Black Belt Project Storyboard Template

Slides:



Advertisements
Similar presentations
P D S A REVIEW ACT PLAN STUDY DO Plan Continuous Improvement
Advertisements

Project Storyboard Template
Supercharging DMAIC IT’S TIME TO USE THE POWER OF THE COLLECTIVE MIND.
Lean Sigma Overview and its Significance to Project Management Harjit Singh, PMP
Overview of Lean Six Sigma
Barry Murash MBBit Nortel 2007
Overview of DMAIC A Systematic Framework for Problem Solving
1. 2 What is Six Sigma? What: Data driven method of identifying and resolving variations in processes. How: Driven by close understanding of customer.
Managing Project Quality
Intro to LSS1 LSSG Green Belt Training Introduction to Lean Six Sigma.
Do not put content on the brand signature area Basic template Subtitle Location – Date Name of the speaker Job title.
1 Industrial Design of Experiments STAT 321 Winona State University.
Black Belt Level DMAIC Certification Checklist
1 Russ Albright, Director. 2 Overview Vision and motivation What is Six Sigma?
Everyone Has A Role and Responsibility
Greater Cincinnati Lean Improvement Consortium
Welcome to Lean Six Sigma Green Belt Training
11 Explanation to Participants about this template and final presentation This template is meant as a Six Sigma / Re engineering Submission Template This.
ASQ Raleigh ASQ Raleigh Section 1113 Six Sigma SIG DMAIC Series.
Practical Assessment Project Template
Define Tollgate Checklist
STEP 1: DEFINE THE PROBLEM Problem Statement: What is the problem? A problem is a discrepancy between a standard and the current situation. The ‘standard’
Copyright © Six Sigma Academy International LLC All Rights Reserved Introduction To Measure.
TEPM 6304: Quality Improvement in Project Management Project Quality Management & Course Overview.
Lean Six Sigma Project Briefing Type Briefer Organization Here
The Value Driven Approach
1 LSSG Green Belt Training Improve: How do we get there?
© 2002 Six Sigma Academy Eliminate Waste Reduce Variability Growth Six Sigma Elements Six Sigma is a business philosophy that employs a client-centric,
Lean Six Sigma Executive Overview
Black Belt Project Storyboard Template Can be used in combination with Black Belt Storyboard Submission Guide Visit GoLeanSixSigma.com for more Lean Six.
Last Updated: MONTH, YEAR Team: M. W. (Team Leader)R. F. T. D.M.G. T. L.D. J. (Sponsor) Green Belt Project Objective: TITLE Green Belt Project Objective:
Sponsor Checklists Sponsor Checklists Lean Six Sigma Group Lean Six Sigma Tollgate Checklists.
Measure Phase Wrap Up and Action Items. Measure Phase Overview - The Goal The goal of the Measure Phase is to: Define, explore and classify “X” variables.
Define Phase Wrap Up and Action Items. Define Phase Overview—The Goal The goal of the Define Phase is to: Identify a process to improve and develop a.
Analyze Wrap Up and Action Items
CPI Event / Project Tollgate Template
TM 720: Statistical Process Control DMAIC Problem Solving
The DMAIC Method
Lean Six Sigma Road Map Improvement Process Road Map
LEAN SIX SIGMA PROJECT TEMPLATE
Green Belt Project Storyboard Template See Green Belt Storyboard Checklist for required contents Visit GoLeanSixSigma.com for more Lean Six Sigma Resources.
Lean Six Sigma DMAIC Improvement Story
Lunch Order Cycle Time Project Storyboard Bahama Bistro Example
Improving Existing Products & Services
Pick-Up Order Lead Time Project Storyboard The Bahama Bistro Sample Storyboard Visit GoLeanSixSigma.com for more Lean Six Sigma Resources.
Black Belt Project Storyboard Template Can be used in combination with Black Belt Storyboard Submission Guide Visit GoLeanSixSigma.com for more Lean Six.
Define Phase Wrap Up and Action Items
Practical Assessment Project Template
Lean Six Sigma DMAIC Improvement Story
DMAIC Project Template
OPS/571 Operations Management
Black Belt Project Storyboard
Lean Six Sigma DMAIC Improvement Story
Framework for Success: DMAIC
Explanation to Participants about this template and final presentation
LEAN SIX SIGMA PROJECT TEMPLATE
LEAN SIX SIGMA PROJECT TEMPLATE
Project Champion: Process Owner: Organization: Project Location:
and its applications to improve animal welfare during transportation
DMAIC STANDARD WORK TEMPLATE
Green Belt Project Storyboard
DMAIC STANDARD WORK TEMPLATE
Green Belt Project Storyboard
Measure Phase Wrap Up and Action Items
CPI Event / Project Tollgate Template
Lean-Green belt six sigma program
Practical Assessment Project Template – DMADV
Six Sigma (What is it?) “Six sigma was simply a TQM process that uses process capabilities analysis as a way of measuring progress” --H.J. Harrington,
Presentation transcript:

Black Belt Project Storyboard Template Visit GoLeanSixSigma.com for more Lean Six Sigma Resources

Storyboard: The 5 Tenets Tell Your Story Make sure the flow is logical and the pictures do most of the work – make it clear to the reader what you learned at each step Use the Tools Show that you understand the DMAIC method and made good use of the tools and templates available to you Label Your Graphs List the metric name, the time frame and the takeaways for each chart Show the Improvement Make accomplishments clear – list each waste reduction, savings, revenue increase, cycle time reduction and customer satisfaction Use the Appendix Save back-up documentation, reference material and any extra graphs and tools in case readers would like more information

Questions & Activities to Address: Executive Summary Questions & Activities to Address: Use the Executive Summary template Business Case: List the Business Case or Problem Statement from the Project Charter Goal: List the Goal Statement from the Project Charter Finding Highlights: List a bulleted list of Quick Wins, discoveries and other improvements that resulted from the project Results: List the project savings, gains, cost avoidance, cycle time reduction, customer satisfaction, etc.

Key Words List all words and acronyms that are specific to your industry and key to understanding your project Provide a brief description or definition of each term List in alphabetical order Keep in mind that this document will be viewed by those who are not in your industry or familiar with your process or industry

Questions & Activities to Address: Define Phase Questions & Activities to Address: How and why the project was selected? Who was the customer and what did they require? Was the process data or process driven? What kind of map did you use (Swimlane, Value Stream, etc.) Did you complete an 8 Wastes assessment of the process? Did you complete a 5S Assessment (or in the Improve Phase)?

Potential Define Visuals Project Charter or A3 SIPOC Swimlane Process Map, Value Stream Map, other VOC Translation Matrix Primary Metric Chart (Baseline data if available) 8 Wastes Checksheet 5S Transactional Assessment 5S Manufacturing Assessment

Define Phase Tollgate Verify the project has a Champion/Sponsor and leadership backing Get approval from a finance partner for the potential savings or projected revenue Complete the elements of the Project Charter Collect the Voice of the Customer and uncover any unknown requirements Make customer requirements measurable Create a high-level map of the process Facilitate a team a Process Walk Develop and verify a detailed map of the process Conduct Stakeholder Analysis and develop an influence and communication plan

Questions & Activities to Address: Measure Phase Questions & Activities to Address: What was the approach to Data Collection? (Who measured, when, for how long?) What was the approach taken to validate that data collection method produces accurate results? (Measurement Systems Analysis?) What is the understanding of the process baseline(s) measures and what is the gap between the baseline and the goal? What were the results of the Process Walk? What is the understanding of the potential issues?

Potential Measure Visuals Data Collection Plan Operational Definitions Efficiency and Effectiveness Matrix Sample Data Collection Sheet – Checksheet used Results of Measurement Systems Analysis (MSA, Gage R&R) Graphic Display of Baseline Data - Time Series Plots, Control Charts, Box Plots, Histograms, etc. “Before” Work Area Layouts Photos, diagrams, Spaghetti Charts Include distance travelled and time involved Cost Of Poor Quality (COPQ) Calculations Threats & Opportunities Matrix

Measure Phase Tollgate Select Baseline Measurements Develop a Data Collection Plan with Operational Definitions, stratification factors and checksheets if needed Develop a Sampling Plan and calculate data needs Conduct measurement systems analysis Collect Baseline Data Determine Process Capability Update Project Charter and inform Stakeholders

Questions & Activities to Address: Analyze Questions & Activities to Address: What was the approach to process and data analysis along with key insights? Provide the list of prioritized root causes (critical Xs and their impact on Y or primary metric) What are the Hypothesis Statements – Null and Alternative? What were the results of Hypothesis Testing? Were there any Quick Wins and if so what were the results?

Potential Analyze Visuals Fishbone Diagram Value Cycle Time Analysis – wait time vs. work time Value Stream Map Hypothesis Testing Plan Root Cause Hypothesis Worksheet Hypothesis Test Results Graphs that show relationships or findings (e.g. Box Plots, Pareto Charts, Histograms, Time Series Plots, Control Charts, etc.)

Analyze Tollgate Checklist Conduct Value and Cycle Time Analysis of the process to identify opportunities to reduce waste Identify root causes using data analysis, process maps, Five Whys and Fishbone Diagrams Develop a Root Cause Hypothesis and formal hypothesis statements Collect data to run statistical tests and prove or disprove Root Cause Hypotheses Check if the team has enough confidence in the analysis to move to the Improve Phase Update the Project Charter and inform Stakeholders

Questions & Activities to Address: Improve Questions & Activities to Address: Provide a list of improvements made and to-be made Describe the approach to prioritizing and selecting solutions that eliminated root causes Barriers and efforts to overcome them Mistake-proofing and other risk management methods employed Pilot results and changes made to solutions Describe the Implementation Plan and results

Potential Improve Visuals 5S Transactional Assessment 5S Manufacturing Assessment Impact Effort Matrix Weighted Criteria Matrix Final Workplace Layout (updated Spaghetti Chart) Cross Training Matrix Training Plan Pilot Plan FMEA Implementation Plan Graphic display of change to Primary Metric (before and after) Future State Map

Questions & Activities to Address: Control Questions & Activities to Address: How the project will be monitored and what are the Response Plans? Who is doing the monitoring, how often and how Are the Trigger Measures based on Control Charts? Will there be ongoing 5S inspections? Describe the Control Plan that ensures the gains are maintained over the long term What documentation and standardization has been completed regarding the improved process? What visual management techniques will ensure adoption of process changes? (include pictures where appropriate) How will you demonstrate improved process performance over baseline? Control Charts, other How has the Process Owner been prepared for hand-off and what is the Communication Plan? What were the lessons learned?

Potential Control Visuals Monitoring Plan Response Plan Control Plan Control Chart and/or other graphical tacking methods New Procedure Audit Communication Plan Innovation Transfer Opportunities Executive Summary

Appendix In the appendix, include any supporting documentation, process maps and data charts that you may use in your panel review to respond to questions or provide evidence of tool applications. Visit GoLeanSixSigma.com for more Lean Six Sigma Resources