Tony Doyle - University of Glasgow 12 January 2005Collaboration Board GridPP: Executive Summary Tony Doyle.

Slides:



Advertisements
Similar presentations
S.L.LloydATSE e-Science Visit April 2004Slide 1 GridPP – A UK Computing Grid for Particle Physics GridPP 19 UK Universities, CCLRC (RAL & Daresbury) and.
Advertisements

Tony Doyle GridPP – From Prototype To Production, HEPiX Meeting, Edinburgh, 25 May 2004.
Tony Doyle - University of Glasgow GridPP EDG - UK Contributions Architecture Testbed-1 Network Monitoring Certificates & Security Storage Element R-GMA.
Your university or experiment logo here What is it? What is it for? The Grid.
S.L.LloydGridPP Collaboration Meeting IC Sept 2002Slide 1 Introduction Welcome to the 5 th GridPP Collaboration Meeting Steve Lloyd, Chair of GridPP.
GridPP Building a UK Computing Grid for Particle Physics A PPARC funded project.
Particle physics – the computing challenge CERN Large Hadron Collider –2007 –the worlds most powerful particle accelerator –10 petabytes (10 million billion.
Level 1 Components of the Project. Level 0 Goal or Aim of GridPP. Level 2 Elements of the components. Level 2 Milestones for the elements.
Tony Doyle - University of Glasgow 3 February 2005Science Committee Meeting GridPP Status Report Tony Doyle.
Fighting Malaria With The Grid. Computing on The Grid The Internet allows users to share information across vast geographical distances. Using similar.
GridPP From Prototype to Production David Britton 21/Sep/06 1.Context – Introduction to GridPP 2.Performance of the GridPP/EGEE/wLCG Grid 3.Some Successes.
Tony Doyle - University of Glasgow 10 January 2005Oversight Committee GridPP: status report Andy Parker (Taken from GridPP report at OSC by Tony Doyle)
Tony Doyle “GridPP2 Proposal”, GridPP7 Collab. Meeting, Oxford, 1 July 2003.
S.L.LloydGridPP CB 29 Oct 2002Slide 1 Agenda 1.Introduction – Steve Lloyd 2.Minutes of Previous Meeting (23 Oct 2001) 3.Matters Arising 4.Project Leader's.
Southgrid Status Pete Gronbech: 27th June 2006 GridPP 16 QMUL.
Birmingham Particle Physics Masterclass 23 th April 2008 Birmingham Particle Physics Masterclass 23 th April 2008 The Grid What & Why? Presentation by:
Slide David Britton, University of Glasgow IET, Oct 09 1 Prof. David Britton GridPP Project leader University of Glasgow GridPP Vendor Day 30 th April.
14 July 2004GridPP Collaboration BoardSlide 1 GridPP Dissemination Sarah Pearce Dissemination Officer
QCDgrid Technology James Perry, George Beckett, Lorna Smith EPCC, The University Of Edinburgh.
GridPP Steve Lloyd, Chair of the GridPP Collaboration Board.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
ScotGrid: a Prototype Tier-2 Centre – Steve Thorn, Edinburgh University SCOTGRID: A PROTOTYPE TIER-2 CENTRE Steve Thorn Authors: A. Earl, P. Clark, S.
CMS Report – GridPP Collaboration Meeting VI Peter Hobson, Brunel University30/1/2003 CMS Status and Plans Progress towards GridPP milestones Workload.
Tony Doyle - University of Glasgow 31 January 2005GridPP12 Collaboration Meeting GridPP Status Report Tony Doyle.
Tony Doyle GridPP – From Prototype To Production, GridPP10 Meeting, CERN, 2 June 2004.
INFSO-RI Enabling Grids for E-sciencE SA1: Cookbook (DSA1.7) Ian Bird CERN 18 January 2006.
QCDGrid Progress James Perry, Andrew Jackson, Stephen Booth, Lorna Smith EPCC, The University Of Edinburgh.
GridPP & The Grid Who we are & what it is Tony Doyle.
12th November 2003LHCb Software Week1 UK Computing Glenn Patrick Rutherford Appleton Laboratory.
Robin Middleton RAL/PPD DG Co-ordination Rome, 23rd June 2001.
1 st EGEE Conference – April UK and Ireland Partner Dave Kant Deputy ROC Manager.
3 June 2004GridPP10Slide 1 GridPP Dissemination Sarah Pearce Dissemination Officer
Dan Tovey, University of Sheffield GridPP: Experiment Status & User Feedback Dan Tovey University Of Sheffield.
Neil Geddes GridPP-10, June 2004 UK e-Science Grid Dr Neil Geddes CCLRC Head of e-Science Director of the UK Grid Operations Support Centre.
Tony Doyle - University of Glasgow 6 September 2005Collaboration Meeting GridPP Overview (emphasis on beyond GridPP) Tony Doyle.
John Gordon CCLRC e-Science Centre LCG Deployment in the UK John Gordon GridPP10.
SouthGrid SouthGrid SouthGrid is a distributed Tier 2 centre, one of four setup in the UK as part of the GridPP project. SouthGrid.
GridPP Deployment & Operations GridPP has built a Computing Grid of more than 5,000 CPUs, with equipment based at many of the particle physics centres.
GridPP: Executive Summary Tony Doyle. Tony Doyle - University of Glasgow Oversight Committee 8 February 2007 Outline Exec 2 Summary Grid status High level.
GridPP Presentation to AstroGrid 13 December 2001 Steve Lloyd Queen Mary University of London.
EGEE is a project funded by the European Union under contract IST Middleware Planning for LCG/EGEE Bob Jones EGEE Technical Director e-Science.
GridPP Building a UK Computing Grid for Particle Physics Professor Steve Lloyd, Queen Mary, University of London Chair of the GridPP Collaboration Board.
Ian Bird LHC Computing Grid Project Leader LHC Grid Fest 3 rd October 2008 A worldwide collaboration.
…building the next IT revolution From Web to Grid…
Tony Doyle - University of Glasgow 8 July 2005Collaboration Board Meeting GridPP Report Tony Doyle.
Les Les Robertson LCG Project Leader High Energy Physics using a worldwide computing grid Torino December 2005.
Grid User Interface for ATLAS & LHCb A more recent UK mini production used input data stored on RAL’s tape server, the requirements in JDL and the IC Resource.
Your university or experiment logo here What is it? What is it for? The Grid.
UK Tier 1 Centre Glenn Patrick LHCb Software Week, 28 April 2006.
Partner Logo A Tier1 Centre at RAL and more John Gordon eScience Centre CLRC-RAL HEPiX/HEPNT - Catania 19th April 2002.
Grid Security work in 2004 Andrew McNab Grid Security Research Fellow University of Manchester.
INFSO-RI Enabling Grids for E-sciencE The EGEE Project Owen Appleton EGEE Dissemination Officer CERN, Switzerland Danish Grid Forum.
DataGrid is a project funded by the European Commission under contract IST rd EU Review – 19-20/02/2004 The EU DataGrid Project Three years.
The National Grid Service Mike Mineter.
Distributed Physics Analysis Past, Present, and Future Kaushik De University of Texas at Arlington (ATLAS & D0 Collaborations) ICHEP’06, Moscow July 29,
J Jensen/J Gordon RAL Storage Storage at RAL Service Challenge Meeting 27 Jan 2005.
12 March, 2002 LCG Applications Area - Introduction slide 1 LCG Applications Session LCG Launch Workshop March 12, 2002 John Harvey, CERN LHCb Computing.
1 Open Science Grid: Project Statement & Vision Transform compute and data intensive science through a cross- domain self-managed national distributed.
UK Grid Operations Support Centre All slides stolen by P.Clarke from a talk given by: Dr Neil Geddes CCLRC Head of e-Science Director of the UK Grid Operations.
Slide § David Britton, University of Glasgow IET, Oct 09 1 Prof. David Britton GridPP Project leader University of Glasgow GridPP delivering The UK Grid.
18/12/03PPD Christmas Lectures 2003 Grid in the Department A Guide for the Uninvolved PPD Computing Group Christmas Lecture 2003 Chris Brew.
GridPP, The Grid & Industry
Bob Jones EGEE Technical Director
The LHC Computing Grid Visit of Mtro. Enrique Agüera Ibañez
Middleware Development and Deployment Status
Understanding the nature of matter -
UK GridPP Tier-1/A Centre at CLRC
Building a UK Computing Grid for Particle Physics
Collaboration Board Meeting
LHC Computing, RRB; H F Hoffmann
Presentation transcript:

Tony Doyle - University of Glasgow 12 January 2005Collaboration Board GridPP: Executive Summary Tony Doyle

Tony Doyle - University of Glasgow 12 January 2005Collaboration Board Contents What was GridPP1? What is GridPP2? Vision Challenges LCG –Data Challenges –Issues Deployment Status (9/1/05) –Tier-1/A, Tier-2, NGS M/S/N EGEE Middleware Applications Dissemination What lies ahead? Beyond GridPP2 Grid and e-Science Support in 2008 Executive Summary

Tony Doyle - University of Glasgow 12 January 2005Collaboration Board What was GridPP1? A team that built a working prototype grid of significant scale > 2,000 (9,000) CPUs > 1,000 (5,000) TB of available storage > 1,000 (6,000) simultaneous jobs A complex project where 88% of the milestones were completed and all metrics were within specification A Success “The achievement of something desired, planned, or attempted”

Tony Doyle - University of Glasgow 12 January 2005Collaboration Board What is GridPP2? Structures agreed and in place (except LCG phase-2) 253 Milestones, 112 Monitoring Metrics at present. Must deliver a “Production Grid”: robust, reliable, resilient, secure, stable service delivered to end-user applications. The Collaboration aims to develop, deploy and operate a very large Production Grid in the UK for use by the worldwide particle physics community.

Tony Doyle - University of Glasgow 12 January 2005Collaboration Board Vision 1.SCALE: GridPP will deliver Grid middleware and hardware infrastructure to enable the construction of a UK Production Grid for the LHC of significant scale. 2.INTEGRATION: The GridPP project is designed to integrate with the existing Particle Physics programme within the UK, thus enabling full use of Grid technology and efficient use of shared resources. 3.DISSEMINATION: The project will disseminate the GridPP deliverables in the multi- disciplinary e-Science environment and will seek to build collaborations with emerging non-PPARC Grid activities both nationally and internationally. 4.UK LHC COMPUTING: The main aim is to provide a computing environment for the UK Particle Physics Community capable of meeting the challenges posed by the unprecedented data, processing and analysis requirements of the LHC experiments. 5.OTHER UK PARTICLE PHYSICS COMPUTING: The process of creating and testing the computing environment for the LHC will naturally support the current and next generation of highly data intensive Particle Physics experiments. 6.EGEE: Grid technology is the framework used to develop the required capability: key components will be developed as part of the EGEE project and elsewhere. 7.LCG: The collaboration builds on the strong computing traditions of the UK at CERN. GridPP will make a strong contribution to the LCG deployment and operations programme. 8.INTEROPERABILITY: The project is integrated with national and international developments from other Grid projects and the GGF in order to ensure a common set of principles, protocols and standards that can support a wide range of applications. 9.INFRASTRUCTURE: Provision is made for a Tier-1 facility at RAL and four Regional Tier-2s, encompassing the collaborating Institutes. 10.OTHER FUNDING: The Tier-1 and Tier-2s will provide a focus for dissemination to the academic and commercial sector and will attract additional funds such that the full programme can be realised.

Tony Doyle - University of Glasgow 12 January 2005Collaboration Board Must share data between thousands of scientists with multiple interests link major (Tier-0 [Tier-1]) and minor (Tier-1 [Tier-2]) computer centres ensure all data accessible anywhere, anytime grow rapidly, yet remain reliable for more than a decade cope with different management policies of different centres ensure data security be up and running routinely by 2007 What are the Grid challenges?

Tony Doyle - University of Glasgow 12 January 2005Collaboration Board What are the Grid challenges? Data Management, Security and Sharing 1. Software process 2. Software efficiency 3. Deployment planning 4. Link centres 5. Share data 6. Manage data7. Install software 8. Analyse data9. Accounting 10. Policies

Tony Doyle - University of Glasgow 12 January 2005Collaboration Board LCG Overview By 2007: - 100,000 CPUs - More than 100 institutes worldwide - building on complex middleware being developed in advanced Grid technology projects, both in Europe (Glite) and in the USA (VDT) - prototype went live in September 2003 in 12 countries - Extensively tested by the LHC experiments during this summer

Tony Doyle - University of Glasgow 12 January 2005Collaboration Board Data Challenges Ongoing.. Grid and non-Grid Production Grid now significant CMS - 75 M events and 150 TB: first of this year’s Grid data challenges ALICE - 35 CPU Years Phase 1 done Phase 2 ongoing LCG Entering Grid Production Phase..

Tony Doyle - University of Glasgow 12 January 2005Collaboration Board Data Challenge 7.7 M GEANT4 events and 22 TB UK ~20% of LCG Ongoing.. (3) Grid Production ~150 CPU years so far Largest total computing requirement Small fraction of what ATLAS need.. Entering Grid Production Phase..

Tony Doyle - University of Glasgow 12 January 2005Collaboration Board LHCb Data Challenge 424 CPU years (4,000 kSI2k months), 186M events UK’s input significant (>1/4 total) LCG(UK) resource: –Tier-1 7.7% –Tier-2 sites: –London 3.9% –South 2.3% –North 1.4% DIRAC: –Imperial 2.0% –L'pool 3.1% –Oxford 0.1% –ScotGrid 5.1% DIRAC alone LCG in action /day LCG paused Phase 1 Completed /day LCG restarted 186 M Produced Events Entering Grid Production Phase..

Tony Doyle - University of Glasgow 12 January 2005Collaboration Board Paradigm Shift Transition to Grid… Jun: 80%:20% 25% of DC’04 Aug: 27%:73% 42% of DC’04 May: 89%:11% 11% of DC’04 Jul: 77%:23% 22% of DC’ CPU · Years

Tony Doyle - University of Glasgow 12 January 2005Collaboration Board Issues First large-scale Grid production problems being addressed… at all levels “LCG-2 MIDDLEWARE PROBLEMS AND REQUIREMENTS FOR LHC EXPERIMENT DATA CHALLENGES”

Tony Doyle - University of Glasgow 12 January 2005Collaboration Board Is GridPP a Grid? 1.Coordinates resources that are not subject to centralized control 2.… using standard, open, general-purpose protocols and interfaces 3.… to deliver nontrivial qualities of service 1.YES. This is why development and maintenance of LCG is important. 2.YES. VDT (Globus/Condor-G) + EDG/EGEE(Glite) ~meet this requirement. 3.YES. LHC experiments data challenges over the summer of

Tony Doyle - University of Glasgow 12 January 2005Collaboration Board GridPP Deployment Status (9/1/05) Three Grids on Global scale in HEP (similar functionality) sitesCPUs LCG (GridPP)90 (16)9000 (2029) Grid3 [USA] NorduGrid GridPP deployment is part of LCG (Currently the largest Grid in the world) The future Grid in the UK is dependent upon LCG releases totalCPUfreeCPUrunJobwaitJobseAvail TBseUsed TBmaxCPUavgCPU Total

Tony Doyle - University of Glasgow 12 January 2005Collaboration Board UK Tier-1/A Centre Rutherford Appleton Laboratory High quality data services National and international role UK focus for international Grid development 1000 CPU 200 TB Disk 60 TB Tape (Capacity 1PB) Grid Resource Discovery Time = 8 Hours 2004 CPU Utilisation2004 Disk Use

Tony Doyle - University of Glasgow 12 January 2005Collaboration Board UK Tier-2 Centres ScotGrid Durham, Edinburgh, Glasgow NorthGrid Daresbury, Lancaster, Liverpool, Manchester, Sheffield SouthGrid Birmingham, Bristol, Cambridge, Oxford, RAL PPD, Warwick LondonGrid Brunel, Imperial, QMUL, RHUL, UCL

Tony Doyle - University of Glasgow 12 January 2005Collaboration Board Level-2 Grid In future will include services to facilitate collaborative (grid) computing Authentication (PKI X509) Job submission/batch service Resource brokering Authorisation Virtual Organisation management Certificate management Information service Data access/integration (SRB/OGSA-DAI/DQPS) National Registry (of registry’s) Data replication Data caching Grid monitoring Accounting * Leeds Manchester * * Oxford RAL * * DL

Tony Doyle - University of Glasgow 12 January 2005Collaboration Board Middleware Development Configuration Management Storage Interfaces Network Monitoring Security Information Services Grid Data Management

Tony Doyle - University of Glasgow 12 January 2005Collaboration Board Application Development ATLAS LHCbCMS BaBar (SLAC) SAMGrid (FermiLab) QCDGridPhenoGrid

Tony Doyle - University of Glasgow 12 January 2005Collaboration Board More Applications ZEUS uses LCG needs the Grid to respond to increasing demand for MC production 5 million Geant events on Grid since August 2004 QCDGrid For UKQCD Currently a 4-site data grid Key technologies used - Globus Toolkit European DataGrid - eXist XML database managing a few hundred gigabytes of data

Tony Doyle - University of Glasgow 12 January 2005Collaboration Board Dissemination much has happened.. more people are reading about it.. LHCb-UK members get up to speed with the GridWed 5 Jan 2005 GridPP in PittsburghThu 9 Dec 2004 GridPP website busier than everMon 6 Dec 2004 Optorsim 2.0 releasedWed 24 Nov 2004 ZEUS produces 5 million Grid eventsMon 15 Nov 2004 CERN 50th anniversary receptionTue 26 Oct 2004 GridPP at CHEP'04Mon 18 Oct 2004 LHCb data challenge first phase a success for LCG and UKMon 4 Oct 2004 Networking in Nottingham - GLIF launch meetingMon 4 Oct 2004 GridPP going for Gold - website award at AHMMon 6 Sep 2004 GridPP at the All Hands MeetingWed 1 Sep 2004 R-GMA included in latest LCG releaseWed 18 Aug 2004 LCG2 administrators learn tips and tricks in OxfordTue 27 Jul 2004 Take me to your (project) leaderFri 2 Jul 2004 ScotGrid's 2nd birthday: ScotGrid clocks up 1 million CPU hoursFri 25 Jun 2004 Meet your production managerFri 18 Jun 2004 GridPP10 report and photographsWed 9 Jun 2004 CERN recognizes UK's outstanding contribution to Grid computingWed 2 Jun 2004 UK particle physics Grid takes shapeWed 19 May 2004 A new monitoring map for GridPPMon 10 May 2004 Press reaction to EGEE launchTue 4 May 2004 GridPP at the EGEE launch conferenceTue 27 Apr 2004 LCG2 releasedThu 8 Apr 2004 University of Warwick joins GridPPThu 8 Apr 2004 Grid computing steps up a gear: the start of EGEEThu 1 Apr 2004 EDG gets glowing final reviewMon 22 Mar 2004 Grids and Web Services meeting, 23 April, LondonTue 16 Mar 2004 EU DataGrid Software License approved by OSIFri 27 Feb 2004 GridPP Middleware workshop, March , UCLFri 20 Feb 2004 Version 1.0 of the Optorsim grid simulation tool released by EU DataGridTue 17 Feb 2004 Summary and photographs of the 9th GridPP Collaboration MeetinThu 12 Feb ,976 hits in December

Tony Doyle - University of Glasgow 12 January 2005Collaboration Board Annual data storage: PetaBytes per year 100 Million SPECint2000  100,000 PCs (3 GHz Pentium 4) Concorde (15 km) CD stack with 1 year LHC data (~ 20 km) What lies ahead? Some mountain climbing.. Quantitatively, we’re ~9% of the way there in terms of CPU (9,000 ex 100,000) and disk (3 ex 12-14*3 years)… In production terms, we’ve made base camp We are here (1 km) Importance of step-by-step planning… Pre-plan your trip, carry an ice axe and crampons and arrange for a guide…

Tony Doyle - University of Glasgow 12 January 2005Collaboration Board Executive Summary GRIDPP-PMB-40-EXEC The Grid is a reality A project was/is needed Under control LCG2 support: SC case being written 16 UK sites are on the Grid –MoUs, planning, deployment, monitoring –each underway as part of GridPP2 Developments estd.,R-GMA deployed Glite designed inc. web services Interfaces developed, testing phase Area transformed Initial ideas.. consultation reqd. Introduction Project Management Resources LCG Deployment –Tier-1/A production + Tier-2 resources M/S/N EGEE Applications Dissemination (Beyond GridPP2)