TYPE, PLACE AND CONTENT OF THE CONDITIONS IN A PERMIT BOYKO MALINOV BULGARIA.

Slides:



Advertisements
Similar presentations
High Level Group on Administrative Burdens 5 th March 2009 Administrative Burden Reduction in DG Environment Timo Mäkelä European Commission – DG Environment.
Advertisements

Environmentally sound management of ship recycling- simple or complex? Roy Watkinson Department for Environment, Food and Rural Affairs UK Promoting Sustainable.
© European Communities, 2007 Purpose The European Integrated Pollution Prevention and Control Bureau (European IPPC Bureau) of the JRC/IPTS was set up.
Pagina 1 de 3 CEPSA Química QUIMICA Palos de la Frontera Jul 12 th, 2012 CEPSA QUIMICA PALOS DE LA FRONTERA IPPC DEVELOPMENT.
Industrial Pollution Control - Harmonization and Implementation in Bulgaria Slavitza Dobreva Ministry of Environment and Water Bulgaria Final Seminar.
Environmental Management System (EMS)
Industrial Pollution Control and Risk Management: IPPC Neil Emmott Environment Directorate-General 7 April 2006.
Law approximation and implementation in Hungary Ministry for Environment Department of Integrated Pollution Control Nicosia, May 2001 Andrea Nám, desk.
BULGARIAN COMPETENT AUTHORITIES IN THE FIELD OF IPPC Kalin Iliev Ministry of Environment and Water Bulgaria.
GReening business through the Enterprise Europe Network EN Giovanni FRANCO European Commission Enterprise and Industry EN
The IPPC Recast. New environmental requirements for explosives production sites.
Grupowa Oczyszczalnia Ścieków Łódzkiej Aglomeracji Miejskiej Fot: U. Czapla Practical aspects of compliance with the Integrated Permit requirements based.
Harmonization and Implementation/Enforcement of Environmental Legislation in the field of Industrial Pollution Control in Latvia Ilze Kirstuka Director.
ECENA 4 th Exchange Programme Cluj Napoca, October, 2005 National Updates in the Transposition and Implementation of IPPC directive Ministry of Environment.
IPPC IN MINING AND METALLURGY IN THE REPUBLIC OF MACEDONIA Bosko Nikov
ENVIRONMENTAL MANAGEMENT SYSTEMS. ENVIRONMENTAL ISSUES Global Warming Climate Change Ozone Layer Resource Depletion Population Growth Waste Disposal Effects.
U.S. ARMY AVIATION CENTER OF EXCELLENCE EMS General Awareness Training Updated DEC09.
ISO Standard is based on the management model of plan – do - check – act. Today we all be discussing the elements of the standard that deal with.
The IPPC Directive and EPER Iksan van der Putte. Objectives of IPPC (Integrated Pollution Prevention and Control) To prevent or minimise emissions To.
W504 - Management of asbestos containing materials.
1 Inspection of LCPs: System for Inspection. ECENA Training Workshop Bristol, March 2008.
BAT as a main tool for minimisation of the negative impact of industrial activities Aivi Sissa Tallinn – Estonia 27 – 28 March 2008.
BCE Environmental Engineering Introduction to Environmental Engineering Mdm Nur Syazwani binti Noor Rodi.
Ship Recycling Facility Management System IMO Guideline A.962
Workshop, 12/3/2004 Banska Bystrica – SLOVAC REPUBLIC “INTEGRATED LICENCE PROCEDURE (Greek case)” Katerina Iakovidou-Anastasiadou Hellenic Ministry for.
Berlin, Joint -Meeting, 28. Sept Helmut Döhler IPPC / IED Directive and Seville-Process.
BULGARIAN APPROACH TO THE BAT IN THE IPPC PERMITTING BOYKO MALINOV MINISTRY OF ENVIRONMENT AND WATER BULGARIA.
Economic and Cross Media aspects Bo Jansson Swedish Environmental Protection Agency
IPPC Directive state of play and future developements
Fichtner Consulting Engineers UK Covanta Energy Ltd Content of Environmental Permit Application Nick Gamble.
TRANSPOSITION AND IMPLEMENTATION OF THE IPPC, LCP, SEVESO II, VOC DIRECTIVES – EXPERIENCE AND LESSONS LEARNT Kalin Iliev Nikolay Savov Ministry of Environment.
Application of minimum criteria for environmental inspections in Bulgaria.
TBT 14: Permit Compliance HILLS’ ETHOS: IMPROVEMENT ENGAGEMENT PREVENTION ACCOUNTABILITY PROGRESSIVE FRONT FOOT ROLES AND RESPONSIBILITIES HWS – Toolbox.
Emission control in Bulgaria The involved institutions at national and local (sub-national) levels in Emissions inventory are Ministry of Environment.
The IPPC Directive and its implementation Alexandre Paquot European Commission Environment Directorate-General Phare Capacity.
Ministry of Waters and Environmental Protection, ROMANIA 1 BERCEN 1 st Exchange program – November 2002 Croatia PROBLEMS AND SOLUTIONS IN COOPERATION.
1 Permitting of industrial facilities in Croatia.
ECENA First Plenary Meeting January, 2006 Zagreb, Republic of Croatia Forthcoming obligation related to implementation and enforcement of EU legislation.
The Process of Development of IPPC Legislation Robert Sarlamanov MA, IPPC Expert Ministry of Environment and Physical Planning, Bercen Exchange Programme,
CONTROL Environmental protection act Boyko Malinov Ministry of environment and water Bulgaria.
Implementing legislation for Integrated Permitting Monika Pribylova 1 October 2013 года Air Quality Governance in the ENPI East Countries.
1 Review of the Integrated Pollution Prevention and Control (IPPC) and National Emission Ceilings (NEC) Directives Marianne Wenning DG ENV, Head of Unit,
PERMIT ISSUANCE SYSTEM IN CROATIA ENVIRONMENTAL REVIEW Authors: Jasna Paladin-Popović Iva Milić Štrkalj Renata Sinovčević Brijuni, 27 November /21/02Croatia.
Strengths and weaknesses of the permitting system and enforcement process in RIEW – Veliko Turnovo Regional Inspectorate of Environment and Water - Veliko.
Recommendation of the European Parliament and of the Council of 4 April 2001 providing for Minimum Criteria for Environmental Inspections in the Member.
Presentation to Association Municipalities of Ontario Implementation of Management of Excess Soil - A Guide for Best Management Practices Ministry of the.
1 Short overview of the implementation of IPPC, LCP, Seveso II, Waste Landfill and Incineration directives Short overview of the implementation of IPPC,
CROATIA Country Report IPPC Directive: implementation, problems, constraints, open questions,… Anita Pokrovac Patekar, B. Sc. Pharm. Ministry of Environmental.
Checking and Corrective Action EPA Regions 9 & 10 and The Federal Network for Sustainability 2005.
ECENA NETWORK Study tour Denmark Standard condition by Lars Christensen.
Jerzy Jendrośka Decisions on proposed activities not listed in annex 1 of the Convention (article 6 paragraph 1 (b) of the Convention) Task Force on Public.
The SEEA revision Key issues and outcomes Mark de Haan.
1 Review of the IPPC Directive and related legislation Second Meeting Of Working Group E On Priority Substances 17 October 2007 Filip FRANCOIS – DG ENV.
Agriculture Mechanics as a Profession Mechanics A branch of physics that deals with motion and the action of forces on bodies.
Visit us at E mail: Tele:
Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 1 The IPPC Directive Introduction to the philosophy Rob Kramers.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 27 – Environment Bilateral screening:
© INTECHNICA Energy efficiency assessment Systematic Approach to Green Production Energy Efficiency Assessment Supported by: The sole responsibility.
Introduction to the philosophy
BAT - BREF Their scope Rob Kramers Senior advisor InfoMil.
A Step by step guidance for permitting and inspection
Mr. Nepimach Czech Ecological Institute
Environmental Management Systems The ISO Approach Initial Environmental Review & Gap Analysis Presented by: NC Division of Pollution Prevention.
Expert Advisory Forum on priority substances
Cristian Gomez Head, Validation Group, Space Services Division, ITU-R
Reduction of total releases from unintentional production of POPs
Towards an improved policy on industrial emissions Third Meeting Of Working Group E On Priority Substances 3 March 2008.
Introduction to the first meeting of the IPPC Review Advisory Group
EEB 2017 report ‘BURNING: THE EVIDENCE’
Industrial Emissions Directive Targeted stakeholder survey
Presentation transcript:

TYPE, PLACE AND CONTENT OF THE CONDITIONS IN A PERMIT BOYKO MALINOV BULGARIA

HISTORY DIRECTIVE REQUIREMENTS BULGARIAN LEGISLATION POTENTIAL INTERACTION INDUSTRIAL ACTIVITY- ENVIRONMENT EUROPEAN EXPERIENCE BULGARIAN VISION FOR MANAGEMENT SEQUENCE PILOT PERMITING – 14 PERMITS, LOOKING DIFERENTLY, EMS, GLOSSARY, INTERPRETATION

WHY DID WE NEED A METHODOLOGY? PRIORITY OF THE PREVENTION BEFORE AFTERACTION BROAD INFORMATION IS SORTED OUT HEAVY LEGISLATIVE REQUIREMENTS TO BE REFLECTED INSUFFICIENT EXPERIENCE IN THE AUTHORITY PREDICTABILITY OF THE PERMIT’S REQUIREMENTS SHORT DEADLINES FOR ISSUANCE OF PERMITS

WHAT DOES IT CONTAIN? 16 CHAPTERS COMMON SPECIALIZED DECISION OUTLOOK FRONTAL PAGE OF THE PERMIT

IMPORTANT COMMON CHAPTERS SCOPE OF THE INSTALLATIONS PERMIT’S BOUNDARIES – CHANGES IN THE INSTALLATIONS INTERPRETATION OF COMPLIANCE – WATER, ENERGY, MATERIALS, ABATEMENT EQUIPMENT

IMPORTANT SPECIALIZED CHAPTERS USE OF RESOURCES – WATER, ENERGY, MATERIALS WASTE PRODUCTION AND TREATMENT ACCIDENTS –PLANS ABNORMAL OPERATION CLOSURE OF THE OPERATION EMISSIONS: - AIR - WATER-SURFACE AND GROUND - SOIL - NOISE

MANAGEMENT SEQUENCE STANDARDS: IN AND OUT RESPONSIBLE EQUIPMENT – HEAT/WATER EXCHANGERS, ABATEMENT CONTROLED PARAMETERS MAINTAINANCE OF THE OPERATION / REPAIR WORKS MONITORING REGULAR CHECK OF COMPLIANCE WITH THE STANDARDS (INTERPRETATION) CORECTIVE MEASURES RECORDS AND REPORTS OF THE COMPLIANCE

INTERACTION WITH OTHERS GUIDANCE FOR SITE-SPECIFIC BAT DETERMINATION GUIDANCE ON THE FILLING OUT THE APPLICATION EMS GUIDANCES EPER IMPLEMENTATION GUIDANCE ANNUAL REPORT GUIDANCE WASTE WATER PERMIT GUIDANCE WASTE TREATMENT/TRANSPORTATION GUIDANCE MONITORING GUIDANCES

TYPE, PLACE AND CONTENT OF THE CONDITIONS IN A PERMIT END