUAY’s efforts to address synergies among the Conventions Workshop on synergies and cooperation with other conventions 2-4 July 2003 Espoo, Finland.
Trade Mainstreaming and the Integrated Framework for Trade-Related Technical Assistance to Least Developed Countries (IF) Conference on Small Island States.
High level expert meeting to develop the Near East Regional Action Plan to Implement the Global Strategy to improve Agricultural and Rural Statistics.
MoCS Trade Cooperation Division (WTO Division) National Implementation Unit, Enhanced Integrated Framework (EIF) Ministry of Commerce & Supplies Government.
Development Cooperation Framework DPG Main, 4 th March
Implementation of Capacity Development for CDM Project in Viet Nam Nguyen Khac Hieu Climate Change Coordinator Vietnam National Office for Climate Change.
PRESENTATION AT THE ASIAN EIF REGIONAL WORKSHOP June Kathmandu, Nepal THE ENHANCED INTEGRATED FRAMEWORK PROGRAM.
The Enhanced Integrated Framework Regional AsianWorkshop 2010 Kathmandu June
How and Why DPs Should Support Implementation of NTIS 2010? Chandra Ghimire Joint Secretary Ministry of Commerce & Supplies Presented.
Advancing Nepal’s Trade Agenda T hrough Effective Implementation of NTIS 2010 Chandra Ghimire Joint Secretary, Ministry of Commerce & Supplies
OPTIONS AND REQUIREMENTS FOR ENGAGEMENT OF CIVIL SOCIETY IN GEF PROJECTS AND PROGRAMMES presented by Faizal Parish Regional/Central Focal Point GEF NGO.
EIF National Implementation Arrangements in Nepal Lesson Learned and Prospects Chandra Ghimire Joint Secretary and NIU Chief Ministry of Commerce and Supplies.
GEF Expanded Constituency Workshop 5 to 6 November 2012 New Delhi, India Roles and Responsibilities of Council Members and Focal Points.
Elmostafa AITAMOR Beirut, November 2009
PARIS21 - Meeting of Statistical Capacity Development Donors 27–29 April 2011, Paris, France Pietro Gennari, Statistics Division FAO Developing the Implementation.
Identify the institutions which have a stake in the
Midterm Review of Economic Reform and Diversification Sector 22 – 23 June 2009, Baghdad.
Global Action Plan and its implementation in other regions Meeting for Discussion of the draft Plan for the Implementation of the Global Strategy to Improve.
Project Overview, Objectives, Components and Targeted Outcomes
“Public-Private Health Forum guiding the way forward for partnerships to improve health in Tanzania” Dr. Adeline Kimambo Co-Chair PPHF Executive Board.
Commodity Development Strategies in the Integrated Framework A quick presentation of work done by CSEND in cooperation with UNDP Global Commodity Forum.
Egyptian Environmental Affairs Agency National Capacity Self Assessment (GEF/UNDP) The Third GEF Assembly Side Event – 30 th August,2006 Cape town Integrating.
World Meteorological Organization Working together in weather, climate and water EC-WGCD 1 - Dec 2011 Regional Programme and South-South Cooperation WMOwww.wmo.int.
Joanna Fiedler Enlargement and Neighbouring Countries Unit DG Environment European Commission REReP → RENA Vision of the European Commission PEIP Regional.
Country Presentation- GEF Operational Focal Point, Sri Lanka GEF Sub-Regional Workshop 2-3 December 2007, Bali, Indonesia Anura Jayatilake Director, Environmental.
EIF- Regional Asian Workshop June 2010, Kathamandu, Nepal Maldives expereince.
February 21, JAS Consultation between the Government of Tanzania and Development Partners February 21, 2006 Courtyard Hotel, Dar es Salaam.
Shiv Raj Bhatt ENTReC/UNDP Ministry of Commerce and Supplies EIF Asian Regional Workshop Kathmandu, June, 2010 Nepal’s Experience with the NTIS:
INTEGRATED FRAMEWORK Leendert Solleveld International Trade Department The World Bank.
Africa Health Workforce Platform & Observatory Presentation to the 1st conference of the Asia-Pacific Action Alliance on HRH (AAAH): October 2006.
EXPLAINING THE EIF PROGRAMME AND STATUS OF PROGRAMME IMPLEMENTATION IN ZAMBIA Presentation to the EU Technical Officials Accredited to Zambia May 21, 2014.
Regional Policy EU Cohesion Policy 2014 – 2020 Proposals from the European Commission.
FOURTH CABINET RETREAT 20 – 21 DECEMBER 2011 PRESENTATION BY MOTIE.
Presentation to the Portfolio Committee on Public Service and Administration 14 September Human Resource Development Council for South Africa (HRDCSA)
Nepal’s Experiences on Implementation of the Integrated Framework (IF) & Enhanced Integrated Framework (EIF) Jib Raj Koirala Under Secretary, Ministry.
Trade SWAp : The “Integrating” Framework (When can a SWAp do to increase mainstreaming and coordination) EIF Regional Asian Workshop Kathmandu, June 20.
Sub-regional Workshop for GEF Focal Points Nairobi, Kenya May 2007.
Dodoma, June Plan of the presentation  Finding of the PER Workshop in Washington D.C.  What to change?  Five proposals to improve the process.
Pre-DTIS and DTIS Good Practices. Pre-DTIS project DTIS template Good practice DTIS.
NSDS DESIGN PROCESS: ROAD MAPS & OTHER PRELIMINARIES Prof. Ben Kiregyera NSDS Workshop, Addis Ababa, Ethiopia 9 August 2005.
DEVELOPMENT COOPERATION FRAMEWORK Presentation by Ministry of Finance 10 December 2013.
UNDP Engagement in Trade and Development: An Update Presentation to the Strategic Management Team (SMT) 3 October 2005 Bureau for Development Policy.
Vito Cistulli - FAO -1 Damascus, 2 July 2008 FAO Assistance to Member Countries and the Changing Aid Environment.
INTERACTIVE TRAINING ON IDP FOR COUNCILLORS ________________________
Observatories for the Health Workforce in Africa VIII REGIONAL MEETING OF THE OBSERVATORIES OF HUMAN RESOURCES FOR HEALTH IN THE AMERICAS LIMA, PERU
MR. BOUNSOM PHOMMAVIHANE DIRECTOR GENERAL FOREIGN TRADE POLICY DEPARTMENT MINISTRY OF INDUSTRY AND COMMERCE, LAO PDR Lao PDR and the Integrated Framework.
Aid for Trade Progress on the Initiative in 2007 and Report on the Mandate to ECA Stephen N. Karingi Chief, Trade and International Negotiations Section,
REPORT OF EVALUATION FUNCTION & ORGANIZATION OF CORE TEAM TO THE 2 nd HIGH VALUE SILK STEERING COMMITTEE MINISTRY OF COMMERCE Mr. SUON Prasith, EIF Program.
Joint Assistance Strategy for Tanzania (JAST) Poverty Policy Week Creative and Hard Work, the Key to Fighting Poverty Presentation by the Ministry of Finance.
Public health, innovation and intellectual property 1 |1 | The Global Strategy on Public Health, Innovation and Intellectual Property Technical Briefing.
27/04/2017 Strengthening of the Monitoring and Evaluation system for FTPP/FTTP in FAO /SEC December 2015 FTPP/FTFP Workshop, Bishkek, Kyrgyzstan.
Global Partnership for Enhanced Social Accountability (GPESA) December 19, 2011 World Bank.
Cambodia Export Diversification and Expansion Program (CEDEP) I By: Sylvie Bétemps Cochin, Trade Promotion Officer, ITC Date:13 December 2012 Overview.
1 Jacek Cukrowski Economic Development and Poverty Reduction Advisor, UNDP, Europe and the CIS Bratislava Regional Centre Aid for Trade (AfT) Needs Assessment.
PUENTE IN THE CARIBBEAN PROGRAMME PHASE 2: Internship on Social Protection Strategies. October 26 November 3, 2009 Santiago, Chile. Presentation: Progress.
MR. PHOUVIENG PHONGSA NIU DIRECTOR NATIONAL IMPLEMENTATION UNIT FTPD, MINISTRY OF INDUSTRY AND COMMERCE LAO PDR Trade Mainstreaming in Lao PDR.
GJP, CB and SJD Turin September 6, Global Jobs Pact ( June 2009 ) The Global Jobs Pact was adopted by the 2009 International Labour Conference following.
African Centre for Statistics United Nations Economic Commission for Africa Session 2 How to meeting countries needs: What has been done and way forward.
Activity of the High-Level Group for Partnership, Coordination and Capacity Building for Statistics for Agenda 2030 on Sustainable Development (HLG) Gulmira.
Ministry of Industry and Commerce
UN Support to SDG implementation in Seychelles.
Presentation transcript:

Preparation and Implementation of Nepal Trade Integration Strategy (NTIS 2010) Shiv Raj Bhatt EIF Programme Manager, Nepal Enhanced Capacities for Trade and Development (NECTRADE) Ministry of Commerce and Supplies Government of Nepal Presented at experience sharing program with the High Level Delegation from Bangladesh Kathmandu, Nepal (30 June 2011)

Objectives: Information and experience sharing between Nepal and Bangladesh on trade and development through mobilization of Aid for Trade, particularly Enhanced Integrated Framework (EIF). Contents: –Background (EIF and Nepal) –NTIS and status of its implementation –Next steps (the way forwards)

Background The EIF (previously IF) was set up in 1997 at the WTO. The EIF is a multi-donor program, which supports LDCs to be more active players in the global trading system by helping them tackle supply-side constraints to trade. The EIF is currently helping 47 LDCs worldwide, supported by a multi-donor trust fund, with contributions from 22 donors. Aim: The EIF is working in close cooperation with donors, six core partner agencies, observer agencies, the Executive Secretariat (ES) and the Trust Fund Manager (TFM) and other development partners who are supporting LDCs' own drive to: –mainstream trade into national development strategies; –set up structures needed to coordinate the delivery of trade- related technical assistance; and –build capacity to trade, which also includes addressing critical supply-side constraints. –The EIF process aims to strengthen donors' support to a country's trade agenda.

Institutions and Instruments to Implement EIF/Mobilize AfT 2007: the IF Working Group (IFWG) and the IF Steering Committee (IFSC) adopted a package of recommendations to implement the Enhanced IF (EIF). Institutions: a guideline has been prepared for implementation of EIF and as prescribed in it, an institutional set-up (at country level) is needed for implementation of EIF. –At Global Level: EIF Board; EIF Secretariat at WTO Geneva, led by the Executive Director and United Nations Office for Project Services (UNOPS) as EIF TFM –National Level: National Steering Committee (NSC); Focal Point (FP); National Implementation Unit (NIU); Donor Facilitator; and any other committees/task force/working groups etc., as needed and decided by the respective government. Instruments: Diagnostic Trade Integration Study (DTIS).

EIF and Nepal: Stock taking of DTIS 2004 Nepal submitted a proposal under revamped IF and received support under IF (Window I and Window II) during 2003/04. Prepared Diagnostic Trade Integration Study 2003/04 (Nepal Trade and Competitiveness Study 2004). To implement recommendations (Action Matrix) of DTIS 2004, Nepal Window II Trade Related Capacity Building Project was implemented in –Only a few recommended actions of DTIS 2004 were completed/conducted under the project (duration of the project was very short –one year, and limited resources – less than one million). –Major activities recommended by DTIS 2004 were left because of the limited resources and time available. ‘Enhancing Nepal’s Trade Related Capacity Project’ was designed and implemented ( ) to follow the DTIS 2004 and update it as per the changed context.

Stock taking of DTIS 2004 (Problems) Limited resources from IF trust fund to implement actions recommended under DTIS Weak co-ordination and lack of capacity (intergovernmental, government-private sector and government-donors) to implement the reform measures. Inadequate response by local donors. Ambiguity of ownership for implementation of DTIS 2004 itself (no implementation arrangement, responsible agencies not specified clearly, budgetary requirements are not in place, etc.). No proper implementation mechanism at place.

Overcoming problems A. Instrument/Strategy: NTIS 2010 (updated DTIS) was launched in June B. Institution/Implementation Mechanism To provide overall guidance and strategic direction, the GoN has constituted EIF National Steering Committee (NSC) - Chaired by the Chief Secretary of the GoN. Secretaries and officials of the GoN and business representatives are the members of NSC. The GoN has appointed the Secretary, Commerce & Supplies as EIF Focal Point (FP). In order to facilitate EIF process and establish an effective coordination between GoN and the donors, NIU was established at MoCS (headed by the Joint Secretary). Donor facilitator is selected (UNDP till November 2010 and Germany thereafter).

The Road Map to EIF/NTIS (June onwards) Work in Progress: Implementation of NTIS 2010 Implementation of EIF Tier1 Trade mainstreaming actions Renewing DPs Commitment Move towards Trade SWAp Development & implementation of Tier 2 Projects in line with NTIS 2010 DONE (till June 2010) : Constituted a Transition Team to formulate NTIS NTIS formulated and launched. Concept note on implementation mechanism Capacity Building Plan EIF Tier 1 approved NTIS endorsed by the Council of Minister Trade as a priority area in NDP. Formulate – Own – Implement – Communicate - Monitor

I. Identify NTIS Focus and Prepare NTIS Work February-September 2009: –Formulated a Transition Team –Drafted NTIS Table of Content and organized a seminar/WS with Government, Business, and Development Partners to discuss and endorse proposed Table of Content. –Drafted Chapters ToRs –Identified/Recruitment of Team Leader and chapter teams (mostly mixed national-international) –Worked with Donor Facilitator (UNDP) to secure additional funding from other DPs (DFID, Gov’t of Finland, IFC) Preparation of NTIS

Preparation of NTIS…….Contd. II. Conduct NTIS Work (Sept 2009-May 2010) Full report containing 12 chapters. Each chapter team presented initial findings to relevant EIF Technical Committee for feedback. 3 review workshops organized with GoN, Business, DPs (September 2009, November 2009, March 2010). Separate focus group discussion were organized for some chapters (e.g. investment facilitation, SPS and TBT, Trade support institutions).

Preparation of NTIS….contd. Prepared Action Matrix & Executive Summary (April-June 2010) Drafted ES+AM and Main Report (Background Report). Draft NTIS 2010 sent to GoN concerned Ministries and Departments, private sector organizations and to DPs for comments. Incorporated comments/suggestions of agencies/individuals NTIS 2010 launched 24 June

National trade strategy to enhance 'supply side capacity' for Nepal's space in global market; Prioritized strategy launched by PM himself. An outcome of analysis & consultation with broad range of stakeholders, but led by the GoN. What is NTIS?

19 goods & services identified as priority items; Plus 5 other goods suggested; 10 potential destination markets identified; 3-5 years period for implementation; Engaging of multiple agencies, i.e., GoN's 17 ministries/agencies as well as business organizations. Salient Features of NTIS 2010

NTIS Priority Export Sectors

Having 4 strategies:  Strengthening trade negotiation capacity (Market Access)  Strengthening NTB related domestic capacity (Overall Supply Capacity…….trade facilitation/Product standards/quality/etc.)  Strengthening supply capacity of "inclusive exports" (Supply Capacity of priority export sectors)  Strengthening capacity to manage AfT/TRTAs (Resource mobilization) Having 87 cross cutting actions and 171 product/service specific & total 268 actions to be implemented Salient Features of NTIS 2010

Coordination with the Stakeholders GoN Buy-in:  Meetings with National Planning Commission to ensure alignment of NTIS proposed priorities with 3-year National Development Plan (NDP) priorities  Endorsement of NTIS 2010 by Council of Ministers DPs Buy-in:  MoCS intensifies discussions with interested DPs to identify possible ODA support for implementation of NTIS 2010  MoCS officials meets with concerned DPs individually and in groups several time.

Coordination with the Stakeholders Business Sector Buy-in:  From the start of NTIS process, business sector is co- organizer of NTIS seminars/workshops.  Business sector closely associated with work of the chapters teams, especially with the export potential assessment of the 19 sectors selected for priority focus.  Export Promotion Forum (EPF) created at FNCCI was engaged in NTIS preparation through creation of a public-private dialogue form (PPDF-Nepal) by MoCS.

Implementation Status Endorsement of NTIS 2010 by Council of Ministers. Trade is one of the six strategies of current three year plan. Mainstreaming of trade in sectoral plans (e.g. Industry and Agriculture) To intensify the mainstreaming process, senior officials of concerned ministries are being re-orientated Budget allocated for NTIS implementation in current FY budget. Tier 1 project implemented to support NIA in trade mainstreaming actions and AfT mobilization. TORs for NIU/Extended NIUs prepared and govt officials and experts appointed for NIU/Extended NIUs.

Implementation Status Development of project proposals (Tier 2) underway. Consultation workshops/meetings held with concerned stakeholders. Advocacy for trade development and mainstreaming Training for journalist and grassroots entrepreneurs. Donor Group was established with the support of DF and 3 DG meetings were held so far. Efforts for mainstreaming of trade in DPs' country strategies. Mobilizing AfT/TRTA  EIF Tier 1 (NECTRADE)  USAID/NEAT  GIZ/2 projects on Bio-Trade and WTO Implementation Support  EC-WTO Project  Consultation with other DPs (WB, ADB, DFID, Finland, Swiss, etc.)

Work Ahead I.Identify implementation mechanism (move towards Trade SWAp or other better options) II.Develop tools to monitor the progress (periodic/annual…..) III.Renew DPs Commitments IV.Involve stakeholders more deeply in the process V.Further mainstreaming of trade in national as well as sector development strategies

Conclusion The DTIS process is not simply about a Ministry preparing a trade sector development strategy with the support from a team of consultants. It is about creating buy-in from all key stakeholders (Concerned Ministries, business community, DPs and others) so that everyone can participate in its implementation without any hesitation. The process takes time, but is the key for success.

THANKS