ECE Grande ECE 477 Design Review Team 3 - Fall 2008.

Slides:



Advertisements
Similar presentations
Greg Beau SerajAnanya. Outline  Project overview  Project-specific success criteria  Block diagram  Component selection rationale  Packaging design.
Advertisements

ECE 477 Design Review Team 6  Spring 2010 Shao-Fu ShihSteve AndersonMike Goldfarb Josh Smith.
Outline Project overview Project-specific success criteria Block diagram Component selection rationale Packaging design Schematic and theory of operation.
Jason CrayJoseph Mundackal Michael WarscoRyan Sherlock.
Twitch Plays ECE477 ECE 477 Design Review Team 1 − Spring 2015 Hannan Harlan Root Tornquist.
ECE 477 DESIGN REVIEW TEAM 7  SPRING 2013 COST ROBOT CAROLINE TRIPPEL, ANDREW LOVELESS, ERIC OSBORNE, BRYAN DALLAS.
ECE 477 Design Review Team 13  Spring 2008 Paste a photo of team members here, annotated with names of team members. Srichand Varun Madhu Anvesh.
IDine A Camera based Multi-touch Dining table Tejas D Kulkarni Abhisheyk Gaur Himanshu Raghav Ankur Mishra.
ECE 477 Design Review Team 7  Spring 2011 Paste a photo of team members here, annotated with names of team members. Stuart Pulliam Will Granger Linda.
ECE 477 Design Review Group 9  Spring 2005 Omar Shaikh - Nathan Smith - Jeff Huston - Ryan Koors.
Jordan Wagner Justin Spencer Mark Sears John Jachna.
ECE 477 Design Review – Spring 2010 Team 15. Team Members.
ECE 477 Design Review Team 1  Fall Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 Design Review Team 19  Spring 2013 Paste a photo of team members here, annotated with names of team members. Calvin Mwesigwa John Marston Noah.
ECE 477 Design Review Team 01  Fall 2013 Paste a photo of team members here, annotated with names of team members.
ECE 477 Design Review Team 4  Spring 2008 Zach Dicklin Amy Ritter Ian Bacon Eric Yee.
ECE 477 Design Review Team 2  Spring 2010 Digi-Brush Josh LongCaleb Ayew-ewKatie Schremser.
ECE 477 Design Review Group 14  Spring 2005 Paste a photo of team members here, annotated with names of team members.
Solar Telematics System ECE 477 Design Review, Team 8, Spring 2012 Paste a photo of team members here, annotated with names of team members. Craig Lechlitner,
ECE 477 Design Review Team 5  Fall 2007 Wes Chris Josh Dave.
 Project overview  Project-specific success criteria  Block diagram  Component selection rationale  Packaging design  Schematic and theory of operation.
ECE 477 DESIGN REVIEW TEAM 2  FALL 2011 Members: Bo Yuan, Yimin Xiao, Yang Yang, Jintao Zhang.
ECE 477 Design Review Team 03 - Spring 2013 Robert HarrisSpencer JulianRyan PawlingJosh Hunsberger.
ECE 477 Design Review Team 09  Spring 2010 Luke Ethan Andy Dhruv.
ECE 477 Design Review Team 2  Fall Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
Tone Matrix Music Box Jun Jun PehWan Qi Choo Kian Hui Wong Chia Siong Goh.
Team Foreigner (Group 11) “Cold as Ice” Smart Refrigerator Midterm Design Review.
ECE 477 Design Review Team 9  Fall 2009 Josh Piron, Jacob Pfister Kevin Templar, Mike Phillips,
ECE 477 Design Review Team 2  Spring 2006 Prashant Grimella Andy Brezinsky Tim Sendgikoski Clark Malmgren.
ECE 477 Design Review Team 14  Spring 2006 Jason, Nathanael, David, David.
ECE 477 D ESIGN R EVIEW T EAM 5 MY ATM F ALL 2012 Tung Lun Loo Yu Chen Lim Chuan Yean Tan Xue Yuan Wong.
Team 6 DOODLE DRIVE Alexander Curtis Peachanok Lertkajornkitti | Jun Pan | Edward Kidarsa |
ECE 477 Design Review Team 6  Spring 2006 Greg Snow Allan Patterson Kyle McGhee Joseph Davidson.
ECE 477 Design Review Team 02  Fall Outline Project overview - KProject overview - K Project-specific success criteria -KProject-specific success.
ECE 477 Design Review Team 3  Fall 2007 Steven Kingsley (Analog) Roy Scheck (Leader) Tony Liechty (Digital) Charles Lan (Software)
ECE 477 Design Review Team 8(SLOW)  Spring 2006.
ECE 477 Design Review Group 5  Spring Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 DESIGN REVIEW FEST – FALL OUTLINE  Project overview  Project-specific success criteria  Block diagram  Component selection rationale.
ECE 477 Design Review Team 1  Spring 2008 Alan BernsteinIan AlsmanIlya VeygmanDarshan Shah.
ECE 477 Design Review Team 7  Spring 2008 Paste a photo of team members here, annotated with names of team members.
ECE 477 Design Review Team 3  Spring Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 Final Presentation Team 4  Spring Outline Project overviewProject overview Block diagramBlock diagram Design challengesDesign challenges.
ECE 477 Design Review Team 12  Spring 2006 EricDaniel Atandra Sriharsha Aasenda Silva Burman Vengapaty.
ECE 477 DESIGN REVIEW TEAM 4  SPRING 2015 Matt Carpenter, Grant Gumina, Chris Holly, and Michael Pak.
ECE 477 Design Review Team 5  Spring Project Overview Inertial based character recognition deviceInertial based character recognition device Battery.
ECE 477 Design Review Team 4  Spring 2006 Justin Thacker, Matt Kocsis, Ian Snyder, Dustin Poe.
Colin Graber Jason Kohl Jacob Varnau Cameron Young ECE 477 Design Review Team 2 - Spring 2015 R.I.S.K.
ECE 477 DESIGN REVIEW TEAM 3  SPRING 2015 Garrett Bernichon Bryan Marquet John Skubic Tim Trippel.
ECE 477 Design Review Team 5  Spring 2010 Fred Grandlienard Andrew Gregor Kevin Mohr Ryan DeFord.
ECE 477 Design Review Group 9  Fall 2005 Paste a photo of team members here, annotated with names of team members. Tim Miller Clif Barnes Drew Heinrich.
Treasure Chess ECE 477 Team 2 - Spring 2013 Parul Schroff, Brock Caley, Sidharth Malik, Jeremy Stork Design Review.
ECE 477 Design Review Team 10  Spring 2009 Scott Shaw Hussain Vasi Matt Sbai John Fawcett.
ECE 477 Design Review Team 2  Fall 2006 Wirelessly Integrated Menu System (WIMS) Ryan Coppa Lee Bush Aaron Replogle Neil Bedwell.
ECE 477 Design Review Group 5  Spring Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 DESIGN REVIEW TEAM 14  SPRING Project Overview  Target Audience: Amateur Musicians  Obtain a “Guitar Tab” format of music  View Tabs.
ECE 477 Design Review Team BOAR  Fall 2011 Paste a photo of team members here, annotated with names of team members. Left to Right:
ECE 477 Design Review Team 1  Spring 2009 Paste a photo of team members here, annotated with names of team members.
ECE 477 Design Review Group 3  Spring 2005 “VoIP Connect” Ankur TrushalAshish Dushyant.
ECE 477 Digital Systems Senior Design Project  Fall 2008
ECE 477 Design Review Team 21 - Spring 2013
ECE 477 Design Review Group 3  Fall 2005
ECE 477 Design Review Team 6 - Spring 2012
ECE 477 Design Review Group 6  Fall 2005
ECE 477 Design Review Group 10  Spring 2005 I, Robotic Waitress
Ashley Callaway Pat Doherty Nikeshia Ebron Leo Romanovsky
ECE 477 Design Review Group 10  Spring 2005 I, Robotic Waitress
ECE 477 Design Review Team 14  Spring 2012
ECE 477 Final Presentation Team 3 – Fall 2008
ECE 477 Design Review Team 5  Fall 2006
ECE 477 Design Review Team ??  Fall 2012
Presentation transcript:

ECE Grande ECE 477 Design Review Team 3 - Fall 2008

Introduction Ashley Callaway Pat Doherty Nikeshia Ebron Leo Romanovsky Nikeshia Ebron Leo Romanovsky Ashley Callaway Pat Doherty

Outline Project overview Project-specific success criteria Block diagram Component selection rationale Packaging design Schematic and theory of operation PCB layout Software design/development status Project completion timeline Questions / discussion

Project Overview The ECE Grande is a digital poker game table. All personal player information is digitally stored The table will consist of 4 player stations Central community screen to display community information Web server to display the current game status on a remote computer

Project-Specific Success Criteria I. An ability to authenticate users using an RFID tag II. An ability to transmit/export the current game state via a TCP/IP connection III. An ability to display each player’s information on individual LCD screen and community information on a central screen.

PSSC – cont. IV. An ability to run a multi-player No-Limit Texas Hold’em game. V. An ability to interface with a distributed network of microcontrollers to control graphic LCDs and receive user input.

Block Diagram

Component Selection Rationale Master Microcontroller : MC9S12NE64 Embedded web server – TCP/IP protocol 80 I/O pins Alternative: PIC18/Rabbit Slave Microcontroller : MC9S12GC Same manufacturer as master 48 I/O pins SPI port for communication with master Alternative : PIC18

Component Selection Rationale RFID Reader An ability to turn antenna on and off Alternative : SparkFun LCDs Cost No negative voltages required for operation Alternative : negative voltage CrystalFontz

Package Design Dimensions 4ft wide (front); 6.5ft wide (back); 2.5ft (angled side); 2.16ft deep; 4in (height) 4in X 3in recessions for each player LCD covered by Lexan 41.5 lbs Material 2x4 Pressure Treated Lumber ¼” Plywood Standard Green Poker Felt Lexan Constraints Cost - $50.00

Packaging Design

Schematic/Theory of Operation Microcontroller Master (25MHz) Slave (16MHz) RFID 5V operation voltage 1 SCI Port and 1 GPIO Level Translator Tx0104 (3.3V – 5V) Ethernet Transformer RJ45 connected directly to microcontroller

LCD CrystalFontz CFAL12864L-Y-B2 3.3V operation voltage 90mA current draw Buttons Terminal Microswitch pushbuttons Send signals to slave microcontroller Will require 3 general I/O pins Schematic/Theory of Operation

Power Supply 9V wall wart Linear Regulators: (9V to 5V) and (9V to 3.3V) Headers LCD Push Buttons Level Translators

Schematic – Power and Control

Schematic – Master-Slave

Schematic - RFID

Schematic - Master

Schematic - Slave

PCB – Master Design Bypass Capacitor Kept close to power sources Located underneath Ethernet Adaptor Power Divided by operating voltages (5V right side – 3.3V left side)

PCB Layout - Master

PCB – Slave Design Bypass Capacitor Kept close to power sources Headers Placed around board edges for easy access

PCB Layout - Slave

Software Design/Development Status RFID development Drivers being written Poker Logic Algorithm Assigns a numeric score to a given passed in poker hand Hand will consist of 7 cards (2 in hand, 5 community cards), score will be given based on best 5 card combination in hand. Winners are determined by comparing players hand score. LCD Interfacing

Part Status Microcontroller (arrived) LCD (arrived) Ethernet Port (to be ordered) Crystals (to be ordered) Level Translator (arrived) Development board (arrived) RFID Reader & Tags (arrived)

Project Completion Timeline

Questions