Determining Optimal Level of Product Availability Optimal Matching of Supply and Demand (III) 【本著作除另有註明外,採取創用 CC 「姓名標示 -非商業性-相同方式分享」台灣 3.0 版授權釋出】創用 CC.

Slides:



Advertisements
Similar presentations
Operations Management Unit 8: Planning Capacity 授課教師: 國立臺灣大學工商管理學系 黃崇興 教授 本課程指定教材為 Operations Management: Processes and Supply Chains, 10th ed., Lee J.
Advertisements

Inventory Management: Safety Inventory (II) 【本著作除另有註明外,採取創用 CC 「姓名標示 -非商業性-相同方式分享」台灣 3.0 版授權釋出】創用 CC 「姓名標示 -非商業性-相同方式分享」台灣 3.0 版 第七單元: Inventory Management:
Operations Management Unit 7: Managing Quality (2) 授課教師: 國立臺灣大學工商管理學系 黃崇興 教授 本課程指定教材為 Operations Management: Processes and Supply Chains, 10th ed., Lee.
Andy Guo Planning Demand and Supply in a Supply Chain 第二單元 (3) : Planning Demand and Supply in a Supply Chain 郭瑞祥教授 【本著作除另有註明外,採取創用 CC 「姓名標示 -非商業性-相同方式分享」台灣.
Inventory Management: Safety Inventory ( I ) 【本著作除另有註明外,採取創用 CC 「姓名標示 -非商業性-相同方式分享」台灣 3.0 版授權釋出】創用 CC 「姓名標示 -非商業性-相同方式分享」台灣 3.0 版 第六單元: Inventory Management:
Operations Management Unit 11: Managing Inventories (2) 授課教師: 國立臺灣大學工商管理學系 黃崇興 教授 本課程指定教材為 Operations Management: Processes and Supply Chains, 10th ed.,
Pricing and Revenue Management in the Supply Chain 【本著作除另有註明外,採取創用 CC 「姓名標示 -非商業性-相同方式分享」台灣 3.0 版授權釋出】創用 CC 「姓名標示 -非商業性-相同方式分享」台灣 3.0 版 第十二單元 (2) : Pricing.
Determining Optimal Level of Product Availability Optimal Matching of Supply and Demand (III) 【本著作除另有註明外,採取創用 CC 「姓名標示 -非商業性-相同方式分享」台灣 3.0 版授權釋出】創用 CC.
新生講座 8.Reading Critically : Be a critical reader
1 Self Knowledge 自我知識 第六單元: Historical background: Locke 歷史背景 : 洛克 梁益堉 教授 【本著作除另有註明外,採取創用 CC 「姓名標示 -非商業性-相同方式分享」台灣 3.0 版授權釋出】創用 CC 「姓名標示 -非商業性-相同方式分享」台灣.
Designing the Distribution Network in a Supply Chain 【本著作除另有註明外,採取創用 CC 「姓名標示 -非商業性-相同方式分享」台灣 3.0 版授權釋出】創用 CC 「姓名標示 -非商業性-相同方式分享」台灣 3.0 版 第十二單元 (3) : Designing.
計算機程式 第十一單元 Operator Overloading I 授課教師:廖婉君教授 【本著作除另有註明外,採取創用 CC 「姓名標示 -非商業性-相同方式分享」台灣 3.0 版授權釋出】創用 CC 「姓名標示 -非商業性-相同方式分享」台灣 3.0 版 本課程指定教材為 C++ How to.
建立使用案例敘述 --Use Case Narrative
From: BOOKS ONLINE 1 Safari Tech Books Online Safari Business Books Online 電子書資料庫.
長訊科技 EVRCOM Voice Mail System 使用者操作說明及流程. 自動總機 -- 來電語音轉接服務流程 ( 範例流程 )
資訊教育 吳桂光 東海大學物理系助理教授 Tel: 3467 Office: ST223 Office hour: Mon (10:30-12am) or by appointment.
網站流量分析工具 Google Analytics 指 導 老 師 : 吳 有 龍 進修資管 4B B 進修資管 4B B 李 汪 書 李 汪 書.
2010 MCML introduction 製作日期: 2010/9/10 製作人 : 胡名霞.
© 2005 Wiley1 Chapter 4 – Supply Chain Management Operations Management by R. Dan Reid & Nada R. Sanders 2 nd Edition © Wiley 2005 PowerPoint Presentation.
概念性產品企劃書 呂學儒 李政翰.
1 © 2011 台灣培生教育出版 (Pearson Education Taiwan). 2 學習目標 1. 當面對可預測的變異性時,同步管理並改善供應鏈 中的供給。 2. 當面對可預測的變異性時,同步管理並改善供應鏈 中的需求。 3. 當面對可預測的變異性時,使用總體規劃將利潤最 大化。
資訊教育 吳桂光 東海大學物理系助理教授 Tel: 3467 Office: ST223 Office hour: Tue, Fri. (10-11am)
Designing the Distribution Network in a Supply Chain 【本著作除另有註明外,採取創用 CC 「姓名標示 -非商業性-相同方式分享」台灣 3.0 版授權釋出】創用 CC 「姓名標示 -非商業性-相同方式分享」台灣 3.0 版 第十 三單元 (1) :
Inventory Management: Cycle Inventory 【本著作除另有註明外,採取創用 CC 「姓名標示 -非商業性-相同方式分享」台灣 3.0 版授權釋出】創用 CC 「姓名標示 -非商業性-相同方式分享」台灣 3.0 版 第四單元: Inventory Management:
© McGraw-Hill Companies, Inc., McGraw-Hill/Irwin.
Sourcing Decisions in a Supply Chain 【本著作除另有註明外,採取創用 CC 「姓名標示 -非商業性-相同方式分享」台灣 3.0 版授權釋出】創用 CC 「姓名標示 -非商業性-相同方式分享」台灣 3.0 版 第十一單元 : Sourcing Decisions in.
Supply Chain Coordination & Information Integration 》【本著作除另有註明外,採取創用 CC 「姓名標示 -非商業性-相同方式分享」台灣 3.0 版授權釋出】創用 CC 「姓名標示 -非商業性-相同方式分享」台灣 3.0 版 第七單元 (2) : Supply.
Chapter 8 Integrating the supply chain
Andy Guo Planning Demand and Supply in a Supply Chain 【本著作除另有註明外,採取創用 CC 「姓名標示 -非商業性-相同方式分享」台灣 3.0 版授權釋出】創用 CC 「姓名標示 -非商業性-相同方式分享」台灣 3.0 版 第三單元 (1) : Planning.
計算機程式 第十四單元 Polymorphism 授課教師:廖婉君教授 【本著作除另有註明外,採取創用 CC 「姓名標示 -非商業性-相同方式分享」台灣 3.0 版授權釋出】創用 CC 「姓名標示 -非商業性-相同方式分享」台灣 3.0 版 本課程指定教材為 C++ How to Program, 7/e,
Operations Management Unit 10: Managing Inventories (1) 授課教師: 國立臺灣大學工商管理學系 黃崇興 教授 本課程指定教材為 Operations Management: Processes and Supply Chains, 10th ed.,
計算機程式 第四單元 Function I 授課教師:廖婉君教授 【本著作除另有註明外,採取創用 CC 「姓名標示 -非商業性-相同方式分享」台灣 3.0 版授權釋出】創用 CC 「姓名標示 -非商業性-相同方式分享」台灣 3.0 版 本課程指定教材為 C++ How to Program, 7/e,
Determining Optimal Level of Product Availability Optimal Matching of Supply and Demand (III) 1 蔣明晃教授 【本著作除另有註明外,採取創用 CC 「姓名標示 -非商業性-相同方式分享」台灣 3.0 版授權釋出】創用.
計算機程式 第五單元 Function II 授課教師:廖婉君教授 【本著作除另有註明外,採取創用 CC 「姓名標示 -非商業性-相同方式分享」台灣 3.0 版授權釋出】創用 CC 「姓名標示 -非商業性-相同方式分享」台灣 3.0 版 本課程指定教材為 C++ How to Program, 7/e,
McGraw-Hill/Irwin Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved.
Managing Transportation in a Supply Chain 【本著作除另有註明外,採取創用 CC 「姓名標示 -非商業性-相同方式分享」台灣 3.0 版授權釋出】創用 CC 「姓名標示 -非商業性-相同方式分享」台灣 3.0 版 第十一單元 (2) : Managing Transportation.
計算機程式 第一單元 Introduction to Computers, the Internet and the WWW 授課教師:廖婉君教授 【本著作除另有註明外,採取創用 CC 「姓名標示 -非商業性-相同方式分享」台灣 3.0 版授權釋出】創用 CC 「姓名標示 -非商業性-相同方式分享」台灣.
Strategic Framework to Analyze Supply Chains 【本著作除另有註明外,採取創用 CC 「姓名標示 -非商業性-相同方式分享」台灣 3.0 版授權釋出】創用 CC 「姓名標示 -非商業性-相同方式分享」台灣 3.0 版 第一單元: Strategic Framework.
1 Self Knowledge 自我知識 第十三單元: Acquaintance theories: objections and replies 親知理論的困難與回應 梁益堉 教授 【本著作除另有註明外,採取創用 CC 「姓名標示 -非商業性-相同方式分享」台灣 3.0 版授權釋出】創用.
SUPPLY CHAIN MANAGEMENT. PARTICIPANTS INTRODUCTION SUPPLY CHAIN MANAGEMENT.
Legal and legislative crisis in EU and Asia : analysis and reform models? 【本著作除另有註明外,採取創用 CC 「姓名標 示-非商業性-相同方式分享」台灣 3.0 版授權 釋出】創用 CC 「姓名標 示-非商業性-相同方式分享」台灣.
LI & FUNG 【本著作除另有註明外,採取創用 CC 「姓名標示-非商業性-相 同方式分享」台灣 3.0 版授權釋出】創用 CC 「姓名標示-非商業性-相 同方式分享」台灣 3.0 版 郭瑞祥教授 第二單元: Case Study- Li & Fung Lifung group 1.
Inventory Management: Cycle Inventory-II 【本著作除另有註明外,採取創用 CC 「姓名標示 -非商業性-相同方式分享」台灣 3.0 版授權釋出】創用 CC 「姓名標示 -非商業性-相同方式分享」台灣 3.0 版 第五單元: Inventory Management:
Distribution Strategies Chap 05 王仁宏 助理教授 國立中正大學企業管理學系 ©Copyright 2001 製商整合科技中心.
Determining Optimal Level of Product Availability Optimal Matching of Supply and Demand (III) 【本著作除另有註明外,採取創用 CC 「姓名標示 -非商業性-相同方式分享」台灣 3.0 版授權釋出】創用 CC.
Chap. 12 The Health Benefits of Recreational Activities on Leisure Farms in Taiwan (III) 張俊彥 Chun-Yen Chang 國立臺灣大學園藝學系教授 國立臺灣大學園藝暨景觀學系 【園藝療法 】 【本著作除另有註明外,採取創用.
1 由佛典選讀入手之二 巴利經典選讀 第六講:由佛典選讀入手之二 巴利經典選讀 授課教師:國立臺灣大學哲學系 蔡耀明 教授 1 【本著作除另有註明外,採取創用 CC 「姓名標示 -非商業性-相同方式分享」臺灣 3.0 版授權釋出】創用 CC 「姓名標示 -非商業性-相同方式分享」臺灣 3.0 版.
計算機程式 第二單元 Control Structure I 授課教師:廖婉君教授 【本著作除另有註明外,採取創用 CC 「姓名標示 -非商業性-相同方式分享」台灣 3.0 版授權釋出】創用 CC 「姓名標示 -非商業性-相同方式分享」台灣 3.0 版 本課程指定教材為 C++ How to Program,
計算機程式 第七單元 Pointers and Strings 授課教師:廖婉君教授 【本著作除另有註明外,採取創用 CC 「姓名標示 -非商業性-相同方式分享」台灣 3.0 版授權釋出】創用 CC 「姓名標示 -非商業性-相同方式分享」台灣 3.0 版 本課程指定教材為 C++ How to Program,
Department of Marketing & Decision Sciences Part 5 – Distribution Wholesaling and Physical Distribution.
Operations Management Unit 9: Managing Process Constraints 授課教師: 國立臺灣大學工商管理學系 余峻瑜 教授 本課程指定教材為 Operations Management: Processes and Supply Chains, 10th.
Survey of Selected Western Classics Unit 2: A Rose for Emily 授課教師 : 李欣穎副教授 【本著作除另有註明外,採取創 CC 「姓名標示- 非商業性-相同方式分享」台灣 3.0 版授權釋出】創 CC 「姓名標示- 非商業性-相同方式分享」台灣.
計算機程式 第十三單元 Inheritance 授課教師:廖婉君教授 【本著作除另有註明外,採取創用 CC 「姓名標示 -非商業性-相同方式分享」台灣 3.0 版授權釋出】創用 CC 「姓名標示 -非商業性-相同方式分享」台灣 3.0 版 本課程指定教材為 C++ How to Program, 7/e,
Introduction to Supply Chain Management Designing & Managing the Supply Chain Chapter 1 Byung-Hyun Ha
© 2003 McGraw-Hill Companies, Inc., McGraw-Hill/Irwin INTEGRATING SUPPLY CHAIN AND LOGISTICS MANAGEMENT 16 C HAPTER.
Creating and Negotiating Peace Structures: Difficulties for Small Nations Caught Between Superpowers Part 2: Difficulties with Economic Peace Structures.
計算機程式 第十二單元 Operator Overloading II 授課教師:廖婉君教授 【本著作除另有註明外,採取創用 CC 「姓名標示 -非商業性-相同方式分享」台灣 3.0 版授權釋出】創用 CC 「姓名標示 -非商業性-相同方式分享」台灣 3.0 版 本課程指定教材為 C++ How to.
Operations Management Unit 1: Using Operations to Compete 授課教師: 國立臺灣大學工商管理學系 黃崇興 教授 本課程指定教材為 Operations Management: Processes and Supply Chains, 10th ed.,
Operations Management Unit 12: Designing Effective Supply Chains 授課教師: 國立臺灣大學工商管理學系 余峻瑜 教授 本課程指定教材為 Operations Management: Processes and Supply Chains,
歐盟法與生命文化 ( 二 ) 第一單元 授課教師: Dr. Lukas Lien, University of Hamburg, Germany European Union as Paradigm of globalization-In mirror of German Thinking Tradition.
歐盟法與生命文化 (二) 第七單元 EU finance policies and crisis management Ideas for a new strategy of growth for Europe and Asia! 授課教師: Mr. Dieter Lutzenberger 1 【本著作除另有註明外,採取創用.
網 站 架 設 新 概 念網 站 架 設 新 概 念. 跟團自由行 國外旅遊 東京廉價航空比較.
歐盟法與生命文化 ( 二 ) 第二單元 Legal and legislative crisis in EU and Asia : analysis and reform models? 授課教師: Dr. Claudius Petzold 德國檢察官 1 【本著作除另有註明外,採取創用 CC 「姓名標示-非.
歐盟法與生命文化 (二) 第九單元 Germany’s dual vocational training system: a model for other countries? 授課教師: Mr. Raoul Kubitschek Christian Mahnke Manager Science &
Coordination in Supply Chain
實驗經濟學一:行為賽局論 Experimental Economics I: Behavioral Game Theory 補充材料:於現實驗證賽局理論:Swedish LUPI Lottery 賽局 Additional Material: “Testing Game Theory in.
Aristotle I Man as a Political Animal
5th Edition.
實驗經濟學一:行為賽局論 Experimental Economics I: Behavioral Game Theory 第九講:學習理論:制約、計牌與EWA Lecture 9: Learning: Reinforcement, Fictitious Play, and EWA 授課教師:國立臺灣大學.
Introduction to Digital Speech Processing
Presentation transcript:

Determining Optimal Level of Product Availability Optimal Matching of Supply and Demand (III) 【本著作除另有註明外,採取創用 CC 「姓名標示 -非商業性-相同方式分享」台灣 3.0 版授權釋出】創用 CC 「姓名標示 -非商業性-相同方式分享」台灣 3.0 版 第九單元 : Determining Optimal Level of Product Availability 1 蔣明晃教授

Levers for Increasing Supply Chain Profitability ►D►Decreasing the costs of overstocking and understocking ►R►Reducing the demand uncertainty 》I》I mproved forecasting to lower uncertainty 》Q》Q uick response: reduce lead time to increase number of orders per season 》P》P ostponement of product differentiation 》T》T ailored sourcing Microsoft 。 2

BENETTON Benetton 3

BENETTON Benetton 將毛衣的製造程序重新設計,將 原本先染色再編織的程序,改成先將毛線 編織成毛衣,等透過市場調查掌握市場流 行顏色後,才開始進行染色程序。如此, Benetton 公司可以避免大量顏色落伍的存 貨,每年因而節省數百萬美元的成本。 Benetton 4

BENETTON 72hr 12day Microsoft 。 5

ZARA zara.com Microsoft 。 6

What’s Quick Response? ►A widely used strategy 》 By general merchandise, soft-lines retailers and manufacturers 》 To reduce retail out-of-stocks, forced markdown, merchandising system and operating costs 》 Suppliers and retailers work together to respond more rapidly to consumer needs 》 By sharing POS information to jointly forecast future demand for replenishable items, and to continuously monitor trends to detect opportunities for new items 》 Spread through the supply chain and seamlessly linked at each stage by electronic data interchange ►A partnership strategy ►A JIT strategy 7

What’s Quick Response? ►A widely used strategy 》 By general merchandise, soft-lines retailers and manufacturers 》 To reduce retail out-of-stocks, forced markdown, merchandising system and operating costs 》 Suppliers and retailers work together to respond more rapidly to consumer needs 》 By sharing POS information to jointly forecast future demand for replenishable items, and to continuously monitor trends to detect opportunities for new items 》 Spread through the supply chain and seamlessly linked at each stage by electronic data interchange ►A partnership strategy ►A JIT strategy ►A widely used strategy ►A partnership strategy ►A JIT strategy 8

Basic Elements of QR Time horizons Information Supplier/ Manufacturer relationships Supplier/ Manufacturer relationships Philosophical/ Cultural change Philosophical/ Cultural change Logistics Manufacturing Operations Manufacturing Operations Time horizons Information Supplier/ Manufacturer relationships Philosophical/ Cultural change Logistics Manufacturing Operations 9

Example: US Textile and Apparel Industry in 1986 Fiber Fabric Apparel Consumer Retail Synthetics (75%) highly concentrated 》 Ten firms provide more than 90% of market More fragmented 》 6,000 firms 》 12 firms provide 1/4 of market Extremely fragmented 》 15,000 firms (70% employ fewer than 50 people) Increasing concentration Major categories: 》 Department stores 》 Mass merchandisers 》 Mail order 》 Chains 》 Specialty stores Increasing sophistication Expectation of variety/change Wide choice of retail outlets Fiber Fabric Apparel Consumer Retail 10

The Inefficiencies ►L►Long supply chain ►P►Problems of long supply chain ►1► overall loss - $25 billion 》 From raw material to consumer purchase was 66 weeks 》 11weeks in-plant time 》 40 weeks in warehouse or transit 》 15 weeks in store 》 Expensive to finance 》 Too much or too little product was produced and distributed 11

Expected Results through QR Fig QR system Weeks Fiber, Fabric, Apparel, and Retail Inventories (Working Weeks) Average Cost per Unit

Example: Benetton ►B►Benetton deliver knitted goods in the hottest new colors seemingly overnight. 》I》I t knitted the sweaters in neutral yarn and then dyed them to meet market demand. 》P》P utting in place fast and sophisticated retailer reporting systems. ►K►Key technologies 》B》B ar code systems 》C》C omputer networks 》A》A utomated distribution center 》E》E DI or Internet-based EC 》C》C IM Microsoft 。 13

ECR is a Global Industry Strategy in which Retailers and Suppliers Work Together to Deliver Better Consumer Satisfaction and Value. ECR(Efficient Consumer Response) Wikipedia 14

The Response ►Awaken the industry ►Targeting the common goals ►The total supply chain would achieve major gains in both efficiency and effectiveness 》 Focus on the entire supply chain rather than separate functions within it 》 Serve the consumer with the right products at the right time, and the right price 15

A strategy in which distributors and suppliers are working closely together to maximize grocery consumer satisfaction and minimize cost. Timely, accurate, paperless information flow Smooth, continual product flow matched to consumption Supplier Distributor Retail store Consumer household Consumer household What is Efficient Consumer Response? 16

Anatomy of Efficient Consumer Response A consumer purchases “Product A” from a supermarket. The transaction is recorded by the store’s scanner. The scanner forwards the transaction record to an in-store computer. The Product A manufacturer, whose computers interface with the retailer’s, notes the transaction and automatically reorders a replacement unit on a just-in-time basis. An automatic ordering system allows the product A supplier to match production to demand using product movement information and forecasting. Because production is tied directly into demand, retailers become increasingly freed from the need for excess inventory and warehousing of excess inventory, thus opening the door for increased cross-docking and direct store delivery shipments. The retailer’s in- store computer acknowledges receipt of the shipment and automatically issues a computer- generated payment or electronic fund transfer payment, eliminating the need for paper invoices and streamlining the accounting process. Microsoft 。 Codigofonte.net 網站 Microsoft 。 17

Efficient Consumer Response Process Manufacturing business strategy Manufacturing business strategy Replenishment Promotion Product introductions Store assortments Retail business strategy Retail business strategy Replenishment Promotion Product introductions Store assortments Open communication Change management Integrated EDI Continuous replenishment Computer-assisted ordering Flow-through distribution Activity-based costing Category management Flexible manufacturing Manufacturing business strategy Retail business strategy 18

ECR Strategies & Objectives StrategiesObjectives Efficient Store Assortment Optimize the productivity of inventories and store space at the consumer interface Efficient Replenishment Optimize time and cost in the replenishment system Efficient Promotion/Pricing Maximize the total system efficiency of trade and consumer promotion & pricing Efficient Product Introductions Maximize the effectiveness of new product development and introduction activities 19

ECR Components ►Logistics (Supply Side) 》 Continuous Replenishment 》 Cross Docking ►Category Management (Demand Side) 》 Understanding Consumer Needs 》 Decisions Made with Data 》 Category vs. Brand Focused 》 Total Systems Approach ►Enabling Technologies (Tools) 》 Electronic Fund Transfer (EFT) 》 Electronic Data Interchange (EDI) 》 Activity Based Costing (ABC) 》 Item Coding & Database Maintenance 20

Supplier warehouse 38 days Distribution warehouse (Forward buy 9 days, turn inventory 31 days) 40 days Retail store 26 days Supplier warehouse 27 days Distributor warehouse 12 days Retail store 22 days 104 days ECR DRY GROCERY CHAIN CURRENT DRY GROCERY CHAIN 61 days Packing line Packing line Consumer Purchase Consumer Purchase Packing line Packing line Consumer Purchase Consumer Purchase Example: Throughput Time Improvement of Dry Grocery 21

Stores P & G Plant P & G Headquarters Customer Headquarters Customer DistributionCenters Store Delivery Store Delivery Orders Direct store level shipment Demand and Inventory Demand and Inventory Ordering info Orders Example: P&G’s CRP Process Dedicated Carriers and Prescheduled Appointments Dedicated Carriers and Prescheduled Appointments Demand and Inventory Demand and Inventory Shipping info. Ordering info Wikipedia Codigofonte.net 網站 臺灣大學 郭瑞祥老師 22

ECR Requirements ►T►Think Total Supply Chain 》M》M ulti-Function, Multi-Echelon Cooperation ►C►Convert Efficiencies to Customer Value 》D》D rive True Efficiency and Recognize Inefficiency ►E►Emphasize on Consumer 》W》W ork Together to Create Demand ►C►Change Business Processes 》I》I dentify What’s Wrong Today ►T►Trust 》T》T o be Partners 》S》S hare Data 23

Barriers ►L►Lack of Trust ►L►Lack of Fairness - Open Trading ►N►No Information Sharing ►L►Lack of Resource Commitment ►L►Lack of Industry Standards ►C►Culture (Negotiation Environment) ►M►Measurement/Rewards 24

Quick Response: Multiple Orders per Season ►O►Ordering shawls at a department store 》S》S elling season = 14 weeks 》O》O riginal replenishment lead time = 15 weeks 》R》R educed replenishment lead time = 6 weeks 》C》C ost per handbag = $40 》S》S ale price = $150 》D》D isposal price = $30 》H》H olding cost = $2 per week ►E►Expected weekly demand = 20 ►S►SD of weekly demand = 15 Microsoft 。 25

Quick Response: Multiple Orders per Season ►O►Ordering shawls at a department store 》S》S elling season = 14 weeks 》O》O riginal replenishment lead time = 15 weeks 》R》R educed replenishment lead time = 6 weeks 》C》C ost per handbag = $40 》S》S ale price = $150 》D》D isposal price = $30 》H》H olding cost = $2 per week ►E►Expected weekly demand = 20 ►S►SD of weekly demand = 15 Microsoft 。 26

Quick Response: Multiple Orders per Season 》 The buyer’s forecast accuracy doesn’t improve for second order ►Two ordering policies: ►Two situations: 》 A single order must arrive at the beginning of the season to cover the entire season’s demand 》 Two orders are placed in the season, one arriving at the beginning of the season and the other arriving at the beginning of the eighth week 》 The buyer’s forecast accuracy does improve for second order 》 Reduced replenishment lead time = 6 weeks 27

Impact of Quick Response: Forecast doesn’t improve for second order (SD=15 ) Single Order Two Orders in Season Service Level Order Size Average Overstoc k Expect. Profit Initial Order OUL for 2 nd Order Average Total Order Ending Invent. Expect. Profit $23, $26, $24, $27, $24, $27, $24, $26, $24, $27, $25, $26,       

Observations ►It’s possible to provide the same level of product availability to the customer with less inventory if a second follow-up order is allowed ►The average overstock to be disposed of at the end of the sales season is less if two orders are allowed ►The profits are higher if second order is allowed 29

Leftover Inventory vs. Number of Order Cycles per Season Unsold Inventory at End of Season Number of Order Cycles per Season 30

Expected Profit vs. Number of Order Cycles per Season Expected Profit Number of Order Cycles per Season 31

Forecast Improves for Second Order (SD=3 instead of 15) Single OrderTwo Orders in Season Service Level Order Size Average Overstock Expect. Profit Initial Order OUL for 2 nd Order Average Total Order Ending Invent. Expect. Profit $23, $27, $24, $27, $24, $26, $24, $27, $24, $27, $24, $27,    3 32

Impact of Quick Response: Forecast doesn’t improve for second order (SD=15 ) Single Order Two Orders in Season Service Level Order Size Average Overstoc k Expect. Profit Initial Order OUL for 2 nd Order Average Total Order Ending Invent. Expect. Profit $23, $26, $24, $27, $24, $27, $24, $26, $24, $27, $25, $26,       

Forecast Improves for Second Order (SD=3 instead of 15) Single OrderTwo Orders in Season Service Level Order Size Average Overstock Expect. Profit Initial Order OUL for 2 nd Order Average Total Order Ending Invent. Expect. Profit $23, $27, $24, $27, $24, $26, $24, $27, $24, $27, $24, $27,    3 34

Notes ►Quick response is clearly advantageous to a retailer. ►But as the retailer order size drops, the manufacturer sells less to the retailer. Thus, the manufacturer make a lower profit in the short term if all else is unchanged. It seems to benefit retailer at the expense of the manufacturer. 35

►D►Delay the timing of the crucial processes in which end products assume their specific functionality, features, identities, or ‘personality’ ►C►Can be viewed as information strategy ►3►3 different kinds of postponement: Meaning of Postponement pull logistics form 36

►Delay the timing of the crucial processes in which end products assume their specific functionality, features, identities, or ‘personality’ ►Can be viewed as information strategy ►3 different kinds of postponement: pull Pull Postponement pull logistics form ►BTS vs BTO ►Decoupling point: the point from which the process switches from a build-to-stock mode to the build-to- order mode. ►Meaning of pull postponement: 》 Making the decoupling point earlier in the process. Microsoft 。 37

Pull Postponement:EX.1 Microsoft 。 Wikipedia 38

Pull Postponement:EX.2 Wikimedia commons Wikipedia flickr.com Like_the_Grand_ Canyon 39

頁碼作品授權條件作者 / 來源 2 本作品轉載自 Microsoft Office 2007 多媒體藝廊,依據 Microsoft 服務合約 及著作權法第 46 、 52 、 65 條合理使用。 Microsoft 服務合約 3 Benetton 。本作品轉載自網站 ( ) ,瀏覽日期 2012/1/11 。依據著作權法第 46 、 52 、 65 條合理使用。 ( 因網站商品隨時更 新,故此頁面無永久性網址。 ) 3 Benetton 。本作品轉載自網站 ( ) ,瀏覽日期 2012/1/11 。依據著作權法第 46 、 52 、 65 條合理使用。 ( 因網站商品隨時更 新,故此頁面無永久性網址。 ) 4 Benetton 。本作品轉載自網站 ( ) ,瀏覽日期 2012/1/11 。依據著作權法第 46 、 52 、 65 條合理使用。 ( 因網站商品隨時更 新,故此頁面無永久性網址。 ) 4 Benetton 。本作品轉載自網站 ( ) ,瀏覽日期 2012/1/11 。依據著作權法第 46 、 52 、 65 條合理使用。 ( 因網站商品隨時更 新,故此頁面無永久性網址。 ) 5 本作品轉載自 Microsoft Office 2007 多媒體藝廊,依據 Microsoft 服務合約 及著作權法第 46 、 52 、 65 條合理使用。 Microsoft 服務合約 6 本作品轉載自 Microsoft Office 2007 多媒體藝廊,依據 Microsoft 服務合約 及著作權法第 46 、 52 、 65 條合理使用。 Microsoft 服務合約 版權聲明 40

頁碼作品授權條件作者 / 來源 6 本作品轉載自 Microsoft Office 2007 多媒體藝廊,依據 Microsoft 服務合約 及著作權法第 46 、 52 、 65 條合理使用。 Microsoft 服務合約 6 zara 。本作品轉載自網站 ( ) , 瀏覽日期 2012/1/11 。依據著作權法第 46 、 52 、 65 條合理使用。 ( 因網站商 品隨時更新,故此頁面無永久性網址。 ) 13 本作品轉載自 Microsoft Office 2007 多媒體藝廊,依據 Microsoft 服務合約 及著作權法第 46 、 52 、 65 條合理使用。 Microsoft 服務合約 13 本作品轉載自 Microsoft Office 2007 多媒體藝廊,依據 Microsoft 服務合約 及著作權法第 46 、 52 、 65 條合理使用。 Microsoft 服務合約 13 本作品轉載自 Microsoft Office 2007 多媒體藝廊,依據 Microsoft 服務合約 及著作權法第 46 、 52 、 65 條合理使用。 Microsoft 服務合約 14 本作品由「所有權人 GS1 Taiwan 中華民國商品條碼策進會」授權本課程 使用,您如需利用本作品,請另行向權利人取得授權。 14, 22 本作品轉載自 WIKIPEDIA ( Mart_logo.svg) ,瀏覽日期 2012/2/20 。 Mart_logo.svg 版權聲明 41

頁碼作品授權條件作者 / 來源 14, 22 本作品轉載自 WIKIPEDIA ( ) 瀏覽日期 2011/12/22 。 17 本作品轉載自 Microsoft Office 2007 多媒體藝廊,依據 Microsoft 服務合約 及著作權法第 46 、 52 、 65 條合理使用。 Microsoft 服務合約 17 本作品轉載自 Microsoft Office 2007 多媒體藝廊,依據 Microsoft 服務合約 及著作權法第 46 、 52 、 65 條合理使用。 Microsoft 服務合約 17 本作品轉載自 Microsoft Office 2007 多媒體藝廊,依據 Microsoft 服務合約 及著作權法第 46 、 52 、 65 條合理使用。 Microsoft 服務合約 17 本作品轉載自 Microsoft Office 2007 多媒體藝廊,依據 Microsoft 服務合約 及著作權法第 46 、 52 、 65 條合理使用。 Microsoft 服務合約 17 本作品轉載自 Codigofonte.net 網站 ( imagens/cliparts/visualizar/COMP1.gif) ,瀏覽日期 2012/2/20 。依據著作權 法第 46 、 52 、 65 條合理使用。 imagens/cliparts/visualizar/COMP1.gif 22 臺灣大學 郭瑞祥老師 版權聲明 42

版權聲明 頁碼作品授權條件作者 / 來源 22 本作品轉載自 Codigofonte.net 網站 ( imagens/cliparts/visualizar/FABRICA2.gif) ,瀏覽日期 2012/2/18 。依據著 作權法第 46 、 52 、 65 條合理使用。 imagens/cliparts/visualizar/FABRICA2.gif) ,瀏覽日期 2012/2/18 22 本作品轉載自 Codigofonte.net 網站 ( imagens/cliparts/visualizar/PREDIO4.jpg) ,瀏覽日期 2012/2/22 。依據著 作權法第 46 、 52 、 65 條合理使用。 imagens/cliparts/visualizar/PREDIO4.jpg) ,瀏覽日期 2012/2/22 25, 26 本作品轉載自 Microsoft Office 2007 多媒體藝廊,依據 Microsoft 服務合 約及著作權法第 46 、 52 、 65 條合理使用。 Microsoft 服務合 約 38 本作品轉載自 Microsoft Office 2007 多媒體藝廊,依據 Microsoft 服務合 約及著作權法第 46 、 52 、 65 條合理使用。 Microsoft 服務合 約 37 本作品轉載自 Microsoft Office 2007 多媒體藝廊,依據 Microsoft 服務合約及著作權法第 46 、 52 、 65 條合理使用。 Microsoft 服務合約 38 Domino’s pizza 。本作品轉載自 WIKIPEDIA ( ,瀏覽日期 2012/2/23http://en.wikipedia.org/wiki/File:Dominos_pizza_logo.svg 38 Pizza Hut 。本作品轉載自 WIKIPEDIA ( ) ,瀏覽日期 2012/2/23http://en.wikipedia.org/wiki/File:Pizza_Hut_Schildergasse.jpg 43

頁碼作品授權條件作者 / 來源 39 Mcdonalds 。本作品轉載自 WIKIPEDIA ( ) ,瀏覽日期 2012/2/23http://en.wikipedia.org/wiki/File:Mcdonalds-90s-logo.svg 39 flickr.com, 作者: Like_the_Grand_Canyon 。 ( ,本作品 採取創用 CC 「姓名標示」 2.0 版授權釋出 。 Like_the_Grand_Canyonhttp:// CC 「姓名標示」 2.0 版授權釋出 39 flickr.com, 作者: Like_the_Grand_Canyon 。 ( ,本作品 採取創用 CC 「姓名標示」 2.0 版授權釋出 。 Like_the_Grand_Canyonhttp:// CC 「姓名標示」 2.0 版授權釋出 39 Wikimedia Commons 本作品轉載自 ,瀏 覽日期 2012/2/23 。 版權聲明 44