Life Cycle Cost Analysis for Bridges In Search of Better Investment and Engineering Decisions.

Slides:



Advertisements
Similar presentations
1 Roadway User Costs Nathaniel D. Coley Jr. Prefabricated Bridge Elements and Systems Work Zone User Costs Nathaniel D. Coley Jr. Federal Highway Administration.
Advertisements

B/C Ratio Engr. Faisal-ur-Rehman CED N-W.F.P UET P.
Executive Session Office of Asset Management
Life Cycle Cost Analysis for Bridges In Search of Better Investment and Engineering Decisions Presented by: Hank Bonstedt Executive Director Prestressed.
LCC YUSUF OZ FATIH BOLUKBAS HUSEYIN ANIL KARABULUT.
Capital Budgeting.
1 Luis Rodriguez, P.E. Federal Highway Administration Life Cycle Cost Analysis Virginia Concrete Conference March 6-7, 2014.
Lecture 7 Evaluating a Single Project PW, FW, AW IRR
© Mcgraw-Hill Companies, 2008 Farm Management Chapter 17 Investment Analysis.
EGR Evaluation Alternatives Present Worth Analysis Companies constantly evaluate whether or not to pursue projects. Mutually Exclusive Projects.
Study Unit 10 Investment Decisions. SU – The Capital Budgeting Process Definition – Planning and controlling investment for long-term projects.
Chapter 4. Economic Factors in Design The basis of design decisions will be economics. Designing a technically safe and sound system will be only part.
Pavement Type Selection (Designs, Costs & Bidding) 9 th Annual Concrete Conference for the Maryland Transportation Industry March 24, 2009 Timonium, MD.
Chapter 17 Investment Analysis
Contemporary Engineering Economics, 4 th edition, © 2007 Effects of Inflation on Project Cash Flows Lecture No. 45 Chapter 11 Contemporary Engineering.
GASB#34 Asset Management TEAM Transportation Fair Presentation by: Charles J. Nemmers, P.E. Charles J. Nemmers, P.E. October 8, 2004St. Louis, Missouri.
Heating and Air Conditioning I Principles of Heating, Ventilating and Air Conditioning R.H. Howell, H.J. Sauer, and W.J. Coad ASHRAE, 2005 basic textbook/reference.
Life Cycle Cost Analysis in Pavement Design - In Search of Better Investment Decisions - Office of Asset Management Federal Highway Administration Executive.
CHAPTER 8 PRICE CHANGES and ECHANGE RATES. Definitions Inflation –An increase in the average price paid for goods and services bringing about a reduction.
Life Cycle Cost Analysis
Present Worth Analysis Lecture No.15 Professor C. S. Park Fundamentals of Engineering Economics Copyright © 2005.
Life Cycle Costing and Reliability H. Scott Matthews February 5, 2003.
VI-Economic Evaluation of Facility Investments 1. Project Life Cycle and Economic Feasibility 2.Basic Concepts of Economic Evaluation 3.Costs and Benefits.
Economic Concepts Related to Appraisals. Time Value of Money The basic idea is that a dollar today is worth more than a dollar tomorrow Why? – Consumption.
Advanced Engineering Economy Contemporary Engineering Economics, 5th edition, © 2010.
Time Value of Money by Binam Ghimire
AEC 422 Fall 2014 Unit 2 Financial Decision Making.
FOOD ENGINEERING DESIGN AND ECONOMICS
Managerial Finance Net Present Value (NPV) Week 5.
Principles of Managerial Accounting Chapter 14. Time Value of Money A dollar today is worth more than a dollar received in the future.
Summer Time Value of Money Session 2 07/02/2015.
Bridge Engineering Lecture 1 A Planning of Bridges Dr. Shahzad Rahman.
ETSI Methodology1 LCC Methodology Håkan Sundquist Structural Design and Bridges KTH.
Economic Analysis: Applications to Work Zones March 25, 2004.
Economic Evaluation of Pavement Alternatives CEE 320 Steve Muench 9/12/ The majority roads are public facilities built with tax money to serve the.
8- 1  2001 Prentice Hall Business Publishing Management Accounting, 3/E, Atkinson, Banker, Kaplan, and Young Capital Budgeting Chapter 8.
Lectures in Engineering Economy Prof. Corrado lo Storto DIEG, Dept. of Economics and Engineering Management School of Engineering, University of Naples.
AT Benefit Cost Analysis Model Highway Design, Project Management and Training Section Technical Standards Branch Presented by Bill Kenny, Director: Design,
Economic Evaluation of PV systems in Jordan
$$ Entrepreneurial Finance, 5th Edition Adelman and Marks 10-1 Pearson Higher Education ©2010 by Pearson Education, Inc. Upper Saddle River, NJ Capital.
Introduction to Economic Analysis Part 1 February 10, 2014.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Effects of Inflation on Project Cash.
Capital Budgeting The Capital Budgeting Decision Time Value of Money Methods of Capital Project Evaluation Cash Flows Capital Rationing The Value of a.
Mer439 - Design of Thermal Fluid Systems INTRODUCTION TO ENGINEERING ECONOMICS Professor Anderson Spring Term 2012.
Construction Conference Construction Conference NDDOT’s: NDDOT’s: Future Federal Funding Future Federal Funding State Legislative & Budget issues.
Evaluating a Single Project
Maintenance & Rehabilitation Strategies Lecture 5.
L15: Present Worth Analysis ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer Sciences.
Highway Costs Spring Highway Transportation Costs Type of CostExamples Highway investment costEngineering design, ROW, grading, drainage, pavement.
Chapter 12 Inflation Effects.
$$ Entrepreneurial Finance, 4th Edition By Adelman and Marks PRENTICE HALL ©2007 by Pearson Education, Inc. Upper Saddle River, NJ Capital Budgeting.
Chapter 8 Long-Term (Capital Investment) Decisions.
EML EML Engineering Design Methods Engineering-Economics Introduction Economic Decision Rules Hyman: Chapter 8.
Capital Expenditure Decisions Chapter 16 Copyright © 2014 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior.
MER Design of Thermal Fluid Systems INTRODUCTION TO ENGINEERING ECONOMICS Professor Bruno Winter Term 2005.
BLOCK 4 SELECTION OF THE PREFERRED ALTERNATIVE Pavement Data Collection Project evaluation Select feasible alternatives Reconstruction Restoration Recycling.
CHAPTER 10 PowerPoint Author: LuAnn Bean, Ph.D., CPA, CIA, CFE Copyright © 2014 McGraw-Hill Education. All rights reserved. No reproduction or distribution.
Benefit/Cost Ratios, Internal rate of Return, valuation, and depreciation.
Example 1: Because of general price inflation in the economy, the purchasing power of the Turkish Lira shrinks with the passage of time. If the general.
Cash Flow Analysis Construction Engineering 221 Economic Analysis.
Road Investment Decision Framework
Effects of Inflation on Project Cash Flows
Chapter 5: Evaluating a Single Project
Deterioration models.
Multi-Year Programming and Predictive Modelling
Evaluation Alternatives Present Worth Analysis
Chapter 5: Evaluating a Single Project
Project Feasibility Analysis
Life Cycle Cost Analysis
Deterioration models.
Presentation transcript:

Life Cycle Cost Analysis for Bridges In Search of Better Investment and Engineering Decisions

What is Life Cycle Cost? An economic analysis procedure that uses engineering inputs Compares competing alternatives considering all significant costs Expresses results in equivalent dollars (present worth) An economic analysis procedure that uses engineering inputs Compares competing alternatives considering all significant costs Expresses results in equivalent dollars (present worth)

Cost Considerations Maintenance and Inspection Cost Initial Cost Costs Present Worth Years Rehabilitation Cost Salvage Value Salvage Costs

Present Worth Analysis Discounts all future costs and benefits to the present: t=n PW = FC +  pwf [MC+IC+FRC+UC] + pwf [S] t=0 Discounts all future costs and benefits to the present: t=n PW = FC +  pwf [MC+IC+FRC+UC] + pwf [S] t=0 FC = First (Initial) Cost t= Time Period of Analysis MC = Maintenance Costs IC = Inspection Costs FRC = Future Rehabilitation Costs UC= Users Costs S= Salvage Values or Costs pwf = Present Worth Factor FC = First (Initial) Cost t= Time Period of Analysis MC = Maintenance Costs IC = Inspection Costs FRC = Future Rehabilitation Costs UC= Users Costs S= Salvage Values or Costs pwf = Present Worth Factor

First (Initial) Cost Initial cost of structure Incentive/disincentive payments should not be included since they would reflect user benefits or costs prior to structure going into service Initial cost of structure Incentive/disincentive payments should not be included since they would reflect user benefits or costs prior to structure going into service

Time Period of Analysis Normally equal for all alternatives Should include at least one major rehabilitation –Needed to capture the true economic benefit of each alternative Bridge design today is based on a probabilistic model of 100 years Normally equal for all alternatives Should include at least one major rehabilitation –Needed to capture the true economic benefit of each alternative Bridge design today is based on a probabilistic model of 100 years

Maintenance Costs Annual cost associated with the upkeep of the structure Information is difficult to obtain for a given project Cost varies on the basis of size of the structure (sqft) Best Guess Values –Frequency - Annual –Concrete0.05 % of Initial Cost –Structural Steel0.05 % of Initial Cost Annual cost associated with the upkeep of the structure Information is difficult to obtain for a given project Cost varies on the basis of size of the structure (sqft) Best Guess Values –Frequency - Annual –Concrete0.05 % of Initial Cost –Structural Steel0.05 % of Initial Cost

Inspection Costs Requirements set forth in the National Bridge Inspection Standards (23 CFR 650.3) Occurs for all alternatives every two years Cost varies on the basis of size of the structure (sqft) and by construction material Best Guess Values –Frequency - Biannual –Concrete0.15 % of Initial Cost –Structural Steel0.20 % of Initial Cost Requirements set forth in the National Bridge Inspection Standards (23 CFR 650.3) Occurs for all alternatives every two years Cost varies on the basis of size of the structure (sqft) and by construction material Best Guess Values –Frequency - Biannual –Concrete0.15 % of Initial Cost –Structural Steel0.20 % of Initial Cost

Future Painting Costs Only applies to structural steel structures but excludes weathering steel Should occur every 20 years Cost varies on the basis of size of the structure (sqft) Best Guess Values –Frequency – every 20 years –Concrete0.0 % of Initial Cost –Structural Steel7.0 % of Initial Cost Only applies to structural steel structures but excludes weathering steel Should occur every 20 years Cost varies on the basis of size of the structure (sqft) Best Guess Values –Frequency – every 20 years –Concrete0.0 % of Initial Cost –Structural Steel7.0 % of Initial Cost

Future Rehabilitation Costs The frequency is not only a function of time but also the growing traffic volume and the structural beam system Cost varies on the basis of size of the structure (sqft) and structural beam system Best Guess Values –Frequency First occurrence – Concrete 40 years First occurrence – Structural Steel 35 years Annual traffic growth rate.75 % (shortens rehab cycles) –Concrete20.0 % of Initial Cost –Structural Steel22.0 % of Initial Cost The frequency is not only a function of time but also the growing traffic volume and the structural beam system Cost varies on the basis of size of the structure (sqft) and structural beam system Best Guess Values –Frequency First occurrence – Concrete 40 years First occurrence – Structural Steel 35 years Annual traffic growth rate.75 % (shortens rehab cycles) –Concrete20.0 % of Initial Cost –Structural Steel22.0 % of Initial Cost

Salvage Value/Costs Occurs once at end of life of structure Difference between –Removal cost –Salvage value Best Guess Values –Removal cost 10 % of Initial Cost –Salvage Value – Concrete - 0 % of Initial Cost –Salvage Value – Structural Steel - 2 % of Initial Cost Occurs once at end of life of structure Difference between –Removal cost –Salvage value Best Guess Values –Removal cost 10 % of Initial Cost –Salvage Value – Concrete - 0 % of Initial Cost –Salvage Value – Structural Steel - 2 % of Initial Cost

Users Costs For early construction completion, maintenance and rehabilitations only Delay-of-use Time delay Fuel consumption Driver discomfort Vehicle operating costs Accidents For early construction completion, maintenance and rehabilitations only Delay-of-use Time delay Fuel consumption Driver discomfort Vehicle operating costs Accidents

Users Costs Pros –Users pay for transportation system –Drives the results Cons –Owner can not recoup costs –Not in my budget –Drives the results Pros –Users pay for transportation system –Drives the results Cons –Owner can not recoup costs –Not in my budget –Drives the results

Users Costs Driver Delay Costs: DDC = (L/S a -L/S n ) x ADT x N x w L = Length of affected road way S a = Traffic speed during maintenance activity S n = Normal traffic speed ADT= Average daily traffic (vehicles per day) N = number of days of maintenance activity w= Hourly time value of drivers Driver Delay Costs: DDC = (L/S a -L/S n ) x ADT x N x w L = Length of affected road way S a = Traffic speed during maintenance activity S n = Normal traffic speed ADT= Average daily traffic (vehicles per day) N = number of days of maintenance activity w= Hourly time value of drivers

Users Costs Vehicle Operating Costs: VOC = (L/S a -L/S n ) x ADT x N x r L = Length of affected road way S a = Traffic speed during maintenance activity S n = Normal traffic speed ADT= Average daily traffic (vehicles per day) N = number of days of maintenance activity r= weighted-average vehicle cost Vehicle Operating Costs: VOC = (L/S a -L/S n ) x ADT x N x r L = Length of affected road way S a = Traffic speed during maintenance activity S n = Normal traffic speed ADT= Average daily traffic (vehicles per day) N = number of days of maintenance activity r= weighted-average vehicle cost

Users Costs Accident Costs: AC = L x ADT x N x (A a -A n ) x c a L = Length of affected road way ADT= Average daily traffic (vehicles per day) N = number of days of maintenance activity A a = Accident rate during maintenance activity A n = Normal accident rate c a = Cost per accident Accident Costs: AC = L x ADT x N x (A a -A n ) x c a L = Length of affected road way ADT= Average daily traffic (vehicles per day) N = number of days of maintenance activity A a = Accident rate during maintenance activity A n = Normal accident rate c a = Cost per accident

Present Worth Factor 1 pwf = (1 + i) n 1 pwf = (1 + i) n pwf= Present Worth Factor for discount rate i and year n i= Discount rate n= Number of years when cost (benefit) will occur pwf= Present Worth Factor for discount rate i and year n i= Discount rate n= Number of years when cost (benefit) will occur

Discount Rate Interest - Inflation i = 1 + Inflation Interest - Inflation i = 1 + Inflation Interest – The return of an investment that raises the future value of an invested dollar Inflation – The erosion of a dollar’s value that raises any future expenses Use of a discount rate allows for the use of constant dollars in the analysis Interest – The return of an investment that raises the future value of an invested dollar Inflation – The erosion of a dollar’s value that raises any future expenses Use of a discount rate allows for the use of constant dollars in the analysis

Process And Approach Limits Government does not invest money to gain cash benefits (interest) Government money is generally invested only in depreciating assets Anything not bought this year costs more next year (inflation) Government does not invest money to gain cash benefits (interest) Government money is generally invested only in depreciating assets Anything not bought this year costs more next year (inflation)

A Spreadsheet Tool The following Microsoft Excel Spreadsheet allows for the manipulation of Life Cycle Cost data LCC Analysis-ver4.xls The following Microsoft Excel Spreadsheet allows for the manipulation of Life Cycle Cost data LCC Analysis-ver4.xls

Questions? Thank you for your Attention!