08 November, 2006OMSZ, Budapest RC LACE Evaluation Report Peter Lynch and Detlev Majewski 15 May 2006 RC LACE Evaluation.

Slides:



Advertisements
Similar presentations
European Commission, DG EAC – Unit A3
Advertisements

Assimilation of radar data - research plan
Why does ERA Need to Flourish
RSMC La Réunion activities regarding SWFDP Southern Africa Matthieu Plu (Météo-France, La Réunion), Philippe Arbogast (Météo-France, Toulouse), Nicole.
Vilnius, 29 June 2007 CIOMS Recommendations on Ethics in Medical Research The Eighth Global Forum on Bioethics in Research Gottfried Kreutz Dr. med., Dipl.-Chem.;
Using public procurement to foster research and innovation More Research and Innovation COM(2005) 488 of 12 October 2005 Commission communication to the.
The Open Method of Coordination as an example of policy learning at the European Level Six Countries Programme Stockholm May 2006 Peder Christensen.
Task Force Fostering and Building Human Capital Opportunities for Regional Cooperation in South Eastern Europe Sofia, 4 April 2008.
ASYCUDA Overview … a summary of the objectives of ASYCUDA implementation projects and features of the software for the Customs computer system.
13 Febuary 2008GEO CBC Hannover Transfer of Regional NWP Capabilities to Developing Countries Detlev Majewski, Deutscher Wetterdienst, Germany
1 Measuring Progress: Monitoring and Evaluation in WRIA 8 WRIA 8 Salmon Recovery Council November 19, 2009 Scott Stolnack WRIA 8 Technical Coordinator.
11 Scaling Up World Bank Group Engagement with Civil Society: A Strategic Priorities Paper Civil Society Team EXTIA.
1 GlobModel The GlobModel study, initial findings and objectives of the day Zofia Stott 13 September 2007.
Planning and use of funding instruments
What is valorisation ? Growth €
1 EU Strategy for the Baltic Sea Region Anders Lindholm European Commission DG Regional Policy, Territorial Cooperation.
WP4 – 4.1 and 4.2 Preparatory activities for the creation of the WATERMODE permanent network 1 Technical Committee Meeting Venice, June 24-25, 2010 VENETO.
1 Lessons learned – success factors for biodiversity projects Peter Tramberend Environment Agency Austria.
1 The GEMS production systems and retrospective reanalysis Adrian Simmons.
Norwegian Meteorological Institute met.no LAMEPS – Limited area ensemble forecasting in Norway, using targeted EPS Marit Helene Jensen, Inger-Lise Frogner,
BUILDING THE CAPACITY TO ACHIEVE HEALTH & LEARNING OUTCOMES
Software change management
Evaluating administrative and institutional capacity building
CARMEN Policy Observatory and Dialogue Proposal Presentation to the CARMEN Directing Board Meeting San Juan, Puerto Rico 30 June 2003.
1 Functional Strategy – IS & IT Geoff Leese November 2006, revised July 2007, September 2008, August 2009.
Christina Skantze. Baltic Sea Strategy initiative – why? New political context for cooperation – EU-enlargement, integration Underline priorities and.
Introduction to data assimilation in meteorology Pierre Brousseau, Ludovic Auger ATMO 08,Alghero, september 2008.
SUB-REGIONAL WORKSHOP FOR GEF FOCAL POINTS IN WESTERN AND CENTRAL AFRICA, DAKAR, May 2007 GEF NATIONAL COORDINATION: BURKINA FASO’S EXPERIENCE.
© Crown copyright Met Office SRNWP Interoperability Workshop, ECMWF January 2008 SRNWP Interoperability Alan Dickinson Met Office.
PROFORCE Bridging of Probabilistic Forecasts and Civil Protection Yong Wang, Clemens Wastl, Franziska Strauss (ZAMG)
Proposed Predictability, Dynamics & Ensemble Forecasting Expert Team Richard Swinbank, with Heini Wernli, Masayuki Kyouda and Istvan Szunyogh, and thanks.
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Agenda Item: 15 Chu ISHIDA(JAXA) on behalf of Rick Lawford, GEO Water CoP leader GEO Water.
Short-Range NWP Programme 13th SRNWP Meeting 11 October 2006 Zurich (Switzerland)
1 There are a number of organization designs, including many combinations or hybrids of models. Seven designs are shown below: Process Centered Front End.
Organically evolving CBC opportunities and areas of work INTOSAI Capacity Building Committee - Meeting in Lima, Peru 9-11 September 2014.
Interoperability between the European NWP modelling systems Ulrich Schättler, François Bouttier, Xiaohua Yang, Radmila Brozkova, Alan Radford A Report.
28 th CEOS Plenary Session John Bates NOAA CEOS Plenary, Agenda Item 13 Tromsø, Norway October 2014.
The ‘INCA KIP’: Knowledge Innovation Project for an Integrated system for Natural Capital and ecosystem services Accounting UNCEEA June 2015 Anton.
SMHI in the Arctic Lars Axell Oceanographic Research Unit Swedish Meteorological and Hydrological Institute.
Science Plan and SPM report COSMO General Meeting, 9 September 2010.
Introducing the Lokal-Modell LME at the German Weather Service Jan-Peter Schulz Deutscher Wetterdienst 27 th EWGLAM and 12 th SRNWP Meeting 2005.
NWP Activities at INM Bartolomé Orfila Estrada Area de Modelización - INM 28th EWGLAM & 13th SRNWP Meetings Zürich, October 2005.
Page 1© Crown copyright 2007SRNWP 8-11 October 2007, Dubrovnik SRNWP – Revised Verification Proposal Clive Wilson Presented by Terry Davies at SRNWP Meeting.
Page 1© Crown copyright 2005 SRNWP – Revised Verification Proposal Clive Wilson, COSMO Annual Meeting September 18-21, 2007.
COSMO Annual Meeting September 2005 Zurich (Switzerland) Short-Range Numerical Weather Prediction Programme.
Results of the HPC in Europe Taskforce (HET) e-IRG Workshop Kimmo Koski CSC – The Finnish IT Center for Science April 19 th, 2007.
WMO Collaboration with EUMETNET in WIGOS Implementation ICG-WIGOS-3 (Geneva, 14 February 2014) Miroslav Ondráš, Chief, WMO Observing Systems Division WMO;
Prague' 03 - Convergence1 Convergence between the ALADIN and AROME projects: opportunity and challenges I)Motivation II)Issues III)Partnerships IV)New.
European Cooperation on Nowcasting Yong Wang, ZAMG.
Synthesis of Strategic Issues (Climate, Disasters, Water) and a draft European strategic framework.
Formulating a Simulation Project Proposal Chapter3.
RC LACE 25th EWGLAM Meeting 6-9 October 2003, Lisbon1.
26 th EWGLAM & 11 th SRNWP meetings, Oslo, Norway, 4 th - 7 th October 2004 Stjepan Ivatek-Šahdan RC LACE Data Manager Croatian Meteorological and Hydrological.
Workshop on the Strategy and Action Plan of the WMO Flood Forecasting Initiative WMO Headquarters Geneva, 08 – 10 December 2009 INTRODUCTION TO THE WORKSHOP.
Interoperability at INM Experience with the SREPS system J. A. García-Moya NWP – Spanish Met Service INM SRNWP Interoperability Workshop ECMWF –
EUM/SAF/VWG/02/0010, Rev. 3, May 2003 Page 1 The SAF Network Concept and Status Juha-Pekka Luntama, EUMETSAT GRAS Mission Scientist
EurEPS The Realization of an Operational LAM-EPS in Europe A SRNWP Project under EUMETNET Proposed to the EUMETNET Council at its 30 th meeting by Norwegian.
Tiziana Paccagnella COSMO General Meeting Bucharest Report from the Scientific Project Manager 7th COSMO GENERAL MEETING.
Capacity Building in: GEO Strategic Plan 2016 – 2025 and Work Programme 2016 Andiswa Mlisa GEO Secretariat Workshop on Capacity Building and Developing.
Introducing the Lokal-Modell LME at the German Weather Service
Responsible member: Hungarian Meteorological Service Period:
Progress in development of HARMONIE 3D-Var and 4D-Var Contributions from Magnus Lindskog, Roger Randriamampianina, Ulf Andrae, Ole Vignes, Carlos Geijo,
LAM and Short Range NWP Some thoughts from Brussels
Highlights of activities
Meteorological applications and numerical models becoming increasingly accurate Actual observing systems provide high resolution data in space and time.
NWP Strategy of DWD after 2006 GF XY DWD Feb-19.
SRNWP-PEPS COSMO General Meeting September 2005
Support Activities and WG 6 Overview Status Report
Presentation transcript:

08 November, 2006OMSZ, Budapest RC LACE Evaluation Report Peter Lynch and Detlev Majewski 15 May 2006 RC LACE Evaluation

08 November, 2006OMSZ, Budapest RC LACE Evaluation Report Peter Lynch and Detlev Majewski 15 May 2006 Peter Lynch and Detlev Majewski OMSZ, Budapest, 08 November 2006 Presentation of the RC LACE Evaluation Report

08 November, 2006OMSZ, Budapest RC LACE Evaluation Report Peter Lynch and Detlev Majewski 15 May Introduction 2. Brief History of RC LACE 3. The Current Situation 4. [ Break ] 5. Future Options 6. Task Sharing 7. Recommendations. Outline of Presentation

08 November, 2006OMSZ, Budapest Background NWP essential for operational weather forecasting. Maintenance and development of NWP systems beyond the capacity of most small NMSs. Therefore: Strong incentive to cooperate. The LACE Council decided on an evaluation of the RC LACE Project. Purpose: to assist in planning for the coming decade. Terms of Reference were drawn up.

08 November, 2006OMSZ, Budapest Consultations at RC LACE Centres: 1. Directorate 2. Local NWP teams 3. Technical and forecasting staff 4. Internal NWP users. Participated in meetings of: 1. LACE Council 2. LACE Steering Committee 3. Management Group 4. Vision Meeting at ECMWF. Extensive analysis of relevant documentation. Discussion of intermediate Evaluation Report. Activities of the Evaluators (pg 36)

08 November, 2006OMSZ, Budapest Short History of LACE (pp 5-7) Political changes in Europe in 1980s. Opportunities for co-operation in the Central European area. Meeting in Vienna (1990) to consider a Regional Centre for limited-area modelling. This was the embryo of RC LACE LACE Project established within a year.

08 November, 2006OMSZ, Budapest The French Government provided financial support to foster closer links. Météo-France offered a limited-area version of the ARPEGE model for operational use. This proposal included strong training and research components. The LAM-ARPEGE Project started in Toulouse in September Shortly it became ALADIN. The French Connection

08 November, 2006OMSZ, Budapest ALADIN provided an ideal basis for LACE. Several LACE scientists work in Toulouse. Nov. 1994: Co-operation framework agreement between RC LACE and Météo-France. Spring 1996: RC LACE Management Group established. Leader: Miroslav Ondráš. Plan A: Operational Regional Centre in Vienna. Later political changes in Austria prevented the establishment of the Regional Centre there.

08 November, 2006OMSZ, Budapest The Prague Phase 1997: CHMI acquire NEC computer. ALADIN ported to this system. March, 1998: First RC LACE MoU. Establishment of Regional Centre in Prague. June, 1998: ALADIN/LACE operations transferred to Prague. Scientists from all the participating institutes working at CHMI in Prague.

08 November, 2006OMSZ, Budapest Boundary conditions dispatched from Toulouse on a regular basis. Prague Centre was back-up centre for the reference ALADIN system software. ALADIN system was also run in operational mode in the other centres: Slovenia (1997), Hungary (1998), Austria (1999), Slovakia (1999), Croatia (2000). Each centre used combination of NWP guidance from the Prague Centre and local ALADIN.

08 November, 2006OMSZ, Budapest Centralized organization had many attractions … Concentrated research effort very effective. Common operational system maintained and developed with considerable efficiency. … but also significant tensions … Increasingly difficult to fulfill NWP requirements of all the participating institutes. Scientists reluctant to spend long periods away from their home institutes. Transfer of substantial financial resources away from the national institutes.

08 November, 2006OMSZ, Budapest Second RC LACE MoU signed in Oct Decentralized phase began in January, RC LACE now Regional Co-operation LACE. MoU has been extended until the end of Each RC LACE Member responsible for its own operational NWP system. Scientific R&D coordinated within the project. The Current LACE Project (pp 7-8)

08 November, 2006OMSZ, Budapest Policy of Project determined by LACE Council (Directors of Member Institutes). LACE Steering Committee (LSC) is advisory body for Project. The Project Leader is Dijana Klarić (Croatia). The Management Group (MG): 1. Project Leader (PL) 2. ALADIN-LACE System Coordinator (ASC) 3. Data Manager (DM) 4. Working Group Leaders (WGLs). Structure of the Project

08 November, 2006OMSZ, Budapest Dynamics and Coupling Physical Parameterization Data Assimilation. EPS and Predictability Management Group appointments are reviewed annually. Working Groups

08 November, 2006OMSZ, Budapest RC LACE first group to officially join the ALADIN-2 Project (Jan, 2004). Intensive discussions on roadmap for ALADIN-2 and AROME. The AROME Project was started in 2000 at Météo-France. Goal: high resolution model for nowcasting and very short range forecasting. The ALADIN Project

08 November, 2006OMSZ, Budapest Combines parts of ALADIN and Meso-NH. Designed for resolution of c. 2 km. Interest within RC LACE for operational application of AROME. A framework for the transition: ALARO, similar to ALADIN with refined physics. LACE scientists are already active in Aladin/Hirlam collaboration (HARMONIE). AROME

08 November, 2006OMSZ, Budapest The European Context (pp 8-9) Europe a world leader in operational meteorology. RC LACE Members (5) in EU. RC LACE Members (5) in ECMWF. Possible EU move on centralization of operational meteorology … (?) Closer collaboration among NMSs is essential. EUMETNET a framework for collaboration. EUMET: All LACE members involved. WMO – Region VI. SRNWP: to be re-tasked / empowered.

08 November, 2006OMSZ, Budapest ECMWF World-leading forecast centre. Feb, 2006: Spatial resolution 25 km. Grid resolution of 10 km by RC LACE must aim for about 2 km on that time-scale.

08 November, 2006OMSZ, Budapest RC LACE Strengths (pp 9-12) Proven modelling expertise (Annex III) RC LACE and ALADIN. Relationship with Météo-France. Local operational ALADIN systems. Local NWP knowledge. Local applications. Budgetary control. Flexibility and Adaptability.

08 November, 2006OMSZ, Budapest RC LACE Weaknesses (pp 12-15) Manpower in NWP. Duplication of effort. Lack of identity, visibility. Internal communication. Complexity of the scientific planning process. Need to cover all NWP. Coordination of plans. Management structure. Quality of operational NWP systems.

08 November, 2006OMSZ, Budapest Break

08 November, 2006OMSZ, Budapest External Factors affecting LACE (pp 15-18) Activities of major NWP centres. User demands in LACE countries. Role of private service providers. NWP in universities. Government regulations. Developments in IT and communications.

08 November, 2006OMSZ, Budapest Other operational NWP systems in Europe that compete with LACE North-Atlantic Europe model (NAE) of UKMONAE (grid spacing 12 km; 8 km in 2009). Local model Europe (LME) of DWDLME (grid spacing 7 km). Local model LMK (LM-Kürzestfrist) of DWDLMK (grid spacing 2.8 km). University of Basel: NOAA-NCEP (NMM) modelNMM (grid spacing 13 and 2 km).

08 November, 2006OMSZ, Budapest Domains of the NAE (12 km/ 8 km) and UK regional forecast systems

08 November, 2006OMSZ, Budapest Global model GME grid spacing: 40 km number of layers: 40 forecast range: 174 h from 00 and 12 UTC 48 h from 06 and 18 UTC grid cell area: 1384 km 2 Local model LME grid spacing : 7 km number of layers: 40 forecast range: 78 h from 00 and 12 UTC 48 h from 06 and 18 UTC grid cell area: 49 km 2 Domain of the LME (7 km) of the Deutscher Wetterdienst

08 November, 2006OMSZ, Budapest grid length: Δx = 2.8 km direct simulation of coarser parts of deep convection interactions with fine scale topography use of radar data for initialization improved numerical schemes 50 layers in the vertical, lowest layer in 10 m above ground center of the domain 10° E, 50° N 421 x 461 grid points boundary values from LME ( x = 7 km) pre-operational phase starting July 2006 LMK-Configuration Model domain of LMK Domain of the LMK (2.8 km) of the Deutscher Wetterdienst

08 November, 2006OMSZ, Budapest LMK forecasts without (centre) and with (right) usage of radar data during the assimilation; radar observation (left)

08 November, 2006OMSZ, Budapest LMK-forecasts – ETS for hourly precipitation (thresholds 0.2 mm/h and 2.0 mm/h) Averaged over 80 forecasts (23 days: 0, [6,] 12, 18 UTC) mm/h 2.0 mm/h 06 18

08 November, 2006OMSZ, Budapest University of Basel: Meteoblue NMM with grid spacing 2 kmNMM with grid spacing 13 km

08 November, 2006OMSZ, Budapest How LACE can respond to the NWP competition in Europe Provide better NWP quality, e.g. data assimilation. Provide higher reliability, e.g. hardware. Provide better price/performance ratio. Provide better customer service, e.g. documentation in local language. Provide more flexibility, e.g. product generation. Provide tailored products for customers, e.g. hydrology.

08 November, 2006OMSZ, Budapest Strategic NWP goals (pp 18-22) Convective scale NWP (AROME). Intermediate-scale (~5km) model (ALARO). Local data assimilation. Lateral boundary conditions. Regional ensemble prediction system. Increased automation of forecast process. Scientific scope of programme. Interaction with other NWP consortia.

08 November, 2006OMSZ, Budapest Task-sharing in RC LACE (pp 23-24) Balanced, voluntary contributions. Agreement on Lead Centres for specific areas. Efficient use of the scarce manpower available. Specialisation of the NWP teams. Ability of smaller NWP groups to provide their centres with a complete NWP system.

08 November, 2006OMSZ, Budapest 1. Common Observation Data Base (ODB) 2. Monitoring of observations, based on ODB 3. Flexible verification tool based on ODB 4. Data assimilation for intermediate NWP model 5. Detailed analysis of surface/soil parameters 6. Development and integration of intermediate NWP model 7. Preparation of a radar data composite 8. Nowcasting system based on ALARO/AROME and INCA 9. Ensemble Prediction System (EPS) 10. Standardized key post processing tools. Some Options for Task-sharing (pp24-28)

08 November, 2006OMSZ, Budapest 1. Common Observation Data Base (pg 24) The Observation Data Base (ODB) is a database software system developed at ECMWF. We propose a common centralised operational ODB for all LACE centres. It should be maintained at two different centres which will work as mutual backup. The common ODB, should store all GTS and local data from all LACE centres in the ODB. All other LACE centres can retrieve the observations from the ODB. Strict protection measures will be necessary.

08 November, 2006OMSZ, Budapest 2. Monitoring of data based on ODB (pg 25) Total counts of all observation types. Observation distribution maps for each analysis cycle. Rejected observation distribution maps for each cycle. Vertical profiles of observation fit to first guess, and analysis for each analysis cycle. Monthly maps of radiosonde - first guess biases. Vertical profiles of monthly mean and std of radiosonde biases, for bias-corrected areas. Monthly maps of mean and root-mean-square errors of drifting buoys.

08 November, 2006OMSZ, Budapest 3. Flexible verification based on ODB (pp26-27) Verification tool for LACE models, other regional models and the ECMWF model. Scheme designed and coded in Slovenia may serve as nucleus of the new system. Comparison of the quality of the models highlights strengths and weaknesses of the NWP systems. The centre responsible for verification should produce a quarterly verification report.

08 November, 2006OMSZ, Budapest 4. Centralized Data Assimilation (pg 27) The LACE centres will need a common regional model (grid ~5 km ALARO). This will provide the lateral boundary conditions of their meso-gamma scale AROME model. The data assimilation for this model should be performed in one LACE centre. The analysis should then be distributed to all LACE centres. The analysis of the intermediate NWP model should have higher quality.

08 November, 2006OMSZ, Budapest 5. Analysis of surface/soil parameters (pg 27) For Central Europe, high-resolution analysis of surface and soil parameters is important. Reliance on interpolated ARPEGE analysis for the surface and soil fields is not adequate. LACE should develop its own capability for high-resolution surface analysis. The expertise of the HIRLAM consortium should be exploited.

08 November, 2006OMSZ, Budapest 6. Development and integration of the intermediate model (pg 27) Centralised integration of the intermediate NWP model (grid spacing ~5 km) is possible. This will provide coupling files for LACE centres running convection-scale AROME model. This intermediate model must include data assimilation, including surface variables. The intermediate model may be driven by lateral boundary data from ARPEGE or ECMWF.

08 November, 2006OMSZ, Budapest 7. Preparation of radar data composite (p27-28) The convection-scale model AROME will assimilate radar data. The operational production of composite radar data of all the LACE countries is important. A number of scientific and technical problems must be solved. Expertise of other NWP consortia (HIRLAM, COSMO, UKMO) using radar should be used.

08 November, 2006OMSZ, Budapest 8. Nowcasting with INCA System (pg 28) INCA should be interfaced to the common ODB using local LACE data and ALARO forecasts. A centralized INCA run with domain covering all LACE countries should be considered. A local version of INCA, based on AROME forecasts, may also be developed.

08 November, 2006OMSZ, Budapest 9. Ensemble Prediction System (pg 29) The combined computer power available at the LACE centres should be used to run an EPS. Distributed computation of the EPS members and centralized evaluation/product generation. There are several scientific problems to be solved. Expertise of other NWP consortia running regional EPS should be used; EUMETNET SRNWP optional project?

08 November, 2006OMSZ, Budapest 10. Post-processing tools (pp 28-29) LACE scientists must work on a variety of downstream developments. To avoid duplication, standardised and portable post-processing tools should be developed. Since tools like Kalman Filter or MOS require observational data, the common ODB data base should be used.

08 November, 2006OMSZ, Budapest 1. Common ODB / Data Assimilation (Res. + Ops.) 2. Nowcasting system / EPS (Res. + Ops.) 3. Dynamics & Intermediate NWP model (Res. + Ops.) 4. Post processing / Surface Analysis (Res.) 5. Radar data composite (Res.) 6. Verification (Res.) Sketch of a possible configuration of Lead Centres (pg 30)

08 November, 2006OMSZ, Budapest Recommendations (pp 29-34) 1. Priority tasks for near future Common verification Data assimilation Evaluate ECMWF forecasts as LBC data Post-processing Focus on ALADIN, ALARO, AROME.

08 November, 2006OMSZ, Budapest 2. Strategy and Planning (pg 31) Council should adopt a general 10-year strategy of RC LACE, updated every five years. LSC should formulate a detailed 2-year plan, updated annually. Survey of user requirements. LSC should co-ordinate and harmonize user requirements.

08 November, 2006OMSZ, Budapest 3. Management Structure (pp 31-32) Council Twice-yearly Council meetings. Reduce amount of papers for the meeting. Material dispatched in timely fashion. Short summary documents. Appointment of new management staff. LACE Steering Committee (LSC) Receive papers two weeks before meeting. Reduce time spend on technical issues. Increase time for strategic issues. Highlight training needs and co-ordinate training.

08 November, 2006OMSZ, Budapest Project Leader (pg 32) Position should be full-time (or at least 80%). Improve international visibility of RC LACE. Pro-active in putting RC LACE objectives on international agenda. Act as RC LACE representative at key meetings and conferences. Management Group (pp 32-33) Core Group (80%) for long-term research tasks. The WG Leaders need formal control of scientists. Improve flow of information between WGs. ASC and DM should be a half-time positions. Terms of Reference for ASC and DM separated. Longer time-scale for management appointments.

08 November, 2006OMSZ, Budapest 4. Internal & External Communications (pp 33-34) A recurring theme: lack of recognition of RC LACE outside the ALADIN Community. WWW as repository for documentation. Visual Image of RC LACE. Communications with other NWP Consortia. Management Group should explicitly consider possibilities for collaboration with other groups when defining scientific plans for RC LACE.

08 November, 2006OMSZ, Budapest Thank you