ETHICBOTS Emerging Technoethics of Human Interaction with Communication, Bionic, and robotic Systems WP1 – Project coordination and management Guglielmo.

Slides:



Advertisements
Similar presentations
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP1. Project Management.
Advertisements

European Commission DG for Fisheries and Maritime Affairs Research & scientific analysis SSP Kick-off meeting The 6 th Framework Programme
Management Structure and Responsibilities SUST-RUS
This project is funded with support from the European Commission " Legal disclaimer: the contents of this material is the sole responsibility of implementing.
GENIUS T4 - September 2014 GENIUS T4 Teleconference X. Luri.
KM3NeT, , Pylos © FIM-NewLearning 2007 KM3NeT Management & Reporting Dr. Roland Klein Project Office KM3NeT
Helsinki Sept 2007 S.Galés ERA-NET Supporting Cooperation for research infrastructures in all S&T fields 7 th FP Call Capacity Work Program: Infrastructures.
Funded by:. Thank you all! For your inputs in the first both contents and financial annual reporting, which has now been accepted Note that all reports.
Development of an Operational Plan for Environmental Protection from Industrial Dusts in Russia and other NIS (ENPRODUS) Managerial Issues.
CLARIS NCT1 Management, coordination and dissemination activities J-P Boulanger (CNRS) and Carlos Ereño (UBA) (CNRS, CONICET, UBA, UR) k To manage the.
C-LIEGE Contract N°: IEE/10/154/SI Project duration: from 1 st June 2011 to 30 st November 2013 Date of creation: 4 th July 2011 Clean Last mile.
ETHICBOTS Emerging Technoethics of Human Interaction with Communication, Bionic, and robotic Systems ETHICBOTS Kick-off Internal Meeting Guglielmo Tamburrini.
STRUCTURE SCIENTIFIC REPORT / MANAGEMENT REPORT Progress / objectives (WP and project level) Progress / milestones (WP and project level) Progress / deliverables.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR EU Design Study 4th Annual Report meeting February 12, 2009 J. Eschke,
Research Infrastructures Seminar for I3 and CA Project Co-ordinators 12 November 2004, 1 Management and Implementation of I3 and CA Contracts Seminar for.
Marina Signore e- Frame Project Coordinator Division "Metadata, Quality and R&D Projects", Chief Istat e-Frame “European Framework for Measuring Progress.
2 nd Steering Committee Meeting October 2008, Athens and Aegina.
1 Framework Programme 7 Guide for Applicants
The Preparatory Phase Proposal a first draft to be discussed.
WP-D Dissemination WP-D Dissemination Kick-off meeting Paris, May 2006 Mike O’Mahony UEssex.
NORWEGIAN SOCIAL SCIENCE DATA SERVICES MADIERA Project Management.
Coordinating EC Research Projects Paul Drath Singleimage Limited 3 Foundry Walk St Ives Cambs PE27 5FW phone fax
European Commission DG for Fisheries and maritime affairs Research & scientific analysis 1 The 6th Framework Programme Project UNCOVER Kick-off.
Annual reports Final report Dr. Cecilia Blasetti Elettra - Sincrotrone Trieste v.
Reporting Guidelines (FP5) Karen Fabbri Scientific Officer Natural & Technological Hazards DG Research European Commission Brussels
Technology Strategy Board Driving Innovation Participation in Framework Programme 7 Octavio Pernas, UK NCP for Health (Industry) 11 th April 2012.
EPOCA – 11. June EPOCAConsortiumOrganisation.
Quality Management (WP5) Roman CHIRCA Agency for Innovation and Technological Transfer TecTNet ………... This project has been funded with support from the.
Megan Richards RTD FP6 Kick Off Meeting Priority 7 and 8 11 November 2004 Sixth Framework Programme MANAGING FP6 CONTRACTS.
Dunstaffnage Marine Laboratory Oban, Argyll, Scotland PA37 1QA ECASA Kick-off Oban 8-9, December 2004.
AIDA negotiation process AIDA NCP Meeting,
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
Initial plans for WP 2 KickOff Meeting ICT-AGRI 2 Jan Erpenbach, Elke Saggau.
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Kick-off.
SEERA-EI project kick-off meeting, Athens, 9-10 April 2009 SEERA-EI WP5 – Dissemination and liaison with pan-European initiatives Athens,
Genova 3-4/11/2011 DoCuP Presentation 1 Dissemination In order to assure the best information on the activities and the best dissemination of the results.
Consortium building PHOENIX Training Course Laulasmaa, Estonia
EUROSAI Professional Standards – Goal Team 2 Brief introduction Cristina Breden Mária Kysucká Vilnius, September 2012.
CARBOOCEAN Annual meeting, December 2007 Finance and administration by Hege D. Høiland SIXTH FRAMEWORK PROGRAMME PRIORITY “Global Change.
NSHIELD Project Meeting Brussels - 15 Feb 2012 Luigi Trono.
Project Procedures Start up Governance Internal Communications – Lists – documents Meeting Schedule Deliverables Cost statements.
S 1 Annual Meeting 2013 Management and reporting (WP6) Chiara Bearzotti NACLIM project manager.
Ismar Project management issues the non-scientific side of NEAREST Alessandra Borgatti ASTER Nearest Kick-off meeting Bologna, 11 October 2006.
FROM GAPS TO CAPS Risk Management Capability Based on Gaps Identification in the BSR Project Lead Partner: Fire and Rescue Department under the Ministry.
STRUCTURE SCIENTIFIC REPORT / MANAGEMENT REPORT −Progress / objectives (WP and project level) −Progress / milestones (WP and project level) −Progress /
DESCRIPTION OF THE MONITORING AND EVALUATION SYSTEM IN POLAND Action Plan and the Two-year NRN Operational Plans.
Financial Guidelines FP6 – IST Directorate C 1 st Evaluation proposals co-ordinators Briefing 17 July 2003.
WP1- Management EuroVO-DCA 1 st PCT Meeting – 3&4 May 2007 Mathias DEPRETZ – EuroVO-DCA Project Manager 1 st PCT meeting 3&4 May 2007 Strasbourg EuroVO.
Negotiation of Proposals Dr. Evangelos Ouzounis Directorate C DG Information Society European Commission.
EGEE JRU Workshop, Brussels, December 1 st, JRU RoGrid – Romanian Experience RoGrid Consortium RoGrid JRU set-up RoGrid JRU Implementation Internal.
MAP-IT! Review Meeting 5 March Brussels Project Next Steps Cybion Srl.
CENTRAL EUROPE PROGRAMME PROJECT DEVELOPMENT FINANCIAL ISSUES Project development seminar Prague, 1 st February 2010 Luca FERRARESE JTS CENTRAL.
Advanced Remote Tower 1 13 Nov 2007Malmö/Sturup1 Advanced Remote Tower Administrative processes (WP0.1, WP4.3) Malmö/Sturup 13 Nov 2007.
European network for Health Technology Assessment | JA | EUnetHTA European network for Health Technology Assessment THL Info.
TECHNICAL QUALITY MANAGEMENT Technical Quality Management Co-funded by the Prevention, Preparedness and Consequence Management of Terrorism and other Security-related.
Ismar Financial report procedures. Ismar Financial reporting For each reporting period of activity Each partner shall produce a “Periodic Management Report”
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
1 FP6 – Financial Management and Reporting 1 April 2006 Sofia, Bulgaria.
Brussels, January 16th, Overview and status of the project.
WP3 - Evaluation and proposal selection
The 6th Framework Programme
ETHICBOTS Kick-off Internal Meeting
WP1 - Consortium coordination and management
Funded by the Erasmus+ Programme EPP JO-EPPKA2-CBHE-JP Lina Tsakalou
DIME Plenary Thomas Burg –Statistics Austria
Civil Protection Financial Instrument – Prevention Projects
FP7 SCIENTIFIC NEGOTIATIONS
Information session SCIENTIFIC NEGOTIATIONS Call FP7-ENV-2013-two-stage "Environment (including climate change)" Brussels 22/05/2013 José M. Jiménez.
AMICI WP1 – Management, coordination and dissemination
Presentation transcript:

ETHICBOTS Emerging Technoethics of Human Interaction with Communication, Bionic, and robotic Systems WP1 – Project coordination and management Guglielmo Tamburrini

ETHICBOTS Emerging Technoethics of Human Interaction with Communication, Bionic, and Robotic Systems Outline of the presentation  Structure of project management and people in charge  Financial management  Timeline of events

ETHICBOTS Emerging Technoethics of Human Interaction with Communication, Bionic, and Robotic Systems Structure of project management (from section 6.1 of the Technical Annex)

ETHICBOTS Emerging Technoethics of Human Interaction with Communication, Bionic, and Robotic Systems Components of the boards: proposals  Project coordinator: Guglielmo Tamburrini  Project manager: to be identified (provisionally Guglielmo Tamburrini)  WP2 coordinator: Thomas Christaller  WP3 coordinator: Guglielmo Tamburrini  WP4 coordinator: Rafael Capurro  WP5 coordinator: Fiorella Operto  Quality assurance board:  3 science&technology members:  Robotics ?  Bionics ?  Artificial intelligence ?  Moral philosopher: ?  Antropologist: ?  Psychologist: ?

ETHICBOTS Emerging Technoethics of Human Interaction with Communication, Bionic, and Robotic Systems Workpackages Work package No Work package titleLead contractor No Person- months Start month End month Deliverable No WP1Project coordination and management 16024D3, D11 WP2Joint analysis of the state of the art in emerging technologies for the integration of human beings and artificial entities 2706D1 WP3Coordination activities for the cooperative identification and analysis of techno-ethical issues D2,D5 WP4Proposal of standards and recommendations for the EU D4, D6 WP5Dissemination320024D7, D8, D9, D10 TOTAL75

ETHICBOTS Emerging Technoethics of Human Interaction with Communication, Bionic, and Robotic Systems Workpackages

ETHICBOTS Emerging Technoethics of Human Interaction with Communication, Bionic, and Robotic Systems Timeline Months 0-6:  joint preparation and discussion of three tutorials on technological states of the art  The three internal reports will constitute deliverable D1 (Fraunhofer).

ETHICBOTS Emerging Technoethics of Human Interaction with Communication, Bionic, and Robotic Systems Timeline Months 7-12: M1: workshop (to be held in Italy), whose aims are  to set-up a common language and a methodological framework for the joint analysis of techno-ethical issues that will be carried out in WP3;  to start the definition of the methodology for the joint identification of techno-ethical issues  to identify an initial set of ethical issues to be analyzed during the project;  Tutorials. to present the states of the art in the three broad technological areas considered (AI for communication and information, robotics and bionics), in the form of tutorials;  to present and discuss the timeline of events (workshops and public events) to be carried out, as previously planned by the Scientific Board;

ETHICBOTS Emerging Technoethics of Human Interaction with Communication, Bionic, and Robotic Systems Timeline Months 13-18:  An internal meeting will be held with the following aims:  to start task T3.3 (Analysis of techno-ethical issues), and to jointly contribute and finalize deliverable D2;  to collect and discuss materials related to WP4 activity (Proposal of standards and recommendations for the EU);  to validate the internet-based public access information system;  to define a plan for refresher courses (T5.2).  Public events with interest groups, journalists, policy makers will be organized. Some of these public events may take the form of multimedia streaming events, supported by the internet-based public access information system.

ETHICBOTS Emerging Technoethics of Human Interaction with Communication, Bionic, and Robotic Systems Timeline Months 19-24:  M3: organization of the second workshop (to be held in Germany), which aims at presenting and discussing the major WP results achieved so far. Notably,  the proposed methodology for the joint identification and analysis of techno- ethical issues (T3.1)  the set of techno-ethical issues identified in the framework of task T3.2  the ongoing analysis of the identified techno-ethical issues  the analysis of national and international ethical regulations identified in the framework of T4.1, and the status of advancement of the ongoing activity of task T4.2  the status of the dissemination activities.  Other public events, as in the last six-months period, will be organized.  Organization of 1 internal meeting (towards the end of the project), to which the whole consortium is invited to participate, for the organization and discussion of deliverable D10, “Roadmap for techno-ethical research”.

ETHICBOTS Emerging Technoethics of Human Interaction with Communication, Bionic, and Robotic Systems Deliverables Del. no.Deliverable nameWP no.Lead participant Delivery date (proj. month) D1Analysis of the State of the Art in emerging technologies for the integration of human and artificial entities WP22M6 D2Methodology for the identification and analysis of techno-ethical issues WP31M12 D3Annual reportWP11M12 D4Analysis of national and international EU regulations and ethical councils opinions related with technologies for the integration of human and artificial entities WP4M18 D5Analysis of techno-ethical issuesWP31M24 D6Proposal of standards and recommendations for EU techno-ethical regulations WP46M24 D7The ETHICBOTS internet-based information system WP53M24

ETHICBOTS Emerging Technoethics of Human Interaction with Communication, Bionic, and Robotic Systems Deliverables D8Report on organization of refresher courses for researchers, high school teachers, and university instructors WP53M24 D9Report on public eventsWP53M24 D10Roadmap for techno-ethical researchWP53M24 D11Final reportWP11M24 D12Final Plan for using and disseminating knowledge WP55M24

ETHICBOTS Emerging Technoethics of Human Interaction with Communication, Bionic, and Robotic Systems Timeline of the next 6 months Kick-off meeting (November 26th 2005) Deadline for checking progress(February 1st 2006) First Workshop (date to be defined) preparation of the three tutorials on the technology states of the art setting-up of the internet-based communication system plan for dissemination finalization of the three tutorials on the technology states of the art

ETHICBOTS Emerging Technoethics of Human Interaction with Communication, Bionic, and robotic Systems Financial management

ETHICBOTS Emerging Technoethics of Human Interaction with Communication, Bionic, and Robotic Systems Plan for using resources  the Coordination Unit, composed by 1 secretary for project management (ETHICBOTS Project Manager) and collaborators, if necessary;  Collaboration contracts for components of the Quality Assurance Board;  1 secretary for each meeting (from the responsible participant group);  Technicians for the internet-based public access information system set-up;  1 responsible for the internet-based public access information system management;  Additional funds for hiring people releasing necessary certifications (including auditing).

ETHICBOTS Emerging Technoethics of Human Interaction with Communication, Bionic, and Robotic Systems Contribution  Total contribution: € ,00  A pre-financing of € ,00 within December 15th  The rest is allocated according to the Article 8 of the Contract, and to the estimated breakdown included in Annex I

ETHICBOTS Emerging Technoethics of Human Interaction with Communication, Bionic, and Robotic Systems Distribution of budget among participants 1.For each of four six-months period, the number of total person-months for each partner (comprehensive of the 5 WP) is calculated 2.The total contribution to each partner is distributed on the four periods according to the person-months calculated at step 1

ETHICBOTS Emerging Technoethics of Human Interaction with Communication, Bionic, and Robotic Systems Person-months for each partner and for each WP WP months: 0-23 WP months: 0-5 WP months: 6-23 WP months: WP months: 0-23 part. no.

ETHICBOTS Emerging Technoethics of Human Interaction with Communication, Bionic, and Robotic Systems Example: DSF 6 months WP11,5 WP21000 WP30111 WP4000,5 WP50,5 TOT333,5 24 months = 6 pm = 1 pm = 3 pm = 1 pm = 2 pm active WP inactive WP

ETHICBOTS Emerging Technoethics of Human Interaction with Communication, Bionic, and Robotic Systems Total person-months subdivision for each partner 6-months period #1 6-months period #2 6-months period #3 6-months period #4tot 1333, ,25 1, ,51,52, ,250,651, ,75 2, ,25 1, ,251,252, ,250,851,852,056

ETHICBOTS Emerging Technoethics of Human Interaction with Communication, Bionic, and Robotic Systems Distribution of EU funds according to person-months 6-months period #1 6-months period #2 6-months period #3 6-months period #4budget , , , , , , , , , ,716857, , , , , , ,005850, , , , , , , , , ,006250, , , ,674958, , , ,00

ETHICBOTS Emerging Technoethics of Human Interaction with Communication, Bionic, and Robotic Systems Pre-financing  Pre-financing: € ,00 within December 15th  Total contribution for the first 2 periods: €  The remaining ,00 = 3429,12 are equally subtracted to each partner (€ 342,91 ) 6-months period #1 6-months period # , , , ,716857, , ,005850, , , ,006250, ,674958,33

ETHICBOTS Emerging Technoethics of Human Interaction with Communication, Bionic, and Robotic Systems Distribution of the pre-financing DSF28272, ,00 FhG/AIS23823, ,00 SdR16457, ,00 IsFA8799,958800,00 UNIRDG20990, ,00 HdM7757,097757,00 CNRS19344, ,00 SSSA12990, ,00 UNIPI7157,097157,00 UM11907, ,00 rounded-up

ETHICBOTS Emerging Technoethics of Human Interaction with Communication, Bionic, and Robotic Systems ETHICBOTS website 