R&D proposals for EuCard 2 EuCard2, April 21Steffen Döbert, BE-RF  SRF basic research (W. Weingarten)  CTF3 and CTF3+, possible infra - structure for.

Slides:



Advertisements
Similar presentations
CLIC two-beam module integration issues 4 th CLIC Advisory Committee (CLIC-ACE), May 26-28, 2009 CLIC two-beam module integration issues G. Riddone on.
Advertisements

SLAC workshop 7-10 July 2009 WP1: microwave based accelerators Status of CLIC X-band high-power components G. Riddone, (contribution from A.
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
CTF3 commissioning status R. Corsini - CTF3 committee 17 th September 2009 Update on CTF3 Operations and schedule This time I will try to give a more complete.
Walter Wuensch CLIC project meeting, 31 March 2015 Accelerating structure program: design and testing.
CLIC Drive Beam Linac Rolf Wegner. Outline Introduction: CLIC Drive Beam Concept Drive Beam Modules (modulator, klystron, accelerating structure) Optimisation.
Test Facilities Sami Tantawi SLAC. Summary of SLAC Facilities NLCTA (3 RF stations, one Injector, one Radiation shielding) – Two 240ns pulse compressor,
K. Alam, CLIC workshop, October 16-18, CLIC workshop, October 2007 Working group “ Two beam hardware and integration” Test module in the two.
F. Toral CLIC Workshop CIEMAT contribution to CLIC Experimental Verification F. Toral on behalf of Accelerator Technology Group, CIEMAT.
5 th CLIC X-band collaboration meetingWalter Wuensch16 May 2011 CLIC rf structure program.
Drive Beam and CTF 3 International Workshop on Linear Colliders 2010 October 22, 2010 Erik Adli, Department of Physics, University of Oslo and CERN Bernard.
30 GHz waveguide line modification towards 12 GHz.
From one module to a long string 6 th CLIC Advisory Committee February 3, 2011 Erik Adli, Department of Physics, University of Oslo, Norway.
Summary of AWG4: Beam Dynamics A. Latina (CERN), N. Solyak (FNAL) LCWS13 – Nov 11-15, 2013 – The University of Tokyo, Japan.
RF Power production at CTF3 X-band structure collaboration meeting,SLAC 6 th July 2009 Steffen Döbert, BE-RF  30 GHz power production  12 GHz power production.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
TBL as a 12 GHz power source, overview and first results from commissioning IWLC 2010 workshopSteffen Döbert, BE-RF  Current status of TBL  Status of.
Development of Dielectric PETS Chunguang Jing and Wei Gai ANL and Euclid CLIC workshop 2013.
R. Corsini, CLIC Project Meeting October 24, 2012 CTF3 Experimental program for end 2012 R. Corsini for the CTF3 Team 1.
1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN.
Two-beam Test Stand Status and Results Roger Ruber & Igor Syratchev for the TBTS team.
CLIC08 workshop CLIC module layout and main requirements G. Riddone, on behalf of the CMWG Home page of the TBM WG:
CLIC TDR Task Force CLIC Zero, cost & schedule considerations R. Corsini.
CTF3 Probe Beam G. A. Blair Royal Holloway Univ. London CTF3 Meeting, CERN 30 th November 2005 Introduction – UK Context Draft Proposal Future prospects.
Summary of progress towards CLIC goals and next steps for structure testing 6 th X-band collaboration workshop, April 18 th- 20 th 2012 Steffen Döbert,
Contribution from Pakistan to CLIC & CTF-3 Project. NASIR ABBAS
CLIC work packages CTF3-003 (TBL+) CLIC0-001 (CLIC DB injector) CLIC0-002 (photo injector option for CLIC DB injector.
University of Oslo and CLIC Short overview for first “NorduCLIC” meeting Erik Adli and Steinar Stapnes, University of Oslo May 19, 2008.
1 R. Corsini – CLIC Project Meeting CTF3 Update CTF3 Update R. Corsini for the CTF3 Team 1.
TBTS Test Program & Schedule G. Riddone
CLIC-ACE, Frank Tecker CTF3 program completion and upgrade to CTF3+ Frank Tecker – CERN for the CTF3 team CTF3 program completion and upgrade.
Two-Beam Test Stand results 5th Collaboration Meeting on X-band Accelerator Structure Design and Test Program SLAC, Stanford, CA, USA Erik Adli, University.
1 CTF3 collaboration meeting Jan 2008 G.Geschonke Status of CTF3 G.Geschonke CERN.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
Interface between TAC SR and SASE FEL Possibility for testing CLIC structure Avni AKSOY Ankara University.
RF programme Review for the ESGARD Roadmap to EUCARD2 Peter McIntosh (STFC) Stephane Chel (CEA) Wolf-Dietrich Moeller (DESY)
Oleksiy Kononenko CERN and JINR
Main and Drive Beam Dynamics Working Group Caterina Biscari, Daniel Schulte Attending people ~ 20 ± 5 Presentations ~ 18 (7 from CERN) CL IC 07.
FP7: EuCARD after a year of preparation… A.Jeremie.
TBL experimental program Status and Results  Introduction  Status  Experimental program for 2010 and beyond  Outlook ACE, Steffen Döbert.
1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN.
CLIC Workshop 2008 TBTS status. PETS testing program and installation status. Igor Syratchev & Germana Riddone for the CLIC team.
Drive Beam Injector Drive Beam Accelerator X 2 Delay Loop X 5 Combiner Ring Two-beam Test Area 3.5 A  s 150 MeV 35 A ns 150 MeV 150 MV/m 30.
Nextef status and expansion plans Shuji Matsumoto for KEK Nextef Group /5/51 4th X-band Structure Collaboration Meeting, CERN.
High-efficiency L-band klystron development for the CLIC Drive Beam High-efficiency L-band klystron development for the CLIC Drive Beam CLIC workshop,
R. Corsini CLIC work-package planning meeting 2-3 November 2011 Introduction to the session.
Feasibility and R&D Needed For A TeV Class HEP e+e- Collider Based on AWA Technology Chunguang Jing for Accelerator R&D Group, HEP Division, ANL Aug
Status of CTF3 G.Geschonke 1CTF3/CLIC Collaboration Board
Two-beam module layout
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
TBL experimental program, evolution to RF power testing in TBL ACE 2011, February 2-3Steffen Döbert, BE-RF  Current status of TBL  Experimental program.
CALIFES A proposed electron beam test facility at CERN
Work packages : Overview of experimental verification, CTF3 and CLIC Zero R. Corsini for the CLIC/CTF3 Collaboration Basically all WP scientific and.
WP5 Elliptical cavities
Uppsala Commitment to ESS and FREIA Planning
Accelerator Research and Innovation for European Science and Society
Ideas for medium and long term facility upgrade Roberto Corsini for the CLIC Accelerator Collaboration.
TBL, Status, Plans, Experiments
Have a chance to operate your own beam at CERN
CTF3 Collaboration Technical Meeting January 2008
What Should We Do?.
ESS RF Development at Uppsala University
CLIC Drive Beam Klystron Modulators
CLIC Drive Beam Stabilisation
Measurements, ideas, curiosities
Superbeams with SPL at CERN
Explanation of the Basic Principles and Goals
CLIC Feasibility Demonstration at CTF3
The SPL-based Proton Driver at CERN
Presentation transcript:

R&D proposals for EuCard 2 EuCard2, April 21Steffen Döbert, BE-RF  SRF basic research (W. Weingarten)  CTF3 and CTF3+, possible infra - structure for nc rf experiments  High Gradient research with 12 GHz klystron based test stand

SRF basic research W. Weingarten  Preparation of Nb3Sn samples to be validated on quadrupole resonator: Substrates niobium and copper; Coating by thermal diffusion of Sn into Nb in a dedicated furnace and by co-sputtering of Nb and Sn; equipment needed: furnace with T ≈ 1100 C, co-sputtering equipment; final validation of optimized procedure on 704 MHz mono-cell cavity Focus on new materials and understanding Q-slopes Partners and synergies: Would go well together with proposal from HZB, 704 MHz on loan from CEA

CTF3 and CTF3+  CTF3 is already a large collaboration  CTF3 represents important infra structure which can be used by JRA’s  Topics should be in line with CLIC goals (Example PSI proposal for wake field monitors)  Not clear how CTF3 upgrades would fit in this work package  There are already JRA in Eucard for nc structures Partners and synergies: PSI, CEA, Cockcroft, INFN, Uppsala University, …

X-band test stand  Unique test stand to do high gradient research (we are already building one and planning for more)  Infra structure which can be used by collaborators  Several institutes have similar plans: CEA,PSI, Groeningen, Upsalla  Topics: Development of a novel 12 GHz pulse compressor and high power rf components Solid state drive amplifiers 1-2 kW to replace TWT’s Low level rf and diagnostics High gradient testing of specific structures (for example x-band crab cavity) Structure preparation and fabrication Partners and synergies: PSI, CEA, Cockcroft, Groeningen, Uppsala University, …

X-band test stand

CLIC-ACE, Frank Tecker Slide 6 CTF3 limitations Combined beam current, limited to ~ 30 A (possibly more for shorter pulses) Pulse length limited to 140 ns (instead of A – alternative: 15 A, < 280 ns Total drive beam peak power (now ~ 3.5 GW – CLIC 240 GW) Combined beam current, limited to ~ 30 A (possibly more for shorter pulses) Pulse length limited to 140 ns (instead of A – alternative: 15 A, < 280 ns Total drive beam peak power (now ~ 3.5 GW – CLIC 240 GW) DBA CRDL TBTS CLEX CTF3 CTF2 #1 #2 #3 <30A 14 A 4 A 140 ns < 280 ns ~ 1200 ns

CLIC-ACE, Frank Tecker Slide 7 Present girder Ultimate ? girder About 120 MeV for final beam current of about 28 A Total beam power 3.3 GW e.g., enough to feed 24 accel. structures (final drive beam energy 50 MeV) About 200 MeV for final beam current of about 28 A Total beam power 5.7 GW e.g., enough to feed 50 accel. structures (final beam energy 50 MeV) 45 MW35 MW CTF3 beam power upgrade

CLIC-ACE, Frank Tecker Slide 8 DRIVE BEAM LINAC CLEX CLIC Experimental Area DELAY LOOP COMBINE R RING 10 m Phase & energy measurement Fast feed-forward kicker in final compression line Phase measurements & feed-forward Phase monitor being developed (FP7) for 2012 INFN, Oxford University, CERN

CLIC-ACE, Frank Tecker Slide 9 Integration of test modules in CLEX A. Solodko CLIC modules in CLEX 3 modules to be tested with beam and RF module layout compatible with CLEX requirements: double length PETS feeding two accelerating structures accelerating structures with all technical systems and damping features First module to be ready by end of 2011 FP7 involved

CLIC-ACE, Frank Tecker Slide 10 Plans for TBL beyond 2012 Upgrade to TBL+ as a test facility relevant for CLIC TDR work 12 GHz power production for structure conditioning less pulses than klystron test stand but: use of ON/OFF mechanism of PETS precondition with klystron and then with beam => develop conditioning scenario for CLIC conditioning with beam conditioning of PETS Working experience with a real decelerator Power production as a function of beam parameters, alignment, stability, pulse shape, phase stability, beam loses, failure modes Test bed for PETS development, ON/OFF, new designs, etc Beam dynamics studies, pulse shaping, feedbacks, etc

TBL in CLEX 4 PETS tanks installed

Plans for TBL beyond 2012 How could it look like

Conclusions  SRF topics of thin films and alternative materials is clearly interesting for CERN  CTF3 and x-band test stand can be a partner to support or anchor some JRA’s aiming for high gradient research and nc-topics  CTF3 upgrade is properly not fitting in to this work package directly  Need a bit more time to discuss internally given the short notice to come up with proposals