FAA GNSS Evolutionary Architecture Study

Slides:



Advertisements
Similar presentations
Agenda Item 6 GNSS Operations Ross Bowie, NAV CANADA Rapporteur, Operational WG Navigation Systems Panel Thank you… Good morning… I am ... and member.
Advertisements

Agenda Item 6 GNSS Development Status and Future Work Eric Chatre, EC/ESA Rapporteur Technical WG, GNSS Panel Thank you… Good morning… I am ... and.
International Civil Aviation Organization
International Civil Aviation Organization
GROUND BASED AUGMENTATION SYSTEM System Overview Christophe DEHAYNAIN Direction Générale de l’Aviation Civile FRANCE.
International Civil Aviation Organization
Global Navigation Satellite Systems (GNSS) for Aviation United Nations International Committee on GNSS December, 2005 Ken Alexander United States.
METIS First Master Training & Seminar
FAA’s Plan for the Future Use of GPS Briefed By: Kanwaljit S. Sandhoo (MITRE/CAASD) 8th European CGSIC/IISC Meeting, Prague December 2-3, 1999.
© 2013 The MITRE Corporation. All rights reserved. Tim Cashin, Dmitri Baraban, Roland Lejeune SBAS IWG #24 Meeting CNES, Toulouse, France January.
1 CAR/SAM ATN GNSS SEMINAR VARADERO, CUBA May 8, 2002 Barry Billmann Federal Aviation Administration Presentation GNSS 3.2.
GALILEO INTERIM SUPPORT STRUCTURE EUROPEAN COMMISSION International Civil Aviation Organization GALILEO CAR/SAM ATN/GNSS Seminar Varadero, Cuba, 6 to 9.
GAO Report on GPS “Significant Challenges in Sustaining and Upgrading Widely Used Capabilities” Presented on 30 April 2009 to Subcommittee on National.
Aviation Benefits of GNSS Augmentation Workshop on "GNSS Applications for Human Benefit and Development“ Prague, Czech Republic September 2010 Jeffrey.
Federal Aviation Administration Next Generation Air Transportation System (NextGen) Briefing to COMSTAC Kelvin Coleman May 16, 2008.
Absolute Receiver Autonomous Integrity Monitoring (ARAIM)
Wide Area Augmentation System (WAAS) E. Douglas Aguilar CAPT, USAF.
Introduction to GAGAN & GAGAN Enabled Receiver
有朋自远方来,不亦乐乎 ! “How happy we are, to meet friends from afar!” - Confucius Welcome to Stanford!
Presented to: MPAR Working Group By: William Benner, Weather Processors Team Manager (AJP-1820), FAA Technical Center Date: 19 March 2007 Federal Aviation.
ATN/GNSS Seminar Varadero, Cuba 6 to 9 May 2002 Overview of GNSS Presentation GNSS 1.1 by V. Iatsouk, GNSS Panel Secretary ANB/ICAO.
Know the Earth…Show the Way NATIONAL GEOSPATIAL-INTELLIGENCE AGENCY Approved for Public Release NGA Case # NGA’s Role in GPS Barbara Wiley.
Alternative Positioning, Navigation, and Timing Initiative
Federal Aviation Administration GPS Augmentation Systems Status Leo Eldredge, GNSS Group Federal Aviation Administration (FAA) September 2009.
Satellite-Based Augmentation Systems (SBAS) Combined Performance
Aviation Considerations for Multi-Constellation GNSS Leo Eldredge, GNSS Group Federal Aviation Administration (FAA) December 2008 Federal Aviation Administration.
How Global Positioning Devices (GPS) work
Aviation Benefits of GNSS Augmentation Workshop on the Applications of GNSS Chisinau, Moldova May 2010 Jeffrey Auerbach Advisor on GNSS Affairs Office.
Signal Deformation Proposal R. Eric Phelts, Gabriel Wong, Todd Walter, Per Enge Stanford University IWG 26 February 5-7, 2014.
© 2013 The MITRE Corporation. All rights reserved. SBAS IWG #25 Meeting St Petersburg, Russia June 2013 Roland Lejeune RTCA SC-159 Working Group.
ENC-GNSS 2006 – Manchester, UK Civil GPS Interface Committee International Sub-Committee May 7, 2006 John E. Augustine Acting Director, Office of Navigation.
Copyright © 2011 Raytheon Company. All rights reserved. Customer Success Is Our Mission is a registered trademark of Raytheon Company. Satellite Based.
GLONASS Government Policy, Status and Modernization
Extending GPS and Galileo interoperability: from frequency/signals to integrity Francisco Salabert Head of GNSS Policy Office DDAS/ EUROCONTROL.
Introduction Dual Frequency SBAS = The solution for Ionosphere:
Presented to: PNT Advisory Board By: JC Johns, Director Navigation Services Date: May 14, 2009 Federal Aviation Administration GNSS Program Status WAAS,
Satellite Operation s Satellite Operation s TeleComm Oil Exploration Trucking & Shipping Surveying & Mapping Precision Agriculture GPS enables a diverse.
Presented to: SBAS Technical Interoperability Working Group Date: 21 June 2005 Federal Aviation Administration Certification of the Wide Area Augmentation.
Presented to: By: Date: Federal Aviation Administration FAA GNSS Program Plans and Status Institute of Navigation NTM Leo Eldredge, FAA GNSS Group January.
Page 1 SQM: SBAS Workshop ZETA ASSOCIATES 21 June 2005.
October 5, 2007 By: Richard L. Day, Vice President En Route and Oceanic Services (ATO-E) Federal Aviation Administration Surveillance and Broadcast Services.
Federal Aviation Administration FAA Global Navigation Satellite System (GNSS) Program Plans and Status GPS/WAAS/LAAS Leo Eldredge, GNSS Program Manager.
10/7/ Innovative Solutions International Satellite Navigation Division ION NTM 01 Capabilities of the WAAS and EGNOS For Time Transfer SBAS, an Alternate.
Satellite Navigation Program Federal Aviation Administration.
Miroslava Trojanovičová.  The European Geostationary Navigation Overlay Service  The official start of operations- on 1 October 2009  3 satellites-
U.S. Space-Based Positioning, Navigation, and Timing Policy and Program Update Briefing to the International Committee on Global Navigation Satellite Systems.
Wide Area Augmentation System Dan Hanlon WAAS Program Manager April 2, 2003.
Presented to: IWG 26 By: Jason Burns (FAA) Date: February 5-7, 2014 Federal Aviation Administration DFMC Work Plan Update.
Federal Aviation Administration 0 GPS, WAAS, GBAS Overview March 8, GPS Integrity RAIM, WAAS, and GBAS: Concepts and Status Federal Aviation Administration.
Present and Future of China Satellite-Based Augmentation System China Satellite Navigation Office February 2014.
June 2013 Global SBAS Status Satellite Based Augmentation System (SBAS) Interoperability Working Group (IWG) June 2013.
The Wide Area Augmentation System (WAAS) Todd Walter Stanford University Todd Walter Stanford University
Federal Aviation Administration FAA Global Navigation Satellite System (GNSS) Program Plans and Status GPS/WAAS/LAAS Leo Eldredge, GNSS Program Manager.
Global SBAS Status Satellite Based Augmentation System (SBAS) Interoperability Working Group (IWG) November 2013.
Flight Planning and Navigation GPS Navigation © 2011 Project Lead The Way, Inc.Aerospace Engineering.
Space-Based Navigation Systems
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 1 FAA Satellite Navigation Program Update Dan Salvano.
Satellite Navigation Program
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 1 Wide Area Augmentation System (WAAS) Dan Hanlon.
Munich SATNAV, Munich Satellite Navigation Summit February 21-23, 2006 Michael E. Shaw Director, U.S. National Space-Based PNT Coordination Office.
GPS Status and Modernization Munich Satellite Navigation Summit Munich, Germany 3 March 2009 Colonel David Buckman, US Air Force PNT Command Lead Air Force.
19-21 February 2008 Michael Shaw, Director U.S. National Coordination Office for Space-Based Positioning, Navigation, and Timing (PNT) GPS-Galileo Progress.
GPS Modernization & WAAS
Agenda Item 6 GNSS Development Status and Future Work Eric Chatre, EC/ESA Rapporteur Technical WG, GNSS Panel Thank you… Good morning… I am ... and.
Agenda Item 6 GNSS Operations Ross Bowie, NAV CANADA Rapporteur, Operational WG Navigation Systems Panel Thank you… Good morning… I am ... and member.
CAR/SAM ATN GNSS SEMINAR VARADERO, CUBA May 8, 2002
EUROPEAN COMMISSION Satellite-Based Augmentation Systems (SBAS) Combined Performance International Committee on GNSS (ICG-4) Working Group A Saint Petersburg,
Todd Walter Stanford University
Augmentation Service from the Zenith
International Civil Aviation Organization
Presentation transcript:

FAA GNSS Evolutionary Architecture Study PNT Advisory Board Leo Eldredge, FAA GNSS Group March 27, 2008

FAA Satellite Navigation Vision

WAAS Architecture 38 Reference Stations 3 Master Stations 4 Ground Earth Stations 2 Geostationary Satellite Links 2 Operational Control Centers

WAAS LPV Coverage - Current 2008 -

WAAS RNP Coverage - Current -

WAAS Enterprise Schedule FLP Segment (Phase II) LPV-200 Segment (Phase III) Dual Frequency (Phase IV) GEO #2 - Inmarsat GEO #3 – Intelsat GEO #4 – TeleSat GEO #5 – TBD GEO #6 – TBD Approach Development 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 FY Development Operational FOC Technical Refresh Operational JRC Technical Refresh Operational JRC Lease Extension 9/06 Launch 10/05 Operational Operational Launch 9/05 Operational Launch 7/12 Operational Launch 7/15 ~6,000 WAAS Procedure Development

Future Considerations GNSS Modernization GPS Dual Frequency (L1/L5) Service Provides Foundation Potential for Larger GNSS or Use of Multiple GNSS Constellations User Equipment Standards Development for New Signals WAAS Dual Frequency Upgrade Determine Appropriate Level of Dual Frequency Integration Required to Maximize Benefit With Minimum Impact Established GNSS Evolutionary Architecture Study (GEAS) to Investigate Long Range Planning for Dual Frequency GPS Develop Architectural Alternatives to Provide Worldwide LPV-200 Service in the ~2020-2030 Timeframe Leverage Lessons Learned on WAAS/LAAS to Identify the Best Architecture Alternative to Meet Aviation Integrity Requirements Participation With The GPS Wing, DoD National Security Space Office (NSSO), DOT Research & Innovative Technology Administration (RITA), and the Joint Planning & Development Office (JPDO) for NextGen

GEAS Panel Deane Bunce (Co-Chair) FAA ATO-W Per Enge (Co-Chair) Stanford University Leo Eldredge Deborah Lawrence Calvin Miles Kevin Bridges FAA AVS Hamza Abduselam Tom McHugh FAA ATO-P Bill Wanner David Schoonenberg NSSO Mike David Karen Van Dyke RITA/Volpe Ed Sigler GPS TAC Tim Murphy Boeing Aircraft Geoff Harris G-Wing/Aerospace Karl Shallberg GREI Boris Pervan IIT John Dobyne G-WIng/ARINC Karl Kovach Eric Atschuler Sequoia Research Chris Hegarty MITRE Young Lee JP Fernow Frank Van Graas Ohio University Juan Blanch Stanford University Todd Walter Pat Reddan Zeta Associates AJ Van Dierendonck

Determination of Integrity Aircraft Based Integrity is determined on board the aircraft using redundant ranging sources or sensors e .g. RAIM, AIME, … Ground Based Integrity determined external to User e.g. SBAS, GBAS, GRAS, GNSS Monitoring, … Satellite Based Determination of integrity is made on board the satellite using redundant components e.g. Clock Monitoring (TKS), Signal Deformation Monitoring (SDM)

Layered Approach Ultimate integrity architecture will combine threat detection at all elements Satellite Best time to alarm (TTA) for rapid clock & digital errors Ground Necessary for absolute accuracy Aircraft offers Direct integrity monitoring by user Mitigating ionosphere delays and local errors Alternatives trade the degree of aircraft based augmentation (ABAS), constellation geometric robustness, user range accuracy, and augmentation Need to find best trade for cost, TTA, integrity performance and constellation dependency

GNSS integrity Channel (GIC) Key Feature: Integrity Determination External to the User Key Enabler Rapid Messaging Rate TTA of 6.2 Sec Key Benefit Redundant Ranging Signals Not Required Key Challenge Meeting TTA User Avionics No RAIM/FDE Required – WAAS/SBAS extension Dual Frequency (L1/L5) – Ionosphere Delay Estimation Ground Segment Monitor Network Externally Monitor and Detect All SV Faults That Affect the User Requires Monitoring Network Capable of Continuous Monitoring of All GNSS Satellites From At Least Two Locations Network Latency to Support Time to Alarm of 6 Seconds Signal-In-Space Corrections & Integrity Messages Data Rate Comparable to SBAS Broadcast of 250 bps Broadcast Via GEOs Or Other Suitable Means Space Segment Nominal 24 SV Commitment is Included in the SPS PS

Time-To-Alert (TTA) A significant challenge with a worldwide system (i.e., Galileo or GPS-IIIC integrity) is meeting the 6.2 second TTA requirement WAAS is just able to meet TTA with its North American network A different approach is required for worldwide system Allocate the TTA requirement to the aircraft or satellite fault detection

Relative RAIM: Range Rate Residuals Key Feature: Real-Time Integrity Determination By User Using Carrier Phase Approach Key Enabler External Monitoring Redundant Geometry Key Benefit TTA Latency Relaxed to Minutes Propagate the most recent monitored position with carrier phase only DHPL DVPL Most recent monitored position with corresponding horizontal protection level (HPL) and vertical protection level (VPL) User Avionics Integrity/Correction Messages Provide Starting Point Dual Frequency (L1/L5) – Ionosphere Delay Estimation RRAIM Algorithms Check Residuals Between Carrier Phase Measurements and Estimated Change in Position Ground Segment Monitor Network Requires Monitoring Network Capable of Continuous Monitoring of All GPS Satellites From At Least Two Locations Time to Alarm of Up to 10 Minutes is Tolerable Signal-In-Space Broadcast RRAIM Coasting Enables Slow Integrity/Correction Messages Suitable for SBAS GEOs, Possibly GNSS Messages or Other Low Data Rate Alternatives Space Segment Viable for Constellation of 27 or More (note 24 SV Commitment is Included in the SPS PS) Growth in HPL and VPL due to RAIM on the carrier phase-based delta position updates From Prof. van Graas, Ohio University

Absolute RAIM Key Feature: Key Enabler: Key Benefit Real-Time Integrity Determination by the User (ABAS) Key Enabler: Redundant Ranging Sources 30 or More SVs Key Benefit Latency Relaxed to Hours Similar to today’s RAIM, both use smoothed pseudoranges, absolute position fixes, and geometric redundancy However, ARAIM requires tighter confidences, improved algorithms, and stronger constellations to provide horizontal and vertical guidance Constellation requirement much more strict than today’s RAIM Avionics Receiver Autonomous Integrity Monitoring as the Primary Integrity Solution Dual Frequency (L1/L5) – Ionosphere Delay Estimation Ground Segment Monitor Network Continuous Monitoring of All GPS Satellites From At Least Two Locations Update error variance and mean for each Satellite Time to alarm of 1 or more hours is tolerable Signal-In-Space Reliability Estimates (a Priori Probability) for Each SV Broadcast Via GNSS or GEO Messages Space Segment Requires 30 or More GNSS SVs (note 24 SV Commitment is Included in the SPS PS)

Preliminary Results Constellation Architecture 24 minus 1 24 27 30 minus 1 30 GIC 86.6% 100% 97.8% RRAIM with 30 s coasting 81.2% 99.4% 96.8% 60 s coasting 74.4% 98.5% 92.8% RRAIM with 300 s coasting 28.0% 76.1% 52.3% 99.6% 93.9% ARAIM 7.80% 44.7% 30.6% 94.1% 90.5% Note: Predictions Valid for WAAS-Like Integrity Assured URA’s of 1 Meter or Less

GEAS Next Steps Phase 1 Report – Completed Future Work Plan Ready for Distribution Future Work Plan WAAS RRAIM Architecture Detailed Analysis and Design Leading to Implementation of the RRAIM Architecture as the Dual Frequency Architecture for WAAS Support to GPS-III/OCX Integrity & Continuity Assurance Activities Provide Assistance to GPS Wing Program Office Team

Questions http://gps.faa.gov