WPM What’s behind the icon? Work Programme Management.

Slides:



Advertisements
Similar presentations
SEM10-04 Initiation of a Work Item ETSI Seminar © ETSI All rights reserved.
Advertisements

The MCC Specs database A guided tour. The Specifications panel …
Use this guide to help you schedule, modify, lookup and delete hearing blocks Click on the buttons to the right to discover more about their functionality.
© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009© 3GPP GPP The Training Course / Module 10 1 All you always wanted to know about.
7 Feb 2000JMM1 Editing a GSM spec - tips for experts.
MCC 3G and GSM Specification Handling Ian Doig, MCC.
Accessing and Using the e-Book Collection from EBSCOhost ® When an arrow appears, click to proceed to the next slide at your own pace. To go back, click.
CPIT 102 CPIT 102 CHAPTER 1 COLLABORATING on DOCUMENTS.
Basic Response Letter Last Updated Basic Response Letter The response redesign in SERFF 5.6 introduces the concept of inline schedule item.
JJCO Online System MANUAL for Associate Editors. Table of Contents 1.Log In 2.Main Menu 3.Associate Editor Dashboard 4.Checking MS 5.Reviewer Selection.
Chapter 10—Creating Presentations
Calendar Browser is a groupware used for booking all kinds of resources within an organization. Calendar Browser is installed on a file server and in a.
The Online Activities Module OAM Describing the F-7 & F-7A.
WebCT CE-6 Assignment Tool. Assignment Tool and Assignment Drop Box Use “Assignment” button under Course Tools (your must be in “Build” mode) to: –Modify.
Start the slide show by clicking on the "Slide Show" option in the above menu and choose "View Show”. or – hit the F5 Key.
6 th Annual Focus Users’ Conference Custom Reports and Dashboards Presented by: Mike Morris.
STAR PORTAL GRADEBOOK. Let’s Get Into the Gradebook! At the Teacher Schedule page, click once on the Gradebook link to open to the page for the corresponding.
ShelterPoint™ Data-Entry Workflows. ShelterPoint v5.2.3.
Start the slide show by clicking on the "Slide Show" option in the above menu and choose "View Show”. or – hit the F5 Key.
Start the slide show by clicking on the "Slide Show" option in the above menu and choose "View Show”. or – hit the F5 Key.
Downloading and Installing PAF Insight PAF Insight can be easily downloaded Or can be installed from a CD A license is needed t0 activate the program.
Start the slide show by clicking on the "Slide Show" option in the above menu and choose "View Show”. or – hit the F5 Key.
NextGen Trustee Department Disbursements This class will cover the various methods of handling department disbursements. Whether entering them manually.
To add an encounter manually, click on “Add”. To upload an electronic file of encounters, click on “Data Transfer” and then “Upload.” See separate training.
Address Refer to Slide 2 for instructions on how to view the full-screen slideshow.Slide 2.
Login Screen: Login Screen is the first screen. We need to enter valid user name and password to login into colleges main dashboard. Enter valid user name.
4-H Leader Training 4-H On-Line Orientation. The Basics of 4-H Online 4-H Online is located at: There are help sheets for members,
eOrders inventory ordering software! Introduction Use easy functions, letting you order products that you need automatically. Use easy functions, letting.
PPS/OPTRS Departmental Roles Structure System Presented by Payroll Services.
Online Training for TEXAS TECH UNIVERSITY and TEXAS TECH HSC Hiring Managers Employment Office April 2003.
Open Internet Explorer Go to: my.ccsd.net Type YOUR InterAct username and password. Then Submit Query.
Start the slide show by clicking on the "Slide Show" option in the above menu and choose "View Show”. or – hit the F5 Key.
Course # PEMS Version 2.0 Upgrades. Unit 8 PEMS Version 2.0 Upgrades Several improvements to PEMS application  Improvements based on: - Change.
Nursing Library Training using Sunrise Press data.
Limits From the initial (HINARI) PubMed page, we will click on the Limits search option. Note also the hyperlinks to Advanced search and Help options.
FIX Eye FIX Eye Getting started: The guide EPAM Systems B2BITS.
Copyright 2007, Paradigm Publishing Inc. ACCESS 2007 Chapter 3 BACKNEXTEND 3-1 LINKS TO OBJECTIVES Modify a Table – Add, Delete, Move Fields Modify a Table.
The change control cycle Or Where little 3GPP specifications come from … Move to next slide.
Darek Sady - Respondus - 3/19/2003 Using Respondus Beginner to Basic By: Darek Sady.
Videos, the More Tag, Permalinks, and Shortlinks.
WorkManager Concepts & Schema Course Outline The Old “Business Rules” Traditional LBNL CAD Method New “Business Rules” Engineering Data Management WorkManager.
Internal and Confidential Cognos CoE COGNOS 8 – Event Studio.
MCC 3GPP Work program Database Ian Doig, MCC. 3GPP Work program Database Request by Partner Organisations for a common 3G Work program Database. Based.
Office of Housing Choice Voucher Program Voucher Management System – VMS Version Released October 2011.
Microsoft PowerPoint 2007 Part 1. Agenda Formatting Presentation Text I Formatting Presentation Text II Editing and Proofing Text Using the Outline Tab.
Click to edit Master text styles –Second level Third level –Fourth level »Fifth level 1 WPM What’s behind the icon? Work Programme Management.
Complete Ordering System for Promotional Literature and Samples Quick Reference and Training Guide.
When you first enter the Automation Rules process, there may be no rules listed. In that case the view may appear as shown below and you will have three.
Milestone Plans (MP) track Procurement Action Lead Times (PALTs) for a variety of procurement actions from new awards to closeout. PRISM MPs are based.
Access Queries and Forms. Adding a New Field  To insert a field after you have saved your table, open Access, and open the table  It is easier to add.
The lifecycle of a GSM spec Or All you ever wanted to know about where little GSM specs come from.
Invoices and Service Invoices Training Presentation for Raytheon Supply Chain Platform (RSCP) April 2016.
© 2008 MediServe, Inc. All Rights Reserved.MediServe Confidential 1 Guided Practice Exercises Systems Training Charting October 2009.
Create eInvoices Training Presentation for Supply Chain Platform: Rolls-Royce February 2014.
Online Recruiting System Hiring Manager Presentation This presentation will take about 15 minutes. Click on your mouse to go to the next slide OR click.
HTBN Batches These slides are intended as a starting point for further discussion of how eTime might be extended to allow easier processing of HTBN data.
© 2015 Ex Libris | Confidential & Proprietary Yoel Kortick Senior Librarian Cataloging introductory flow.
111 State Management Beginning ASP.NET in C# and VB Chapter 4 Pages
AEM Digital Asset Management - DAM Author : Nagavardhan
Helping Yourself in PD2 SPS Spotlight Series July 2015.
Home Page - Can be customized by the user Clicking on preferences in the upper right allows you to customize you home page, this one is set to favorites.
Create a Public Holiday Calendar
Single Sample Registration
Database application MySQL Database and PhpMyAdmin
The lonely road or How a spec gets from WG Secretary to the server, and how it gets published as an ETSI deliverable 1.
HOW TO SUBMIT AN ABSTRACT
PPS/OPTRS Departmental Roles Structure System
AGILENT TECHNOLOGIES RESTRICTED
Home Page - Can be customized by the user Clicking on preferences in the upper right allows you to customize you home page, this one is set to favorites.
Building a healthy nation is what we do. Sidra Supplier Bid Submission.
Presentation transcript:

WPM What’s behind the icon? Work Programme Management

There are three tabs with a variety of fields you can use to select the Work Item records of interest.

Tab 1: fields related to the identity and ownership of the items Reference id Deliverable type / number Responsible committee / working group

Tab 2: sundry fields Title STF Current state (drafting, in Public Enquiry, published, etc.) EC mandate

Tab 3: relational fields and rapporteur Keywords (AND combination possible) Projects (AND combination possible) Rapporteur (editor) name

In addition, it is possible to distinguish between “active” and “stopped” items. “Active” includes completed items (published deliverables) which have not been withdrawn. It is not restricted only to items which are still being worked on.

Click “Duplicate” to create a new WI record based on the present one.

You will be offered this panel.

Deliverable class: “R” indicates a revision of an existing item. Only use “D” for a brand new deliverable document (spec).

Deliverable type: will probably be same as previous: TS = Technical Specification TR = Technical Report

Serial number: use existing value modified according to these rules:

If moving to a new year’s release, increment the number at the end. This shows the major version number. Here we see v7.x.x i.e. release Change this to 8 for a release 1999 spec i.e v8.x.x. 0346Q70346Q8 Rule 1

If providing an update to an existing release, add a suffix R1. If there is already a suffix R1, change it to R2. (Or change R2 to R3, etc..) Here we see v7.0.0 (say) being changed to (say). 0346Q70346Q7R1 Rule 2

Leave the creation date as the current date unless there is some very good reason to change it.

The new WI probably belongs to the same committee. If not, change it as necessary.

You probably wish to make only a single copy. WPM can make multiple copies if you wish.

Normally start with a clean schedule (milestone set) by selecting “Default”.

Check this if there are comments associated with the original record which you want to retain in the new one. Normally, do not copy them.

When you click “Duplicate”, after an ‘are you sure?’ panel, the original WI record is copied, incorporating the changes you required. Click “Update” to make the necessary manual changes to the new record...

These fields will reflect the changes you made whilst making the duplicate record.

You must now update the necessary fields of the new record as shown in the following slides...

The title will be unchanged...

… except for the version and possibly the Release year.

Enter new ‘Scope’ field text. Hint: The scope field describes the work to be undertaken in developing the deliverable. It is not the text of the scope clause of the final document.

Check that the rapporteur identity is correct; enter the new one if not. Hint: If there is no current rapporteur, enter the name of the committee’s support officer.

Verify the Support Officer identity.

The project set will be unchanged, unless the new WI relates to a different release: delete the old release project and add the new.

Clear the pages counts (‘paper’ and ‘soft’).

Add a ‘secretariat’ comment to justify the creation of the new WI. Hint: ETSI rules demand that you furnish four supporting ETSI member organizations in a separate comment. This rule is ‘relaxed’ for SMG and 3GPP!

Most other fields can safely be ignored. Except the ‘schedule’:

You must modify the ‘stock’ schedule proposed by WPM to eliminate irrelevant milestones. You can also add sets of milestones (then delete the ones from the set you don’t want).

You can add individual “user selectable” (code 5S) milestones. You can - and must! - modify the milestone text to describe the step desired.

Remember to fill in the date the event was achieved... … and to indicate the version of the spec at that time.

WPM is also available on the web (read-only):

So much for theory. Now let’s see a worked example...

MCC expert provides a new version of an existing spec. 1

Identify the WPM Work Item which pertains to this spec. You can use the ‘status’ database to help you in this... P:\mcc\Databases\Status_SMG-3GPP-combined_JMM\status_smg_3GPP.mdb Run query jmm_Spec_Search--SMG+3GPP_with_MIs

Find the spec of interest in the list. Take care to choose the correct version. Note that in this instance, no WI yet exists for v so start with the latest of the same Release which does exist.

Take this WI reference (copy it to the clip board if you wish).

Insert (paste) the same WI reference into the “Full Search” field of the WPM “Select Work Item” screen. Click “Find”. The WI appears. Open it.

The WI record opens. (Depending on your screen settings, you may see a multi-tab version of the same thing.) Click “Duplicate” to create a new record for the new version of the spec.

Within WPM, the “Duplicate Work Item” window appears.

Ensure the “Class” is R (for “revision”) Add R1 to the WI reference (or change R1 to R2, etc.).

Ensure the “Technical Body” is correct. Many GSM items have been moved to a WG of a 3GPP TSG. If necessary, change the TB using the pull-down list.

It is normally not useful to copy over the schedule... … or the comments. Click “Duplicate”...

… and confirm the creation of the new WI.

The new WI record is created. Click “Update” to make changes.

(GSM version Release1997) Title: change version no. Scope: indicate CRs at meeting no. CRs at SMG#31. Check rapporteur name. (Type in correction if necessary, and select from list offered if more than one match.) Check Support Officer name. Clear page count.

(GSM version Release1997) CRs at SMG#31. Schedule: eliminate unwanted milestones. Milestones 2 to 7B can be selected... … and deleted.

Schedule: choose US milestone.

Schedule: select “Start of work” milestone. Schedule: click “Insert after”. Schedule: The new US milestone appears. SMG#31 Schedule: Enter free text into milestone.

Schedule: enter the version number resulting from the plenary meeting. Schedule: enter the achieved date for milestones 1 to 8 as the last day of the meeting. Schedule: some (calculated) target dates appear automatically.

Add a comment. Record created. save

- then close

The End !