The NO A Module Factory Quality Assurance System Alex Smith University of Minnesota for the NO A Collaboration.

Slides:



Advertisements
Similar presentations
Making the System Operational
Advertisements

California Access Controls Inc Exciting features that are extremely easy to use Exciting features that are extremely easy to use Access Control.
RiT PatchView Solution
Vehicle Access Management System Smart Parking System.
Business Development Suit Presented by Thomas Mathews.
Easy to use Ability to attach policies/procedures to call types Ability to schedule calls in advance Officer safety alerts Robust search capabilities.
SSE system Management and Evaluation System, based on the obtained results.
Expected Sensitivity of the NO A  Disappearance Analysis Kirk Bays (Caltech) for the NO A Collaboration April 14, 2013 APS DPF Denver Kirk Bays, APS DPF.
© 2014 wheresjenny.com Dock management DOCK MANAGEMENT.
Neoteric Technology Ltd – All Rights Reserved - © 2006
Manufacturing Productivity Solutions Management Metrics for Lean Manufacturing Companies Total Productive Maintenance (T.P.M.) Overall Equipment Effectivity.
Xora StreetSmart V18 Customer Release Highlights 1 October, 2013.
Advanced Workgroup System. Printer Admin Utility Monitors printers over IP networks Views Sharp and non-Sharp SNMP Devices Provided Standard with Sharp.
ManageEngine TM Applications Manager 8 Monitoring Custom Applications.
Data Communications and Computer Networks
Overview of Centra 7. Centra 7 Highlights A real-time collaboration and communication platform Security, Scalability, Flexibility Supports all the critical.
Just-In-Time “Eliminate Waste”.
Lean Manufacturing Chris Poteet Scott Carroll.
To be the only one-stop-shop for all Highway Management needs in the minds of customers by constantly innovating new products and services with breakthrough.
Bar|Scan ® Asset Inventory System The leader in asset and inventory management.
Performance Management (Best Practices) REF: Document ID
Team May1310 Team Members: Taylor Bouvin – CPRE Kok Aun Chee (Kodi) – EE Anna Grimley – EE Mike Kinsella – CPRE Jake Kyro - EE Advisor: Professor Wang.
Track, Trace & Control Solutions © 2010 Microscan Systems, Inc. Introduction to Machine Vision for New Users Part 1 of a 3-part webinar series: Introduction.
AMG Attendance System Product Description Copyright © 2009 AMG Employee Management, Inc.AMG Employee Management, Inc.
Unit 3b Industrial Control Systems
Wireless Innovations for the Production Floor Visual Management Software Virtual Panel III Software Visual Messaging Software Factory Floor Communication.
Section 11.1 Identify customer requirements Recommend appropriate network topologies Gather data about existing equipment and software Section 11.2 Demonstrate.
Central Online Grading System COGS Dec15-21 dec1521.sd.ece.iastate.edu.
Performance Management (Best Practices) REF: Document ID
ISAT 303 Mod 1-1  M. Zarrugh Module I Sensors and Measurements in MFG  The objectives of this module are to –understand the role which sensors.
Course Presentation EEL5881, Fall, 2003 Project: Network Reliability Tests Project: Network Reliability Tests Team: Gladiator Team: Gladiator Shuxin Li.
Using OCR for Census Data Capture in China National Bureau of Statistics of China.
MECAL TOOLING SENTRY Tooling Sentry is a quality management system built round electronic Sentry Modules which attach to crimping presses to enforce the.
Cost for Large Liquid Scintillator Detector Ken Heller University of Minnesota Active Detector – Liquid Scintillator Target Material - Water Read Out –
Sarah Phan-Budd, TIPP Construction of PVC Extrusions for NO A Near and Far Detectors Sarah Phan-Budd Argonne National Lab On Behalf of the NO A.
The ProactiveWatch Monitoring Service. Are These Problems For You? Your business gets disrupted when your IT environment has issues Your employee and.
QuikTrac 5.5, a validated Motorola Software Solution, allows you to take your Host ERP screens and extend them out to fixed or mobile devices including.
Status of the NO ν A Near Detector Prototype Timothy Kutnink Iowa State University For the NOvA Collaboration.
HOW I SURVIVED A AIST3410 AND LEARNED TO LOVE DATABASES Fall 2015 Edition.
Business Functions, Processes, and Data Requirements
The Software Development Process
2 IMPACT - THE FIRE PERMIT = Hot Work Permit 3 Welcome ! This course is linked to the use of IMPACT, so it is assumed that: You know how to use IMPACT.
EPICS Release 3.15 Bob Dalesio May 19, Features for 3.15 Support for large arrays - done for rsrv in 3.14 Channel access priorities - planned to.
Gary Feldman MINOS in Cambridge 24 March NO A Update MINOS Collaboration Meeting Cambridge, England 24 March 2009 Gary Feldman.
NETWORKING FUNDAMENTALS. Network+ Guide to Networks, 4e2.
Software Engineering Lecture # 1.
EPICS Release 3.15 Bob Dalesio May 19, Features for 3.15 Support for large arrays Channel access priorities Portable server replacement of rsrv.
Applying “Visual Factory” in the Lean Enterprise.
Unit 17: SDLC. Systems Development Life Cycle Five Major Phases Plus Documentation throughout Plus Evaluation…
Metric Studio Cognos 8 BI. Objectives  In this module, we will examine:  Concepts and Overview  An Introduction to Metric Studio  Cognos 8 BI Integration.
NUMI MINOS MINOS Far Detector Installation & Commissioning Jeff Nelson MNHEP DoE Visit September, 2002.
Calibration algorithm and detector monitoring - TPC Marian Ivanov.
AD insertion For commercial insertion. A MERP Approach Use an integrated database. Both planning and playout and media management.
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
 Remote monitoring and management (RMM), also known as network management or remote service software, is a built on application to help managed IT service.
Constraints Space Load Capacity Costs Operating hours.
Chapter 4 Introduction to Automation
Critical Security Controls
US Sales Presentation – rev
Project Center Use Cases Revision 2
Project Center Use Cases
Project Center Use Cases
Chapter 4 Introduction to Automation
Project Center Use Cases Revision 3
Project Center Use Cases Revision 3
Automation Topics: Elements of an Automated System
Better with Augmented Reality
CAD DESK PRIMAVERA PRESENTATION.
Project Manager Application
Presentation transcript:

The NO A Module Factory Quality Assurance System Alex Smith University of Minnesota for the NO A Collaboration

NO A Physics Goals sin 2 (2  13 ) Determine neutrino mass hierarchy using MSW matter effects –Possible because NuMI can provide both neutrino and antineutrino beams Limit parameter space of  CP Precise measurement of sin 2 (2  23 ) Potential to observe neutrino flux from galactic supernovae

NO A Detector Module Design Wavelength shifting fiber looped through tube filled with liquid scintillator Many custom injection-molded PVC parts required to route 64 fiber ends and seal each module Two adhesive seals –“Inner”: a buffer that does not react with scintillator, but moderate strength –“Outer”: about as strong as PVC itself Modules assembled 12 across and 12 high at FD site Prototype

A Matter of Scale and Cost… Cost per module is critical –Student labor –Low reject rate: <2% ~$5000 for each rejected module Many part-time employees –Up to student employees at a time (up to 70 in the factory at a time) – total employees for ~2.5 year duration of production Industry-scale production operation: –~12,000 modules –~500 outgoing semi-truck loads of modules –Up to ~150 truck loads stored in factory –125,000 sf production space

Assembly Challenges Build ~12000 far detector modules Large part-time University of Minnesota student work force –~70 part-time employees in factory at a time during peak –Small full-time crew of two senior managers and five full-time managers Material handling –Modules are 16 m x 1.3 m x 0.7 m and weigh about 450 kg (1000 lbs) –Production of a single module spread over 5 days –Work on up to 150 modules at a time –Delay in any assembly step quickly leads to traffic jam Stringent technical requirements: –Liquid leak rate (tested with air) Test: detect air leak of ~3.3 std. cc/min from a ~1,000,000 cc volume 12 hour minimum test duration to reach this sensitivity –Flatness requirement of 0.5 mm over more than 20 m 2 –Wavelength shifting fiber light transmission Fibers easily damaged Three different tests to check for damage Real-time tracking of assembly process is essential

Goals of Quality Assurance Software Ensure that modules meet specifications before shipping Collect data during the assembly process to allow us to quickly identify, diagnose, and fix any problems that may arise. Interface with test devices to collect data –Interpret, summarize, and archive data –Centralize calibration data Guide assembly process to prevent mistakes Provide tools to: –Manage large number of part-time employees with a small team of full- time employees –Manage training of employees –Ensure quality and manage inventory of parts and materials –Guarantee maintenance and proper functioning of the large number of machines –Ensure compliance with safety standards –Ease reporting to safety agencies –Simplify reporting to project management

Software Framework Built on Java Enterprise Edition (Java EE) –Multi-tiered enterprise application Deployed on GlassFish application server cluster –Two servers –Failover PostgreSQL database –Two servers –Sync to hot failover Web tier – Based on Servlets, PHP, and JSF Client tier –Java GUI application clients –Started from Java WebStart Downloads/installs code if needed Auto update of code if changed –Provide interface to employees Instructions Error alerts Audio and voice feedback –Receive input primarily from Bluetooth bar code scanners and touchscreen panels

Hardware Architecture GlassFish App Server 2 Data 2 DB 2 DB Server 2DB Server 1 GlassFish App Server 1 Data 1 DB 1 DB Fermilab DB Server Public Web Clients Manager/ Web Server Router Comcast Modem WIFI Client 1 Client 50 Display 1 Display 10 Web Clients Customer/Supplier Web Clients Sync

Employee Management Login/logout to track actual hours Online scheduler –Students schedule themselves Employees scan into their tasks Safety equipment tracking

Labor Allocation and Training Managers use “Day Planner” tool to decide how to allocate the day’s work force Employee training is indicated for each assembly process group –Training defined for each group of assembly procedures We plan to add algorithms to choose starting labor allocation based on selected priorities

Reporting and Compliance Many workers and machines to keep track of Safety Compliance –Data to demonstrate compliance with safety standards is collected Respirator usage and maintenance Gantries and lifting device maintenance Expenditure reporting to project management –Employees track their work by scanning corresponding bar codes Payroll –Required data is collected to automate payroll –We plan to switch to automated timesheet generation soon

Inventory Management Shortage of part or supply could have serious impact on project schedule Some injection molded parts have lead times on the order of months Adhesives have limited shelf life –Cannot be ordered too far in advance –Shelf life must be checked before use Many small items to track –Adhesive mixing nozzles –Bar code labels Alarm system alerts management when inventory drops below configurable warning and error thresholds Tools for receiving and checking out parts

Alarm Systems and Displays Can be configured with relevant information for each factory location

Configurable Alarm Displays Location of stacks Extrusion details

Assembly Tracking and Checks The scanner interface panel guides the employee through assembly process Scans capture ID of employees, gluing jig, adhesive dispenser, extrusion ID’s, lifting fixture. Checks: –Does employee have a respirator assigned? –Are respirator cartridges within the exposure threshold? –Are extrusions within tolerance? Any missing data? –Are two extrusion heights compatible with each other? –Are module lifter, gantry, and hoist current on their scheduled service and inspection? –Is the adhesive dispenser current on its maintenance and ratio calibration? Automatically determines next module ID from database and prints bar code labels Starts adhesive cure timer when module is clamped and sounds bell when ready. Example: Joining two extrusions:

Assuring Module Flatness Flatness of module impacts strength of detector structure Custom robot drives down module to measure flatness of the module –Employee is alerted if module is out of tolerance Alarm is displayed on factory monitor panel Data is uploaded to the database and is viewable on the web Flatness measurement made for each cell at 5 locations along length of module Ends of fit to each extrusion must fall within tolerance

Installation of WLS Fibers Added extra fiber tests based on prototype detector experience –Throwing away a module costs >$5000 –Test fibers as early as possible when they can be replaced –Test at several stages of assembly Fiber loops are pulled down cells using semi-automated pulling device –Control and feedback through touch screen panels Tension measured and controlled –Alarm if tension threshold exceeded Fiber transmission measured during pull –Alarm if insufficient or sharp drop in transmission Fibers threaded through guide channels and optical connector

Additional QA of WLS Fiber Open-End Laser Test Robot Shine laser on exposed far end of fiber loop Compare light output against expected output Closed End Test Measure reflected and transmitted light from each end while illuminating other end –Use camera to measure light

Closed Module Fiber Test Plot transmission intensities from each end of fiber –Apply 4  cut –Reject outliers as bad –Refit and apply 4  cut –Continue until no fibers are rejected Perform same analysis using reflected intensities

Module Leak Test Tester measures flow by counting bubbles passing between equalized test module and reference Up to 32 modules per tester 12 hour test duration Module Reference

Conclusions System was used to build NO A prototype detector –Added additional QA steps based on experience Currently being used for first steps of far detector assembly This system is key to meeting the challenges ahead of us –Build ~12000 far detector modules –Meet stringent tolerances –Manage large part-time work force with small full-time crew Ongoing development to address new needs and concerns as they arise