Transportation of Radioactive Material in the United States Earl P. Easton.

Slides:



Advertisements
Similar presentations
Clear Thinking on Nuclear: Transportation issues Experience, planning, and preparedness Well designed and thoroughly tested containers Coordinated efforts.
Advertisements

U.S. DOE Preparation for Shipping of Transuranic Radioactive Waste Cross Country – The Waste Isolation Pilot Plant (WIPP) O.W. “Lynn” Eaton, Manager External.
Update on Yucca Mountain and Transportation Impacts on Native American Communities Bob Halstead Office of the Governor Nevada Agency for Nuclear Projects.
IAEA International Atomic Energy Agency IAEA Regulations for the Safe transport of Radioactive Materials Why they can’t stay still.
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
National Spent Nuclear Fuel Program Meeting April 14, 2009 Stephen O’Connor, Director Office of Packaging and Transportation.
Swiss Federal Nuclear Safety Inspectorate Integrated Oversight An Approach to Systematic Supervision of NPP Safety Dr Peter Flury 31 May 2006.
HAZARDOUS MATERIALS (HAZMAT)
STRAGEGY FOR ENHANCING SHARE OF NUCLEAR ENERGY – Ensuring Safety & viability S.S. Bajaj Chairman, AERB 6 th Nuclear Energy Conclave, New Delhi 14 Oct 2014.
NUCLEAR ENERGY What is it? David J. Diamond Energy Sciences & Technology Department February 2009.
Hazardous Materials Transportation
Hazardous Materials Transportation
HMTA1 The Hazardous Materials Transportation Act (HMTA) The Hazardous Materials Transportation Act (HMTA)
History of waste disposal. 2 J.H. Saling and A.W. Fentiman, “Radioactive Waste Management,” Second Edition, (Taylor & Francis, NY  London) 2002.
NRC Decommissioning Activities for the San Onofre Nuclear Generating Station Bruce A. Watson, CHP Chief, Reactor Decommissioning Branch Division of Decommissioning,
+ DOT Shipping Primer Dwight Clark, CHMM Full Circle Compliance, LLC.
1 - Issuing regulations Governmental, Legal and Regulatory Framework for Safety (GSR – Part 1) Requirement 1: National policy and strategy for safety The.
EM - TRANSPORTATION. EM Office of Transportation - Organization & Responsibilities Basis of Organization & Responsibilities Basis of Organization & Responsibilities.
Regulations / Definitions
Kiggavik Project Final Hearing Presentation
Jim Hill Director, NMC Performance Assessment NEI SNPM Working Group ASQ Nuclear Power Production Committee Nuclear Power Fleet Operation Perspective.
Authorization and Inspection of Cyclotron Facilities Authorization for the Decommissioning of the Facility.
Public Utilities Commission of Ohio Rail Division Overview.
Are You Prepared For Increased Radiological Shipments?
Quality Assurance Program National Enrichment Facility Warren Dorman September 19, National Energy and Environmental Conference.
Clear Thinking on Nuclear Answers to some Frequently Asked Questions What careers are available? What do we do with nuclear waste? What happened at the.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration PHMSA Outreach U. S. DOT PHMSA HMSAT Norm Winningham.
1 presented to National Governors Association Federal Facilities Task Force National Transportation Program: A Policy Perspective J. Kent Hancock, Director.
IAEA 1 - Issuing regulations Governmental, Legal and Regulatory Framework for Safety (GSR – Part 1)GSR – Part 1 Requirement 1: National policy and strategy.
Waste Management Working Group CTMA Point Clear, AL W. T. (Sonny) Goldston EnergySolutions Working Group Chair July 6 - 9, 2015.
Hazardous Materials Transportatio n Hazardous Materials Transportation.
Hazardous Materials Transportation Act of 1975 By: Charley Copp.
Introduction to Workplace Safety
АТЦ СПб COMPIANCE ASSESSMENT AT TRANSPORT OF RADIOACTIVE MATERIALS ERSHOV V. - Emergency-Response Centre of the State Corporation “ROSATOM”, St.-Petersburg,
SÄTEILYTURVAKESKUS STRÅLSÄKERHETSCENTRALEN RADIATION AND NUCLEAR SAFETY AUTHORITY Example of a single national regulator responsible for both transport.
IAEA REGULATION RADIOACTIVE MATERIALS TRANSPORTATION IN ARMENIA Ashot Mnatsakanyan Head of Radiation Safety Department Armenian Nuclear Regulatory Authority.
The U.S. Department of Transportation and the International Trade Data System Steven Beningo Transportation Border Working Group Border Data Workshop June.
Regulatory Framework for the Safe and Secure Transport of Nuclear Material in Japan Japanese Government Akiko KONNAI Ministry of Land, Infrastructure,
1 LICENSING A U.S. GEOLOGICAL REPOSITORY WILLIAM BORCHARDT Executive Director for Operations U.S. Nuclear Regulatory Commission.
IAEA International Atomic Energy Agency. IAEA Outline Learning Objectives Introduction IRRS review of regulations and guides Relevant safety standards.
IAEA International Atomic Energy Agency Advanced Workshop School for Drafting Regulations on Radiation Safety RER/9/096.
IAEA School of Drafting Regulations Transportation regulations in Republic of Latvia Radiation Safety Centre (RSC) Marcis Slavinskis Vienna, 3-14 November.
Regulatory Framework for Uranium Production Facilities in the U.S.
17 October 2011A.-C. Lacoste – Conference Transport1 Safety, Security and Response a View of the IAEA Today André-Claude Lacoste President of the French.
IAEA 1 - Issuing regulations a, b The regulators of transport in Republic of Belarus are Department of supervision for the safe industrial activities and.
General Awareness and Familiarization Training
Transport of Nuclear Materials Mr Jack Dillich Dr Samir Sarkar Regulatory Services Branch
New safety and security requirements for the transport of nuclear and other radioactive materials in Hungary Tünde KATONA, Kristóf HORVÁTH, József SÁFÁR.
IAEA 1 - Issuing regulations Governmental, Legal and Regulatory Framework for Safety (GSR – Part 1)GSR – Part 1 Requirement 1: National policy and strategy.
Online Radiation Safety Training Programs Tomas Herrera FSME/MSSA/Licensing Branch OAS Annual Meeting Milwaukee, Wisconsin August 27-30, 2012.
Radiation Safety Regulations Part VIII: Management requirements and other requirements.
Technical Division Tutorial: Packaging and Transportation 1 A Tutorial on Packaging and Transportation of Nuclear Materials Institute of Nuclear Materials.
House Transportation Policy and Finance April 13, 2016 Tracy Hatch Deputy Commissioner Chief Financial Officer / Chief Operating Officer.
School of Drafting Regulations Transportation regulations in
John Christian President, Logistics, Processing and Disposal
The Hazardous Materials Transportation Act (HMTA)
Transportation of Class 7 materials: Compliance & Regulatory issues
Transportation of Radioactive Material in the United States
Presentation title – Presenter/ref May p.1
NRC’s LLW Regulatory Program: Update of Emerging Issues
Nuclear Waste Storage Current Status and Plans
Presented to the Project Certification Committee on November 16, 2011.
Removal and Packaging of Category 1 & 2 Self-Shielded Devices
Module 5 RASP Regulations.
Course Structure.
NUCLEAR ENERGY What is it?
Radioactive Waste Management in the Czech Republic - the Role of Regulatory Body Poster describes the National framework, policy and strategy for radioactive.
NRC’s fourth investigation over the last 35 years
Shipping and Receiving Hazardous Materials
Presentation transcript:

Transportation of Radioactive Material in the United States Earl P. Easton

Focus of Today’s Presentation Regulatory Roles and Responsibilities Approval Process for Transportation Packages Transportation Package Designs Your Questions

Regulatory Roles and Responsibilities

Nuclear Regulatory Commission Licenses the commercial use of Radioactive material, including transportation. Certification of Shipping Casks Inspection of Cask Designers, Fabricators Enforcement of Physical Protection Measures Emergency Response – assistance to first responders, lead Federal Agency

Department of Transportation – Regulates the transportation of all hazardous material, including spent fuel. –Hazards communications (marking and labeling of casks, placarding of vehicles, shipping papers, etc.) –Carrier safety (rail and highway safety regulations) –Route selection criteria

Department of Energy –Conducts largest non-commercial transportation of spent fuel and transuranic waste. –Will conduct largest transportation campaign for spent fuel to a Repository –Route selection using DOT selection criteria Implementation of physical protection measures Emergency response – assistance to first responders, Coordinating Agency under the National Response Plan Funding for emergency response training

State and Local Governments –Have lead role in responding to emergencies. –May enact additional safety requirements that are not in conflict with DOT requirements.

Approval Process for Transportation Packages

Definition of some common terms Packaging – the actual shipping container Package – packaging plus approved contents Cask – a heavily shielded packaging or package

Types of Packaging

Package Approval Standards

Accident Condition Tests Apply to all “ Type B ” packages Bound (not mimic) the impacts experienced in credible real-life transportation accidents –Impact, puncture and thermal tests are sequential Are designed to be reproducible and consistent

Acceptance Criteria for Accident Condition Tests Loss of shielding –Dose rate can not exceed 1 rem/hr at 40 inches Containment –Release of radioactive material can not exceed an A 2 per week. Criticality Safety – Contents must remain in subcritical configuration

Compliance with Accident Condition Tests Full scale testing –Pass-fail test Computer analysis –Computer programs benchmarked against real data –Conservative assumptions –Safety margins Computer analysis supplemented with: –Full scale component testing –Scale model testing

Certification of Spent Fuel Cask Designs Technical Reviews based on Standard Review Plan. Certification may be based on computer analysis, or full or scale model testing. NRC inspects cask designers, fabricators and shippers to make sure that casks are constructed to approved designs.

NRC approvals for radioactive material shipping packages are published every year. NUREG – 0383, Volume 2, Rev. 26 Available online through ADAMS

Before each shipment a spent fuel cask would be: leak tested checked for contamination surveyed for radiation level

Questions 18