Model Railroad Operations Prepared by Dick Roberts, MMR My thoughts on the subject, presented with the assistance of all those operators who have gone.

Slides:



Advertisements
Similar presentations
Create a Detailed CTC Machine Model with JMRI/PanelPro
Advertisements

Card Order Basics. Card Order Basics What is It? –An advanced scheme for operating a model railroad –Allows for a realistic means of determining what.
GIS Data in Real-Time Transit Management Systems 2011 GIS in Public Transportation Conference St. Petersburg, FL, September 14, 2011.
OR Modeling in Intermodal: Intermodal Railcar Management Dharma Acharya, Jagadish Jampani, Aihong Wen.
Model RailRoad Manager Simulate Prototype Operations on your Railroad.
For Personal Use Only This presentation contains copyrighted material. PLEASE DO NOT COPY OR DUPLICATE. NOT FOR COMMERCIAL USE. For Personal Use Only This.
Model Railroading Operations 101: Part 4 – Advanced Topics Seminar - Tom Crosthwait President, Mogollon & Southwestern RR & Fred Bock, MMR, Chief Dispatcher,
Operations on the BDMRR Dispatching for the Birmingham District Model RR.
Production and Operations Management
SCORT/TRB Rail Capacity Workshop - Jacksonville Florida1 1  A Primer on Capacity Principles  New Technologies  Public Sector Needs 22 September
Model Railroad Concepts and Design With CAD Todd Arnett Plumbing Systems Designer 35,500 Hours Seat Time Using AutoCad.
Or Stop that train going round and round It’s making me giddy!! This presentation will run itself – no batteries required. If you are using Internet Explorer.
Signal Basics. Signals: –Allow for safe operation of trains – protecting your train, other trains, and the equipment –Lets the railroad operate more efficiently.
PRINCIPLES OF COMPUTATION PROBLEM SOLVING. WHAT IS COMPUTATION & COMPUTING  Computation is a process of performing computations or calculations. Just.
Local Switching Operations Steve Prevette PNR Vice President Burnt Hills and Big Flats RR
Freight Car Forwarding Steve Prevette Burnt Hills & Big Flats RR Pasco WA Fluor Hanford City University.
Procedures Mrs. Hornsby’s Class.
Card Order Update Training March TOPICS Operations –Why, What & How –Call Board –Yards & Permissions –Operating Tips –Manifests Interactive Lessons.
Model RailRoad Manager Quick Start: Automated Traffic Generation.
Abstract The SEPTA Regional Rail system serves as an important network for the Philadelphia region, moving many commuters during the peak hours on suburb-to-city.
CE 515 Railroad Engineering Line-haul Operations Source: Armstrong Ch 13 “Transportation exists to conquer space and time -”
Realistic Operations for Model Railroaders by R. B. Trombley, MMR PSR – NMRA Rev May, 2011.
Chapters 10 & 11 Illinois Rules of the Road. Traffic Signals Traffics lights are red, yellow and green from top to bottom OR from left to right. Red means.
Traffic Flow Analysis Steve Prevette Burnt Hills & Big Flats RR Pasco WA Fluor Hanford City University.
TRAIN OPERATIONS IN THE GARDEN
1 February 2009 Analysis of capacity on double-track railway lines Olov Lindfeldt February 2008.
TRANSPORTATION PROCEDURES. WHY DO WE DO THIS?  Child safety is our top priority  Ensures that each child is picked up by a proper parent or guardian.
CHANGING A FLAT TIRE WHY ME! I’M GOING TO BE LATE TO SCHOOL.
Slide 1 ILLINOIS - RailTEC Capacity of Single-Track Railway Lines with Short Sidings to Support Operation of Long Freight Trains Ivan Atanassov, C. Tyler.
Using Model Railroad Switch List Software
Model RailRoad Manager Inventory Management. Inventory: Rolling Stock and Everything Else l Locomotive, Freight Cars, Passenger Cars, Caboose, MOW l Trackage.
Rail Related Research at IIT Madras
OPERATIONS – A Starter Kit
The printed circuit board (PCB) design
COPYRIGHT © AREMA : 1 of 21 Module 2: Train Operations.
Model Railroading Operations 101: Part 4 – Advanced Topics Seminar Tom Crosthwait President, Mogollon & Southwestern RR & Fred Bock, MMR, Chief Dispatcher,
RAILWAY INDUSTRY TRAIN PLANNING LEVEL 2 TRAINING Module 9 - The TOCs and Network Rail.
Mountain Empire Model Railroaders How to get the MEMRR Main Layout Up and running.
INTRODUCTION 1 What word comes to your mind to describe “ The attempt by two objects to occupy the same space at the same moment in time”
TMK Training. TMK So what are the Company’s training expectations? Give every Agent the support, motivation, and opportunity to be successful.
ACTIVITY. THE BRIEF You need to provide solid proof to your stakeholders that your mobile website meets the needs of your audience. You have two websites.
From Research Prototype to Production
Modeling the Interaction Between Railroad Freight Schedule Adherence and Asset Utilization Yan Dong* Joseph M. Sussman** Carl D. Martland** * Transport.
April 2012 Update Presented by 4D PNR and Jack Hamilton, MMR 1 Preparing for and Delivering a Clinic EduTRAIN™
Operations Railroad Communica- tions Hazmat & Safety Personnel.
EduTRAIN™ August 2015 Revision 11 Details Make The Difference.
Art 315 Lecture 5 Dr. J. Parker AB 606. Last time … We wrote our first program. We used a tool called GameMaker. The program we wrote causes a ball to.
TMK Agent training only. Not for sales use. Agent Training Agent training only. Not for sales use.
For Agent training purpose only. Not for sales presentations.LNL For Agent training purpose only. Not for sales presentations.LNL Training.
Review of Course Approach and Assignment on Class Discussions These slides from session 1 of the class and can be found on the class website.
How to Give a Clinic By Scott Perry & Steve Moore EduTRAIN™
Table of Contents Unit 1- Understand the Problem Unit 2- Gather Information Unit 3- Develop Solutions Unit 4- Implement A Solution Unit 5- Test and Evaluate.
Purpose of transmission. Objectives 1. Explain and secure destination of transmission 2. Tell about structure and principle of the transmission 3. Talk.
Create a Detailed CTC Machine Model with JMRI/PanelPro Other Clinics in this series: Introduction to Layout Control with JMRI/PanelPro Repeated 4:00 PM,
Let's jump right into our first circle activity. My name is _____, and if I were an animal I'd be a _____ because.... I demonstrate for my students: "My.
There are many holidays. At my school some of the holidays we celebrate are.
CONSOLIDATION OF RAILROADS What is Consolidation? What is Consolidation? Bringing several in to one. Bringing several in to one. Consolidation leads to.
Problem 3 ME 115 Final – Troy Topping. Initial Construction A box with m = 1250 kg is input to simulate the forklift Only half the mass is used since.
Square Plant Stand. TOOL: Radial Arm Saw NEXT STEP: Surface Planer RESULTS: Rough size pieces for 4 Legs. 33” long PROJECT Square Plant Stand PART Legs.
The printed circuit board (PCB) design §PCB design is part of the design process of a product in electronics industry. §PCB is a piece of insulating plastic.
UNIT IV TRACK CONSTRUCTION. POINTS AND CROSSINGS Point and Crossings are peculiar arrangement used in permanent way to guide the vehicle for directional.
High Frequency & Vocabulary Words Theme 4.3 First Grade.
School Based Intervention. Scenario In Mr. Smith’s class, homework is assigned three to four times a week. Students have been instructed to place completed.
Senior DesignSeattle Pacific UniversitySenior Design Design-1 Seattle Pacific University Stages of Engineering Design 1. Identify project and goals 2.
CE2303 Railway Engineering
Isfeld’s Differentiated Fridays
Kansas BEST Kickoff Day
How to write a compare and contrast essay!
Analysis of capacity on double-track railway lines
Using Your Agenda.
Presentation transcript:

Model Railroad Operations Prepared by Dick Roberts, MMR My thoughts on the subject, presented with the assistance of all those operators who have gone before me and survived to tell about it… or at least left a train sheet or at least left a train sheet EduTRAIN™

This is an EduTRAIN™ Clinic EduTRAIN™ Copyright © 2014, National Model Railroad Association, Inc.

“Realistic operation” is nothing more than the use of models in a manner that compliments the realism and care that went into their construction.” (Tony Koester-Realistic Model Railroad Operation) EduTRAIN™

What Is It? Simulation of prototype practices of train movement EduTRAIN™

What Is It? Can include: Can include: Switching operationsSwitching operations Yard operationsYard operations Train schedulesTrain schedules DispatchingDispatching Any combination of these Any combination of these EduTRAIN™

Why Do It? It’s fun It’s fun It’s challenging It’s challenging It tests the modeling work It tests the modeling work It makes the model railroad come alive It makes the model railroad come alive EduTRAIN™

Common Terms Facing Point/Trailing Point Facing Point/Trailing Point Run-around Run-around Setout (Spot) Setout (Spot) Off spotOff spot Pickup Pickup Saw-by Saw-by Doubling Doubling EduTRAIN™

F.P. T.P. Facing-point/Trailing-point turnout W E EB 1 2 EduTRAIN™

F.P. T.P. Facing-point/Trailing-point turnout W E WB 1 2 EduTRAIN™

Run-around Run-around A movement to place the engine at the opposite end of the train to shove cars into a facing point siding EduTRAIN™

Run-around Run-around EduTRAIN™

Run-around Run-around EduTRAIN™

Run-around Run-around EduTRAIN™

Run-around Run-around EduTRAIN™

Run-around Run-around EduTRAIN™

Run-around Run-around EduTRAIN™

Run-around Run-around EduTRAIN™

Run-around Run-around EduTRAIN™

Run-around Run-around EduTRAIN™

Run-around Run-around EduTRAIN™

Run-around Run-around EduTRAIN™

Run-around Run-around EduTRAIN™

Run-around Run-around EduTRAIN™

Run-around Run-around EduTRAIN™

Run-around Run-around EduTRAIN™

Run-around Run-around EduTRAIN™

Run-around Run-around EduTRAIN™

Run-around Run-around EduTRAIN™

Run-around Run-around EduTRAIN™

Run-around Run-around EduTRAIN™

Run-around Run-around EduTRAIN™

Run-around Run-around EduTRAIN™

Run-around Run-around EduTRAIN™

Run-around Run-around EduTRAIN™

Run-around Run-around EduTRAIN™

Run-around Run-around EduTRAIN™

Run-around Run-around EduTRAIN™

Run-around Run-around EduTRAIN™

Run-around Run-around EduTRAIN™

Run-around Run-around EduTRAIN™

Run-around Run-around EduTRAIN™

Run-around Run-around EduTRAIN™

Run-around Run-around Facing Point Switch EduTRAIN™

Setout/Pickup Pickup Setout EduTRAIN™

Setout/Pickup

Setout/Pickup

Setout/Pickup

Setout/Pickup

Setout/Pickup

Setout/Pickup

Setout/Pickup

Setout/Pickup

Setout/Pickup

Setout/Pickup

Setout/Pickup

Setout/Pickup

Setout/Pickup

Setout/Pickup

Setout/Pickup

Setout/Pickup

Setout/Pickup

Setout/Pickup

Setout/Pickup

Setout/Pickup

Setout/Pickup

Setout/Pickup

Setout/Pickup

Setout/Pickup

Setout/Pickup

Setout/Pickup

Setout/Pickup

Setout/Pickup

Setout/Pickup

Setout/Pickup

Setout/Pickup Setout Pickup EduTRAIN™

Setout/Pickup Offspot

Setout/Pickup EduTRAIN™

Setout/Pickup Setout Pickup Offspot

Setout/Pickup EduTRAIN™

Setout/Pickup

Setout/Pickup

Setout/Pickup

Setout/Pickup Setout Pickup EduTRAIN™ Offspot

Saw-by EduTRAIN™

Saw-by

Saw-by

Saw-by

Saw-by

Saw-by

Saw-by

Saw-by

Saw-by

Saw-by

Saw-by

Saw-by

Saw-by

Saw-by

Saw-by

Saw-by

Saw-by

Saw-by

Saw-by

Saw-by

Saw-by

Saw-by

Doubling Grade Schematic Track Diagram EduTRAIN™

Doubling Grade Schematic Track Diagram

Doubling EduTRAIN™ Grade Schematic Track Diagram

Doubling EduTRAIN™ Grade Schematic Track Diagram

Doubling EduTRAIN™ Grade Schematic Track Diagram

Doubling EduTRAIN™ Grade Schematic Track Diagram

Doubling EduTRAIN™ Grade Schematic Track Diagram

Doubling EduTRAIN™ Grade Schematic Track Diagram

What is Required A reliably operating model railroad A reliably operating model railroad A system for train movement A system for train movement EduTRAIN™

Reliable Operation (MR September 2006) Solid benchwork Clean, smooth track EduTRAIN™

Reliable Operation (MR September 2006) Reliable locomotives and rolling stock Wheels gauged and cleanWheels gauged and clean Coupler height and functionCoupler height and function Properly weightedProperly weighted Dependable electrical/control system EduTRAIN™

A System for Train Movement (Basic Requirements) Identify railroad’s customersIdentify railroad’s customers Identify car types for customersIdentify car types for customers Identify trains necessary to serve customersIdentify trains necessary to serve customers Set routesSet routes Schedule trainsSchedule trains Assemble trainsAssemble trains EduTRAIN™

A System for Car Movement Output can be: Output can be: Hand-written ordersHand-written orders Car card/waybillsCar card/waybills Manifest/Switch listManifest/Switch list Tab-on-carTab-on-car Manual or computer generated Manual or computer generated EduTRAIN™

Identify Railroad’s Customers Depending on layout type/configuration: Depending on layout type/configuration: On-line (within the layout)On-line (within the layout) Off-line (through staging)Off-line (through staging) Interchange (other railroads)Interchange (other railroads) Reclassification (yard operations,Reclassification (yard operations, re-assign cars, trains) re-assign cars, trains) Passengers (Are customers, too)Passengers (Are customers, too) EduTRAIN™

Identify Railroad’s Customers Types of cars needed Types of cars needed Consider:Consider: Shipping to… Shipping to… Receiving from… Receiving from… EduTRAIN™

Identify Railroad’s Customers A B C MAYBEVILLE EduTRAIN™

Determine car types for Customers A-Box, Flat B-Tank, Box C-Stock, Reefer MAYBEVILLE EduTRAIN™

Identify Trains EduTRAIN™

Train Types by Function Through (A to B, no stops) AB EduTRAIN™

Train Types by Function Local (A to B, serves customers on line) A XY Z B EduTRAIN™

Train Types by Function Turn (A to B to A, serves customers on line) A XY Z B EduTRAIN™

Train Types by Function Freight Freight Manifest, Hotshot, mixedManifest, Hotshot, mixed Passenger (through, local, turn) Passenger (through, local, turn) Transfer Transfer (Special train; movement between yards, other railroads) (Special train; movement between yards, other railroads) EduTRAIN™

Train Types by Class Scheduled Scheduled Have priority by class and directionHave priority by class and direction Have priority by timetableHave priority by timetable Extra Extra Priority determined by dispatcher/superintendent but usually lower than scheduled trainsPriority determined by dispatcher/superintendent but usually lower than scheduled trains EduTRAIN™

Assemble trains Determine maximum train length/# cars Determine maximum train length/# cars Determine destination/direction Determine destination/direction Block (group) cars by destination/direction Block (group) cars by destination/direction Assign engine Assign engine EduTRAIN™

Schedule trains Determine routes Determine routes Set frequency of pick-up/delivery Set frequency of pick-up/delivery Set priority for trains Set priority for trains Coordinate movements to minimize conflicts (on the tracks and in the aisles) Coordinate movements to minimize conflicts (on the tracks and in the aisles) EduTRAIN™

Getting Started Create a schedule or train list Create a schedule or train list Gather a group of like-minded modelers Gather a group of like-minded modelers Run trains Run trains Evaluate the session (usually done with the stimulation of cookies and coffee) Evaluate the session (usually done with the stimulation of cookies and coffee) Make changes Make changes Run trains Run trains Repeat Repeat EduTRAIN™

INPUT TEST EVAL CHANGE SCHEME CUSTOMERS CAR TYPES SCHEDULE TRAINS EduTRAIN™

Guest Operator 1.It isn’t YOUR railroad, but treat it like it is 2.Don’t “fix” things-let the host/hostess do it 3.Look with your eyes, not your fingers Hint: Keeping your hands on the throttle/uncoupling tool will help 4.If something malfunctions-notify the host/hostess 5.If you don’t understand how something works, ASK!!! 6.Thank your host/hostess EduTRAIN™

Resources Operations SIG- Operations SIG- EduTRAIN™

Run Trains, It’s Fun Run Trains, It’s Fun EduTRAIN™

The End EduTRAIN™