LHC Splice Review, C. Scheuerlein, 18.10.2010 1 Local quality control of LHC electrical interconnections during the 2012 shutdown.

Slides:



Advertisements
Similar presentations
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Advertisements

Sequence of QC steps for main bus bar splices Control of cables and stabiliser prior to connection by ICIT team Temperature control during soldering, visual.
“ULTRASONIC SYSTEM OF DISTANT DETERMINATION COORDINATES”
VTSLM images taken again at (a) 4.5  (T=84.7K), (b) 3.85  (T=85.3K), (c) 22.3  (T=85.9K), and (d) 31.6  (T=86.5K) using F-H for current and A-C for.
Unit 19 Measurements of strain, stress, and coil mechanical properties
Manufacturing Processes
ELECTRO THERMAL SIMULATIONS OF THE SHUNTED 13KA LHC INTERCONNECTIONS Daniel Molnar, Arjan Verweij and Erwin Bielert.
A variety of load cases, ranging from nominal to degraded or abnormal operating conditions, were studied both numerically and analytically. The reviewers.
Quality control of LHC electrical interconnections to be produced during the 2009 shutdown Since the functional properties of the LHC electrical interconnections.
TE-MPE –TM, 16/05/2013, Mateusz Bednarek, TE/MPE-EE ELQA testing during and beyond LS1.
Status of SMACC-QA 1.Recently resolved issues 2.Update from QC teams 3.Statistics S56 and S67 4.Auditors findings 5.4th Splice Review – 22/24 July Ranko.
REVIEW OF THE CRYOGENIC BY-PASS FOR THE LHC DS COLLIMATORS ELECTRICAL CIRCUIT MODIFICATION, INCLUDING OPERATIONAL CONSIDERATIONS PRESENTED BY A. SIEMKO.
1Xxxxxx Titre xxxx © NDT expert © NDT expert - The ultimate control INFRARED THERMOGRAPHY ON AIRCRAFT.
Overview of the recommendation on LHC Splices Consolidation Frederick Bordry, head of the CERN Technology Department, has called for a series of three.
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
High strength materials are being increasingly used in designing critical components to save weight or meet difficult service conditions. Unfortunately.
A. Verweij, TE-MPE. 3 Feb 2009, LHC Performance Workshop – Chamonix 2009 Arjan Verweij TE-MPE - joint stability - what was wrong with the ‘old’ bus-bar.
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
Quality assurance of the QXF- Q2 Nb 3 Sn cable mass production C. Scheuerlein, 6 November 2014 HL-LHC/LARP International Review of the Superconducting.
Partikeldagarna, Göteborg 21 September 2007 LHC: Status and Plans Lyn Evans.
Technology Department Second LHC Splices Review Review of actions from last review List of recommendations of the first review Status Category A.Various.
Optimization of Field Error Tolerances for Triplet Quadrupoles of the HL-LHC Lattice V3.01 Option 4444 Yuri Nosochkov Y. Cai, M-H. Wang (SLAC) S. Fartoukh,
Preliminary Ultrasound Imager Quality Test “UNIFORMITY” J. Satrapa, TCC.
LARP Meeting April 2006LARP Magnet Program – D.R. Dietderich LARP Cable R&D D.R. Dietderich LBNL.
14-Dec-15S.Movchan Straw manufacturing and QC1 Straw manufacturing procedure and QC tape and straw parameters specification conditions of straw production:
STATUS OF H0/H- DUMPS M. Delonca – LIU meeting 29/11/2012 Thanks to: C. Maglioni, A. Patapenka, C. Pasquino, A. Perez, N. Mariani.
1 Quality control of the LHC main interconnection splices before and after consolidation C. Scheuerlein and S. Heck 2 nd LHC splice review,
Modelling the damage to carbon fibre composites due to a lightning strike Please use the dd month yyyy format for the date for example 11 January 2008.
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
LHC Magnets/Splices Consolidation (20 minutes) Francesco Bertinelli 7 June, slides  Status of LHC: electrical connections  Description of shunt.
1/22 R. Long 1, P. Cawley 1, J. Russell 1,2 1. UK Research Centre in NDE, Imperial College 2. Rolls-Royce Marine, Derby.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
Special interventions Status of production and QC Nicolas Bourcey TE-MSC-MDT Fourth LHC Splice Review November 2013.
Work Organisation for Splice Consolidation Francesco Bertinelli 20 minutes presentation, 10 minutes discussion: 12 slides First LHC Splice Review, CERN,
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
Jean-Philippe Tock (TE-MSC) On behalf of the SMACC project.
HWC with nQPS Splice Monitoring Zinur Charifoulline & Bob Flora Real Time (~10 sec) BUS Voltage Energy Extraction Trip 300 µV threshold on Un-bypassed.
ABTEF Meeting, V. Namora Quality Assurance in the Superconducting Magnets and Circuits Consolidation (SMACC) project.
Quality Assurance Overview Ranko Ostojic 12 Nov 2012.
A. Bertarelli – A. DallocchioWorkshop on Materials for Collimators and Beam absorbers, 4 th Sept 2007 LHC Collimators (Phase II): What is an ideal material.
P. P. Granieri 1,2, M. Breschi 3, M. Casali 3, L. Bottura 1 1 CERN, Geneva, CH 2 EPFL-LPAP, Swiss Federal Institute of Technology, Lausanne, CH 3 University.
MSC Technical Meeting 29 August 2013 Overheated QBBI.A21L6 F. Savary with contributions from N. Dalexandro, H. Prin, C. Scheuerlein, P. Voisin.
LHC Machine Advisory Committee Meeting no.19 QRL status 16 June 2006 G. Riddone, AT-ACR On behalf of the QRL team.
Use of Ultrasonic Phased Arrays for Examination of Austenitic Steel Welds Santanu Saha Technical Manager, Non-Destructive Testing Intertek INSPEC.
Summary of Presentation 1. Tolerances i. Vertical tolerances on BPMs (rf-BPM: ± 0.2μm, user BPMs: ±0.1μm, and X-BPMs: ± 0.1μm) ii. Tolerances on magnets’
S.Movchan Straw manufacturing and QC
RB and RQ shunted BusBar current carrying capacities
Ti/SS transitions A.Basti INFN-PISA*
NDT (Nondestructive Testing) for Welding Result
First Internal LHC Dipole Diode Insulation Consolidation Review
Cutting and welding First internal LHC Dipole Diode Insulation Consolidation Review 10 Oct 2017 G. Favre / A. Amorim Carvalho G. Favre EN-MME.
LHC Interconnect Simulations and FRESCA Results
12 October 2009 RRB Plenary R.-D. Heuer
Cutting and welding First internal LHC Dipole Diode Insulation Consolidation Review 10 Oct 2017 G. Favre / A. Amorim Carvalho G. Favre EN-MME.
Ignacio Aviles Santillana
Thermoforming Process
Optimization of Triplet Field Quality in Collision
Consequences of warming-up a sector above 80 K
Powering the LHC Magnets
11 T dipole coil features and dimensions
SMACC local splice quality control
Manufacturing Processes
Functional specification for the consolidated LHC dipole diode insulation system and consolidation strategy C. Scheuerlein on behalf of the LHC dipole.
Consolidation of the dipole diode insulation Technical aspects
Manufacturing Processes
WP3 Meeting – December the 10th 2015 H. Prin
L. Bottura and A. Verweij Based on work and many contributions from:
Cooling aspects for Nb3Sn Inner Triplet quadrupoles and D1
Shortening the long RQF/RQD busbar segments in points 1 and 5
Presentation transcript:

LHC Splice Review, C. Scheuerlein, Local quality control of LHC electrical interconnections during the 2012 shutdown

Outline o LHC splice quality control (QC) sequence during 2012 shutdown QC of existing main interconnection splices QC of disconnected main busbar cables before splice assembly QC of newly connected main interconnection splices (without shunts) QC of shunt solder contacts; feasibility studies and development of a new QC test QC of entire splices with shunts QC of line N connections QC of line M connections QC of splice insulation o Other quality assurance (QA) activities C. Scheuerlein,

QC of existing (“old”) main interconnection splices o In the LHC two families of main interconnection splices can be distinguished: About 9500 “old” splices produced during installation: Most “old” splices have gaps and/or large steps between the Cu profiles, and are not conform with visual acceptance criteria (see IEG-C-BR-001 rev C “Contrôle visuel des brasures”). About 500 “new” splices produced during 2009 shutdown, which are conform with IEG-C-BR-001 acceptance criteria. o Three possible consolidation strategies: 1)Open and redo almost all “old” splices before adding shunts. 2)Do not open any “old” splices and apply shunts as is. 3)Repair the worst cases before applying shunts. o In order to avoid opening all “old” splices, it is planned to repair only the worst cases. Therefore, the geometrical, as well as the electrical resistance acceptance criteria are less strict for “old” splices. 3C. Scheuerlein, Strongly distorted connection (QBQI.25R5-M1-QRL-lyra) Step between U-piece and busbar (QQBI.32R6-M2) Gap between U-piece and busbar tongue (QBQI.33L2- M3-QRL)

The R-8/R-16 test o Whenever possible QC is based on nondestructive test results obtained in-situ in the LHC. QC of main interconnection splices is based on room temperature (RT) resistance measurements (first suggested in 2009 by Howie Pfeffer and Bob Flora from Fermilab). o The so-called R-8/R-16 test [1] has been introduced during the 2009 shutdown in order to detect splices with a high excess resistance in the normal conducting state. This was a breakthrough in the QC of the main interconnections splices. C. Scheuerlein, R-16 measurement with test splices in SM18 o In case of a complete transverse gap between Cu splice profiles and bus bar stabiliser, the R-8/R-16 result is nearly proportional to the defect size (insulated cable length inside the busbar stabiliser). o The estimated R-8/R-16 random error is ±1 µΩ, and the systematic error is about +10 %. [1] “Production and Quality Assurance of Main Busbar Interconnection Splices during the LHC Shutdown”, IEEE Trans. Appl. Supercond., accepted.

Distribution of additional R-8 values measured for “old” splices produced before 2009 C. Scheuerlein, o The (biased) distribution of R-8 excess resistance values measured in 2009 for “old” splices (produced before 2009) may be helpful for determining an R-8 acceptance threshold value for “old” splices. o The excess resistance is defined as the measured resistance minus an average resistance value for good splices (5.6 µΩ and 9.3 µΩ for dipole and quadrupole splices, respectively). o An R-8 acceptance threshold value for “old” splices could be +5 µΩ excess resistance (redo “old” splices when R-8>10.6 µΩ and R-8>14.3 µΩ for dipole and quadrupole splices, respectively).

Alternative nondestructive tests: US transmission test o Before the introduction of the R-8/R-16 test, the US transmission test [2] was the most important QC tool in order to detect splices in which no solder foil had been added and/or for which the solder melting temperature had not been reached. o Both defect cases will also cause high R-8 excess values. Therefore, during the 2012 shutdown the US test is not needed anymore, and it will not be used as a routine QC test C. Scheuerlein, US transducers mounted to M3 splice [2] F. Caspers, T. Kroyer, J. Kulka, J.-P. Tock, L.R. Williams, “Ultrasound diagnostics of the superconducting cable connections between the main ring magnets of LHC”, LHC-Project-Report-1032, Standard US test result (result “OK”) Additional US test between U-piece and busbar nose (result “not OK”)

Alternative nondestructive tests: Gamma ray imaging o Comparatively large volume defects are detectable in the radiographs: o Lack of SnAg alloy in the busbar extremities. o Un ‑ molten SnAg foil at the splice extremities. o Gamma ray imaging is an important tool for trouble shooting. 7 Unmolten SnAg foil (additional R-8=31 µΩ). Radiographs courtesy J.-M. Dalin. Lack of SnAg in busbar ends.

Gamma radiography as a QC tool? o The spatial resolution of gamma radiography (for the LHC splices in the order of 0.1 mm ) is insufficient to exclude the presence of defects. Gamma radiography is NOT a QC tool. o During the 2012 shutdown gamma radiography will only be used occasionally, for instance in order to study if through improved splice heating equipment the loss of SnAg from the busbar ends can be reduced. 8 QBBI-B16L7-M1-COR-cC QBBI-B16L7-M1-COR-cL QQBI-16L7-M1-COR-cC QQBI-16L7-M1-COR-cL

QC of main busbar cables before splice assembly o At RT it is impossible to control the busbar cables and the cable to cable contacts inside a finished splice. Therefore, it is important to perform a a visual control before the splices are assembled. o Opening splices is a delicate task with some associated risks. Every un-soldering/soldering cycle invariably causes a cable degradation. If the splice disconnection is performed as planned, the degradation is small and acceptable [3]. o Disconnected cables are much more vulnerable than a busbar or a complete splice. o We expect a variety of cable defects to show up when a large number of splices will be opened. o In most cases it will not be clear if a defect has been introduced during the first interconnection, or if it occurred during or after splice disconnection (previous 1.9 K QC result is lost). C. Scheuerlein, [3] “Temperature induced degradation of Nb-Ti/Cu composite superconductors”, 2010 J. Phys.: Conf. Ser Disconnection of cable SSS-221-up-M1

Examples of damaged cables found in 2009 by the personnel performing the interconnection work 10 NCR : Entire cable squeezed between U-piece and wedge NCR , 2 strands cut NCR : Cable overheated (>580 °C) Half of the strands of one M3 cable of MB2446 were found cut in SMI2. NCR : Entire cable was squeezed between U-piece and wedge

QC of newly produced main interconnection splices (before application of shunts) o Acceptance criteria for splices that will be produced during the 2012 shutdown are more strict than for the existing “old” splices. o Visual inspection according to standard pocedure: IEG-C-BR-001 rev C “Contrôle visuel des brasures” No macroscopic (visible) gaps No steps between the Cu profiles >1 mm o QC is mainly based on in-situ R-8 results (measurement of R-16 is done as a cross check of R-8 results). C. Scheuerlein, QBBI.A27R3-M3-corridor Gap between U-piece and busbar stabiliser (QBBI.A27R3-M3- corridor “new” before repair) Gap between U-piece and busbar tongue (QBQI.33L2-M3-QRL) Step between U-piece and busbar (QQBI.32R6-M2)

Distribution of additional R-8 values measured for “new” splices produced in 2009 C. Scheuerlein, o The average values for “new” dipole (M3) and quadrupole (M1 and M2) splices are 5.6 µΩ and 9.3 µΩ, respectively. o Based on the R-8 distribution of “new” splices, additional resistance acceptance threshold values of 2 µΩ and 3 µΩ are suggested for dipole and quadrupole splices, respectively. o Redo “new” splices if: R-8 dipole >7.6 µΩ and R-8 quad >12.3 µΩ.

QC of shunt solder contacts o At least shunt solder connections have to be produced and tested for the consolidation of the LHC main interconnection splices. o The shunts should work as a fully redundant system. Therefore, it is necessary to control each solder contact separately (it is not sufficient to control only the complete splice with shunts). o An efficient nondestructive test is needed for this purpose (test duration per shunt solder contact <1 minute). o Three nondestructive testing methods have been studied: Ultrasonic testing (at CERN [4], EMPA [5] and BAM [6]). Active thermography (at BAM [7]). Electrical resistance (at CERN [8]). 13 [4] J.-M. Dalin, CERN EN-MME, in collaboration with Olympus, GE and ECCND. [5] J. Neuenschwander, “Feasibility study NDT of solder joints”, Swiss Federal Laboratories for Materials Testing and Research (EMPA), Dübendorf, Test Report No , (2010) [6] G. Brekow, D. Brackrock, “Ultrasonic testing of solder joints using a phased array technique with matrix arrays”, Federal Institute for Materials Research and Testing (BAM), Berlin, report reference number: part 1, LHC-CONS, (2010). [7] C. Maierhofer, M Röllig, “Feasibility study for non-destructive testing of solder joints – Results of active thermography”, BAM, report reference number: part 2, LHC-CONS, (2010). [8] S. Heck et al., “Room temperature resistance measurements for the quality control of shunt solder connections for the consolidation of the LHC main interconnection splices”, CERN TE-Note , EDMS Nr: , (2010)

Ultrasonic testing main conclusions o Ultrasonic (US) testing can in principle provide a quantitative result in terms of unsoldered area. o Best results have been achieved in immersion technique with a single element probe. o It is assumed that US testing in immersion technique is not possible in the LHC tunnel, and that mechanical scanning of a single element probe over the shunts is not possible within a reasonable duration. o Therefore, phased array technology in contact technique has been studied. o Test results achieved so far indicate that coupling of the matrix array transducer to the shunt is not reliable. o Even in the favorable case of US in immersion technique applied to nearly perfectly flat shunt specimen, the interpretation of US results is not straight forward. C. Scheuerlein, Olympus matrix array transducer and set-up used by BAM Single element probe in immersion used at CERN

Uncertainties in the interpretation of US results o Small variations of the US beam incidence angle can cause strong variations in the amplitude of the reflected US signal. When the angle exceeds 2°, the US result for a completely disconnected shunt appears like a good solder contact. 15 =0°=1° =2° =3° C-scans obtained with different US beam incidence angles (courtesy J. Neuenschwander) o The below US C-scan achieved with a matrix array transducer in contact technique indicates that about 50 % of the contact is well soldered, while the fracture sample shows that nearly 100 % were unsoldered. Fracture surfaces and C-scan of a nearly unsoldered test sample US C-scan (immersion technique) of two good shunt solder contacts. US result for shunt B indicates a poor solder contact.

Active thermography o In principle it is possible to conclude on the thermal conductivity of the solder contact from the temperature gradient in the thermograms. Under favorable conditions 6x6 mm 2 solder defects can be detected. o Thermography is a contact free technique, but blackening the Cu shunt surfaces is required. o The measurement strategy depends on the shunt thickness. 2 mm-thick: Impulse thermography → about 1 sec acquisition time plus 1 min for data treatment. 3 mm-thick: Lock-in thermography → more complicated; about 4 min acquisition time+10 min data treatment. o Temperature differences of less than 0.5 K must be detected. Is this possible in a non-air conditioned environment? o Active thermography needs to be performed by personnel with expertise in NDT. C. Scheuerlein, Sample photo (2 mm-thick shunt with artificial square defects) US C-scan (courtesy J.-M. Dalin) Thermogram 50 ms after flash excitation (courtesy C. Maierhofer). Experimental set-up with IR camera and flash lamps used by BAM

R-8/R-16 results for splices with large defect and shunts (SM18 test) o R-8 results indicate a poor solder connection of the shunt M3-QRL-connection. o Assessment of shunt quality from R-8 is only possible on splices that have high excess resistance. C. Scheuerlein, R-8 no shunt (µΩ) R-8 with shunt (µΩ) M3- QRL con (repaired 10.1) Lyra M3- cor. con Lyra

R_RT-top-side results for test splices with large defects and shunts (SM18 test) o R_RT-top-side tests for the QC of individual solder contacts [6]. o After repair the shunt contact on the wedge of M3-QRL-connection, R_RT-top-side is reduced from 10.5 µΩ to 2.1 µΩ. C. Scheuerlein, Comsol R_RT-top-side simulation for shunt with defect (courtesy S. Heck) R_RT-top-side measurement configuration

Conclusion NDT of shunt solder contacts o 100 % of the shunt solder contacts to be produced in the LHC tunnel will be controlled by a resistance test (in the so-called R_RT-top-side configuration). o An acceptance threshold value needs to be determined when the final shunt layout is known. It could be about 2.5 µΩ (for comparison, R_RT-top-side of the defective shunt in SM18 was 10.5 µ Ω). o US studies at CERN, EMPA and BAM have shown that ultrasonic tests are a good tool to detect solder delaminations. o Active thermography is another promising technique for testing shunt to solder contacts, in particular for 2 mm-thick shunts. o It should be helpful to further develop and use ultrasonics and thermography methods as complementary analysis tools. C. Scheuerlein,

QC of complete splice with shunts o After the R_RT-top-side test, a final R-8/R-16 test for all splices with shunts will be performed. o R-8 acceptance threshold values need to be determined (could be about 10 µΩ and 6 µΩ for quadrupole and dipole splices, respectively, which is close to the values for perfect splices without shunts). o The final R-8/R-16 test can be done directly after the R_RT-top-side tests of the shunt solder contacts. C. Scheuerlein,

QC of individual line M wire connections o Visual inspection of US welds according to: IEG-C-US-001 RevC “Controle visuel des soudures US sur les bus bars auxiliaires des lignes M1 et M2”. o Need to define acceptance criteria for solder connections. 1 st interconnection →1 US weld 2 nd interconnection →at least 2 US welds Soft soldering in case US welding is not possible 3 US welds per interconnection if spools are too short

Indirect assessment of US weld quality o Nondestructive testing of individual US welds in-situ in the LHC is NOT foreseen. o Indirect quality assessment of “new” US welds: Monitoring key process parameters (on-line analysis of production data like weld duration can indicate a degradation of the US weld quality). Measurement of US weld resistance and mechanical strength using test loops that are produced regularly during the production. C. Scheuerlein,

Is a QC of individual (“old”) line M wire connections possible? o Damage of wires and existing (“old”) wire connections during main splice repair and consolidation cannot be excluded. o Damage of wires can be very difficult to detect. o A local QC of individual “old” line M connections is NOT foreseen! 23 LHC-MSC-QBBI.A20R3 “spool 15 endommagé coté gauche” QBBI.B22R3; US weld of spool 11 before repair.

QC of individual line N wire connections o Visual inspection of “new” and “old” US welds according to “IEG-C-US- 002 Controle visuel des soudures US de type N”. o For newly produced US welds: indirect assessment of the splice quality from process parameters and test loop control results. C. Scheuerlein,

Is a QC of individual (“old”) line N connections possible?. 25 o Line N wire breakage occurred during US welding of a production loop during early installation. o Breakage is due to a non correct peeling of the wire insulation (with a wrong tooling), which initiated a fracture during US welding. o For visual control of “old” line N wire welds it is necessary to strongly bend the spools. o It is unlikely that line N wires that were damaged during removal of the insulation will be found by visual inspection.

Local QC of spool insulation C. Scheuerlein, QBBI.A21R3-repaired insulation QBEI.11R3-old QEBI.11L4-insulation QEQI.11R3-old insulation QBEI.11R3-old insulation o Spool insulation can be damaged during the 13 kA splice repair/consolidation. o Sometimes spool and 13 kA insulation are glued together, and spool insulation can be damaged when removing the 13 kA splice insulation. o Repair of spool insulation without cutting the spools is very time consuming. o If in 2012 the QC of spool insulation would be done like during the 2009 shutdown, it could become a bottle neck. o Local QC of existing spool insulation is NOT foreseen.

o Mechanical properties of US welds depend critically on key process parameters, e.g. on splice compression. o Verification of US welding machines is based on the production and testing of test loops. o During LHC installation and during the 2009 shutdown it has been demonstrated that a degradation of the US weld process can be detected by an increased resistance and reduced elongation at fracture of the US welded control samples. C. Scheuerlein, mm splice compression, fracture inside the weld Other QA tasks I: Verification of US welding machines 0.68 mm splice compression, fracture outside the weld

Other QA tasks II: Verification of main interconnection inductive soldering machines o So far qualification of inductive soldering machines was mainly based on production and testing of test splices. If resistance and tensile strength of the test splices are OK, the equipment and process is assumed to be OK. o However, production conditions of loops are not representative for the splice fabrication in the LHC, (e.g. temperature gradient and mechanical constraints), and it is nearly impossible to produce a non-conform test loop. o Therefore, for the 2012 shutdown the production of test loops will be complemented by direct measurements of the soldering machine performance. Focus will be on the temperature and pressure control. C. Scheuerlein,

Conclusion: Local QC confidence levels for individual LHC splices and splice components C. Scheuerlein, NDT in-situIndirect QCVisual control or no QC at all Cu stabiliser electrical continuity at main interconnection splices  Disconnected main busbar cables  Electrical continuity of the Cu Shunt solder contacts  Main interconnection splices with shunts  Cable to cable resistance in assembled 13 kA splices  “New” line N US welds  “Old” line N US welds  “New” line M spool connections  “Old” line M spool connections  Spool insulation  o The electrical continuity of the main busbar stabiliser through the interconnection splices, as well as through the shunt solder connections can be guaranteed by in-situ tests (R-8/R-16 and R_RT-top-side). o Cable damage during splice disconnection cannot be excluded. QC of cables relies strongly on the skill and commitment of the personnel producing the splices. o Main splice repair and consolidation work may risk to damage existing spools, spool connections and spool insulation. A local QC of existing (“old”) line M spool connections and spool insulation is NOT foreseen.