Edinburgh, June 2006 1 Interferometry: FP6 & FP7 Alain Chelli, LAOG and Jean-Marie Mariotti Center Andreas Quirrenbach, U Heidelberg on behalf of the European.

Slides:



Advertisements
Similar presentations
AMBER and MIDI from user’s point of view EuroSummer School Observation and data reduction with the Very Large Telescope Interferometer Goutelas, France.
Advertisements

DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE The DevDET/EUVIF Program: a FP7 project CHIPP Workshop on detector R&D Geneva, June 2008 Daniel.
TIARA-FAM Final Annual Meeting R. Aleksan Nov. 25 th, Meeting Objectives 2.General Information 3.Deliverables/milestones.
OPTICON Board Meeting, Porto, OPTICON WP4 Interferometry Status Report D. Mourard presented by A. Chelli.
CREST OMC Working Group Internationalisation of R&D Brussels, 3rd April nd Phase of the CREST OMC Working Group “Internationalisation of S&T“ Final.
ASPERA-2 WP2: Extension of the network and update of the status of Astroparticle Physics  Objectives  Structure  Tasks  Milestones & Deliverables Kickoff.
0 THE NETWORK OF ULTRAVIOLET ASTROPHYSICS Inform for the MTR Review to be held in Corfu (September 2007, 10-11) Prepared by: Prof. Ana Inés Gómez de Castro.
Our Mission The OPTICON Integrated Infrastructure Initiative brings together many of Europe's astronomical observatories, data centres and laboratories.
Info Day - Promoting FP7 – Theme 1 HealthFeb. 14th, 2007, Bucharest Building on the success of SMEs go Life Sciences SMEs go Health.
1 Briefing to the CAA on the Terrestrial Planet Finder (TPF): Finding and Characterizing Earth-like Planets Zlatan Tsvetanov, NASA Program Scientist Charles.
OPTICON Summary by John Davies. OPTICON The Optical Infrared Co-ordination Network for Astronomy. Overview John Davies OPTICON Project Scientist. UK Astronomy.
Our Mission The OPTICON Integrated Infrastructure Initiative brings together all of Western Europe's owners and operators of large observatories and data.
NA5: Interferometry Forum Andreas Quirrenbach (U Leiden / U Heidelberg)
Towards a Design Study Proposal for a 3rd Generation Interferometric Gravitational- wave Detector Harald Lück London, October 26th 2006.
T-REX OU4 HIRES The high resolution spectrograph for E-ELT E. Oliva, T-REX meeting, Sexten Pustertal (I)1.
OPTICON Board Meeting, Grenoble October Project Scientist Report John Davies UK Royal Observatory Edinburgh.
Emilios Harlaftis, National Observatory of Athens OPTICAL AND IR Coordination Network An EU Infrastructure Cooperation Network (FP5) with the aim to bring.
John Davies. FP7 Planning Meeting, UKATC June OPTICON FP7 Networking Plans John Davies OPTICON Project Scientist.
1 ASTRONET PROGRAM STATUS as of Preliminary Board 1 st Meeting Paris, 31 May 2005.
OPTICON The Optical Infrared Co-ordination Network for Astronomy. Overview and Status Report. John Davies OPTICON Project Scientist. UK Astronomy Technology.
EPOS Preparatory phase Torild van Eck (ORFEUS) Call INFRA Deadline: December 3, 2009 Funding: between 3 and 6 MEuro Duration: max 4 year.
KNOWLEDGE BASE ON MOBILITY Vadym Yashenkov, NIP Ukraine Deputy Director Kyiv, Ukraine 24 September 2009.
AVO Status June 2002 Status M. Dolensky. AVO Status June 2002 WA0 - European Initiatives Enabling a Virtual Observatory for Europe EVOE –Submitted expression.
Our Mission The OPTICON Integrated Infrastructure Initiative brings together all of Western Europe's owners and operators of large observatories and data.
EGIDA PROJECT 1stJoint Workshop of the EGIDA Stakeholder Network and Advisory Board Connecting GEOSS and its Stakeholders in Science.
Opticon Porto 1 High Time Resolution Astrophysics Network Andy Shearer Centre for Astronomy School of Physics, NUI, Galway Ireland.
Results of the HPC in Europe Taskforce (HET) e-IRG Workshop Kimmo Koski CSC – The Finnish IT Center for Science April 19 th, 2007.
Key Technologies Network Colin Cunningham. 11th Oct 2004 OPTICON Key Technologies Network Grenoble2 Objectives WP5.1: Workshops & Roadmapping: WP5.1:
Alain Chelli – JRA4 Status Report – Opticon meeting – Corfu, September 11 th, Joint Research Activity # 4 Integrating Interferometry into Mainstream.
Notur: - Grant f.o.m is 16.5 Mkr (was 21.7 Mkr) - No guarantees that funding will increase in Same level of operations maintained.
An I3 funded by the EU through FP6 Alastair G Gunn University of Manchester Jodrell Bank Observatory OPTICON BOARD MEETING – 11 th /12 th October 2004,
OPTICON JRA4 Coordinator Dr Alain Chelli Laboratoire d’Astrophysique de Grenoble & Jean-Marie Mariotti Center, Universite Joseph Fourier, BP53, Grenoble.
Solar Physics within OPTICON O. von der Lühe Kiepenheuer-Institut für Sonnenphysik Freiburg, Germany.
Our Mission The OPTICON Integrated Infrastructure Initiative brings together many of Europe's astronomical observatories, data centres and laboratories.
IRC: ICT Presentation Sept Opportunities through Collaboration Ing.Pierre Theuma Manager, IRC Malta.
1 Direction scientifique Networks of Excellence objectives  Reinforce or strengthen scientific and technological excellence on a given research topic.
The Virtual Observatory Europe and the VO: the Astrophysical Virtual Observatory and the EURO-VO Astrophysical Virtual Observatory and the EURO-VO Paolo.
1 ASTRONET Coordinating strategic planning for European Astronomy.
A global approach to ELT instrument developments J.-G. Cuby for the French ELT WG.
EURO-VO Structure Data Centre Alliance (DCA) A collaborative and operational network of European data centres who, by the uptake of new VO technologies.
Katherine Wilson EMRP Project Officer The European Metrology Research Programme (EMRP) E2C Conference_EMRP_Budapest 13.
What European needs to do to take the lead in Space Astronomy ESO Astronomy Faculty May 2004.
WP2 – Strategy, co-operation and dissemination EuroVO-AIDA – First periodic review – 24 April 2009 Françoise Genova, Project Coordinator WP2 – NA2 Strategy,
EPOS where we are, where we go ! Massimo Cocco INGV Rome September EPOS Meeting.
WelcomeWelcome CSEM – CERN Day 23 rd May 2013 CSEM – CERN Day 23 rd May 2013 to Accelerating Science and Innovation to Accelerating Science and Innovation.
Bureau for International Research and Technology Cooperation Herlitschka 1 Warsaw FP6 Launch Conference - 26 Nov Small and Medium Enterprises -
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement European Network for.
Introduction to the VO ESAVO ESA/ESAC – Madrid, Spain.
Stakeholder Relations at Large-Scale Infrastructures The CERN Model Rolf Heuer 7 th Canadian Science Policy Conference, Ottawa, 26 November 2015.
DEPARTMENT OF PHYSICS AND ASTRONOMY X-ray Astronomy and Space Instrumentation I3 Meeting, December 2004 Integrating Space Radiation Sensing Infrastructures.
Report on ApPEC Maurice Bourquin 2010 CHIPP Plenary Meeting.
The Role of an Access Programme: Lessons for FP7 Birgitta Nordström Niels Bohr Institute, Copenhagen University Denmark.
WELCOME IN GOUTELAS!... Euro Summer School: Observing and Data Reduction with the Very Large Telescope Interferometer Goutelas, 5-16 June 2006.
The Very Large Telescope Interferometer Neon School, Garching 29 August, 2008 Andrea Richichi European Southern Observatory.
INS SW Workshop, Garching 8 October, 2008 Andrea Richichi European Southern Observatory.
Thomas Gutberlet HZB User Coordination NMI3-II Neutron scattering and Muon spectroscopy Integrated Initiative WP5 Integrated User Access.
Michele Punturo INFN Perugia and EGO 1 3rd ET annual workshop - Budapest 23-24/11/2010.
Astroparticle Physics European Consortium What can large Astroparticle Physics projects like LAGUNA-LBNO expect from the new APPEC, the Astroparticle Physics.
ALMA and FP6 Opportunities and strategy Funded project – construction phase FP6 timeframe 2003 – Good timing - first science planned for.
H. PERO, E uropean Commission European policy developments and challenges in the field of Research Infrastructures.
Berlin Observatory Berlin, Germany. What is it? The Berlin Observatory is a series of observatories and related organizations in and around the city of.
ERA-Instruments Thomas Gübitz, Johannes Janssen, Christian Renner, Bonn, 4 Februar 2008 Infrastructure Funding in the Life Sciences.
Mindfuel at the heart of transport research Era-net inTransport How theCzech organisations may participate Mindfuel at the heart of transport research.
Best Sustainable Development Practices for Food Security UV-B radiation: A Specific Regulator of Plant Growth and Food Quality in a Changing Climate The.
The European Contribution to eXTP
ROSCOE Robust Scientific Communities for EGI
EU: First- & Second-Generation Immigrants
ASTRONET Coordinating strategic planning for European Astronomy
OPTICON The Optical Infrared Co-ordination Network for Astronomy.
Perspective of an International Research Center
Presentation transcript:

Edinburgh, June Interferometry: FP6 & FP7 Alain Chelli, LAOG and Jean-Marie Mariotti Center Andreas Quirrenbach, U Heidelberg on behalf of the European interferometric community OPTICON Meeting, June 2006, Edinburgh

Edinburgh, June Activities in FP6 Alain Chelli Andreas Quirrenbach

Edinburgh, June Integrating interferometry into mainstream astronomy  Objectives Maintain & reinforce european interferometryMaintain & reinforce european interferometry Generate a long term european visionGenerate a long term european vision Integrate new countriesIntegrate new countries Formation/exchange of students/investigatorsFormation/exchange of students/investigators Make the VLTI an end-to-end service instrumentMake the VLTI an end-to-end service instrument

Edinburgh, June Participants: 14 countries+ ESA + ESO (> 20 labs)  Universität Wien (Austria)  Universitè de Liège (Belgium)  Academy of Sciences (Czech Republic)  Jean-Marie Mariotti Center for Interferometry, JMMC (France)  Max-Planck-Institut für Astronomie (Germany)  Konkoly Observatory (Hungary)  Technion (Israel)  Torino University (Italy)  Nederlandse Onderzoekschool Voor Astronomie, NOVA (The Netherlands)  Torun University (Poland)  Porto University (Portugal)  Universidad Autonoma Madrid (Spain)  Observatoire de Genève (Switzerland)  University of Cambridge (United Kingdom)  European Space Agency  European Southern Observatory

Edinburgh, June th Framework Program Integrated Infrastructure Initiatives (I3) OPTICON PC: Gerry Gilmore / PS: John Davies Marie-Curie Program PC: P. Garcia JRA4 PC: Chelli Network 5 PC: A.Quirrenbach Euro-Interferometry Initiative (EII) Executive Board (JRA4+N5+MC boards) Scientific Council (1 representative per country) Chair: T. Henning MOU

Edinburgh, June WP1: Exchange visitor program WPL: Andrej Niedzelski (Torun) WP2: Working groups WPL: S. Wolf (MPIA) WP3: Modeling & Technology WPL: Jean Surdej (U. Liege) Network # 5 “Integrating interferometry into mainstream astronomy” PC: Andreas Quirrenbach (U. Heidelberg) ( ~ 10 exchange programs per year 2 WG: Radiative transfer & Stellar Atmosphere Asteroseismology Objective: Initiate science case & technology roadmap for next-generation facility 260K€

Edinburgh, June Joint Research Activity # 4 “Integrating interferometry into mainstream astronomy” PC: Alain Chelli (LAOG) ( WP1 Advanced Instruments (2 nd Generation VLTI Instruments) WP1.1: Concepts to Feasibility WPLs: Uwe Graser (Heidelberg) & Denis Mourard (OCA) WP1.2: Cophasing & fringe tracking WPL: Mario Gai (Torino) Objective: facilitate the use of modern interferometric facilities such as ESO’s VLTI to a non specialist end user WP2: Off-line data reduction Software WPL: Gilles Duvert (LAOG) SPM: Gerard Zins (LAOG) 500K€ Objective: Prepare 2 nd generation of VLTI instruments

Edinburgh, June Advanced instruments: preparing VLTI2 instruments  6 Concept studies (01/ /2005) 4 Infrared multi-beams combiners4 Infrared multi-beams combiners 2 visible instruments2 visible instruments  2 (+1) instruments selected by ESO for phase A

Edinburgh, June WP2: Off-line Data Reduction Software WP2.2: Integration WP2.3: Model-fitting WP2.4: Astrometry WP2.5: Image Reconstruction WP2.1: Management & User Support Software: making the VLTI an end-to-end service instrument 1 st Prototype used at the Gouttelas summer school (June 2006)

Edinburgh, June Marie-Curie program 06/2006 Observations and data reduction with the VLTI Gouttelas, France 2007 Circumstellar disks and Planets CAUP, Portugal 2007 AGN’s Arcetri, Italy 2008 PRIMA Siofok, Hungary

Edinburgh, June Major Meetings  5 major meetings JRA4 Kick-off (Nice 01/2004)JRA4 Kick-off (Nice 01/2004) Science cases (JENAM 08/2004)Science cases (JENAM 08/2004) Technology roadmap (JENAM, 08/2005)Technology roadmap (JENAM, 08/2005) Joint EII/ESO workshop (Garching, 04/2005)Joint EII/ESO workshop (Garching, 04/2005) Joint ARENA/JRA4 workshop (Nice, 05/2006)Joint ARENA/JRA4 workshop (Nice, 05/2006)  EII Scientific Council 12 meetings since its creation in meetings since its creation in 2002

Edinburgh, June Major Achievements  Integrated and Expanded European interferometric community including Central Europe  Jump-started VLTI 2 nd generation instruments  1 st prototype user-friendly software being used at Gouttelas summer school  Initiated science case and technology roadmap for next-generation facility

Edinburgh, June Interferometry in FP7 Andreas Quirrenbach Alain Chelli

Edinburgh, June Top-Level Goals  Build on success of FP6  Exploit current instrumentation to the fullest Networking (exchange visits, working groups)Networking (exchange visits, working groups) User-friendly data reduction and analysis toolsUser-friendly data reduction and analysis tools  Support advances in VLTI instrumentation 2nd and 3rd generation instruments2nd and 3rd generation instruments  Prepare next-generation ground-based facility Build science caseBuild science case Conceptual design optionsConceptual design options Develop critical technologiesDevelop critical technologies  Support space-based interferometry Nulling technologyNulling technology General science potentialGeneral science potential

Edinburgh, June Proposed FP7 Networking Activities  Fizeau Exchange Visitors Program  WG on science case for next-generation interferometer  WG on potential of Antarctica for interferometry (link with ARENA)  WG on Darwin science preparation  WGs on Interferometry and astrophysics E.g., asteroseismology, radiative transfer, fundamental stellar parametersE.g., asteroseismology, radiative transfer, fundamental stellar parameters  WG on VLTI instruments  Conference series: Applications of interferometry to astrophysics

Edinburgh, June Proposed FP7 JRA Activities (1 of 2)  Advanced user-friendly data reduction software  Second-generation data processing for VLTI  Optimized fringe tracking  Contribution to 2 nd -generation VLTI instruments (?)  Studies of 3 rd -generation VLTI instruments

Edinburgh, June Proposed FP7 JRA Activities (2 of 2)  Guided optics (fibers, integrated optics)  Nulling technology (link with ESA)  Detectors (single-pixel, energy resolution)  Multi-beam co-phasing  Array design concepts  Beam transport concepts  Beam combination technology  Interferometer end-to-end modeling

Edinburgh, June JRA Deliverables  Fully operational user-friendly software packages  Prototypes for key technologies (guided optics, nuller, single-pixel detector)  Realistic conceptual design(s) of next- generation interferometer

Edinburgh, June Indicative Budget  Networking activities:€ 775,000  Software & algorithms: € 1,200,000  Key technology development: € 1,800,000  Next gen. conceptual design: € 850,000  Post 2 nd gen. VLTI instruments: € 500,000  Grand total: € 5,125,000  EU Funding only; cost-sharing not included

Edinburgh, June Principal Interfaces  ESO (VLTI) and ESA (Darwin) Leave programmatics to ESO/ESALeave programmatics to ESO/ESA Support community and science casesSupport community and science cases  ELTs Technology synergies (co-phasing, mirror and telescope manufacturing, …)Technology synergies (co-phasing, mirror and telescope manufacturing, …)  ARENA (Interferometry in Antarctica) Through dedicated networkThrough dedicated network Deal mostly with specifics for interferometryDeal mostly with specifics for interferometry Leave specifics of Antarctica for ARENALeave specifics of Antarctica for ARENA  High-Time-Resolution JRA Specialized detectors (few pixels, energy resolution)Specialized detectors (few pixels, energy resolution)

Edinburgh, June Activities outside OPTICON  Summer School Series Marie Curie ProgramMarie Curie Program  Large Ground-Based Interferometer design study Preparation in FP6/FP7Preparation in FP6/FP7 Coordination with US (Decadal Review), othersCoordination with US (Decadal Review), others Timing depending on FP7 funding opportunitiesTiming depending on FP7 funding opportunities Would seek OPTICON endorsementWould seek OPTICON endorsement

Edinburgh, June Programmatic Questions  Number of participants in FP6 is large Success! Many groups are contributing, interferometric community is growingSuccess! Many groups are contributing, interferometric community is growing Management is difficult, accounting is tedious and expensiveManagement is difficult, accounting is tedious and expensive  Preparation of next-generation facility Design-study proposal to FP7Design-study proposal to FP7 Need to be ready in 2008 (?) – which level of maturity is required?Need to be ready in 2008 (?) – which level of maturity is required? Relation to roadmaps (ESFRI, Astronet)Relation to roadmaps (ESFRI, Astronet) Interface with OPTICON activitiesInterface with OPTICON activities