RISC Regulatory Monitoring Matrix Status in the pilot project Cecilia Lind, Project Officer, Safety Unit Brussels, 29 January 2014.

Slides:



Advertisements
Similar presentations
From Policy to Practice: Recommendations of the White Paper Ralf Hanatschek, International Bureau of the BMBF Ljubljana, June 13, 2008.
Advertisements

Session No. 4 Implementing the State’s Safety Programme Implementing Service Providers SMS
Organizational Governance
Research and Innovation Why does ERA Need to Flourish ERA - State of Play Octavi Quintana Trias Brussels, 19th April 2013.
FCMAT Response & Preparation: Process Outline October 25, 2006.
Safety Management Systems CAA Update. Scope  Background  Benefits  Policy development / RIS  NPRM  Advisory Circular  Sector engagement & participation.
RMS – a collaborative approach Presentation Lyn Dare & Stephen Larmour Authorisation & Audit Comcare.
INSTITUTIONAL MODELS FOR SCF PROGRAMMES IMPLEMENATION IN MEMBER STATES Viktoras Sirvydis, Lithuania CPMA.
Scandpower AS P.O. Box 3, N-2027 Kjeller, Norway Risk management in the Scandinavian railway industry Karl Ove Ingebrigtsen Vice president Sweden Norway.
What SMS means for an Operator’s relationship with the CAA
TRU Waste Processing Center Culture and Successful Implementation of an ISO Certified Environmental Management System Presented at the DOE ISM Conference.
Preparing Scotland’s first Records Management Plan Ava Wieclawska Records Manager.
1 CHCOHS312A Follow safety procedures for direct care work.
Session No. 3 ICAO Safety Management Standards ICAO SMS Framework
Railway Safety Management Systems: Experiences to Date and Lessons Learned Presentation to IRSC 2005 Luc Bourdon Director General, Rail Safety Transport.
Safety Driven Performance Conference 2013 The future of managing asset-intensive businesses John Keefe APM/RBMI Technical Manager Asset Integrity Services.
Basics of OHSAS Occupational Health & Safety Management System
SEMINAR Ethics Committees or similar within SAIs Lisboa, January 2014.
1 DOE IMPLEMENTATION WORKSHOP ASSESSING MY EMS Steven R. Woodbury
Planning for Continuing Professional Development – A Whole School Approach A step by step guide to planning CPD including a framework for Teacher Induction.
Wednesday 13 th February 2013 Ramside Hall, Durham Process Safety Management – Challenges for Implementation Allan Laing, CEO, Pentagon February 2013.
APLA ORGULLO DE PERTENECER.
Module N° 8 – SSP implementation plan. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts.
Supporting European Rail Accident Investigation Inter national Rail Safety Conference Sweden 29th September 2009 Dr Jane Rajan Head of sector : safety.
2015 Safety Action Plan & Regulatory Strategy California Public Utilities Commission January 29, 2015.
Work. in tune with life.. The ENWHP Founded 1996 Secretariat 31 Members Luxembourg Declaration Core Goals: To establish WHP infrastructures To disseminate.
A Strategy for an Effective Accident Prevention Program
Improving Nurse Record Keeping NORTHERN IRELAND NURSING/MIDWIFERY AGENCY EVENT FRIDAY 25 TH JANUARY 2013.
Stress Management Background Stress – largest single cause of sickness absence Currently accounts for approx 23% absence within Children’s Services Directorate.
1 Thank you for visiting our site and welcome to the “Introduction to ISO 22000” Presentation that you requested. For more information.
ISO GENERAL REQUIREMENTS. ISO Environmental Management Systems 2 Lesson Learning Goals At the end of this lesson you should be able to: 
Bratislava april Preparation of an inspection plan: The Dutch approach Theo de Gelder Senior Inspector Regional Inspectorate South-West Dutch Ministry.
Designing tools for enhanced monitoring of railway safety performance of the European Union and its Member States Vojtech EKSLER & Cecilia LIND Safety.
JRC - IRMM – 17/18 June 2008 – EAQC-WISE project workshop – Held1 The EAQC-WISE blueprint: Recommendations for a quality control system for chemical monitoring.
FROM GAPS TO CAPS Risk Management Capability Based on Gaps Identification in the BSR Project Lead Partner: Fire and Rescue Department under the Ministry.
PROGRESS OF 5 YEAR HEALTH SECTOR DEVELOPMENT PLAN Department of Planning and Finance, Ministry of Health.
ISO Current status of development ​ ​ ISO development process ​1​1.
1 Processorientated statistical production IAOS Conference, October 16, 2008 Åke Bruhn, Director, Process Dept, Statistics Sweden.
1 Federal Office of Transport, Hannes Meuli, Roman Slovák Workshop on Rail Safety: Trends and Challenges, UNECE, Geneva, Schweizerische Eidgenossenschaft.
Occupational Safety and Health Reps, their role and functions in the EU.
Preparations of the Dutch IRRS-mission 1st ENSREG IRRS-WS Brussels, January 2014 By: R.Jansen (KFD)/A.Sedee (NIV)
Safety Objectives of European Railway Agency Raigo Uukkivi Estonian Railway Inspectorate DAGOB Final Conference , Tallinn.
ESI FUNDS & BEST PRACTICES V4+4 PRAGUE 25-27JANUARY, 2016.
Creating the environment for business Assessment of the Implementation by the Member States of the IPPC Directive Advisory Group Meeting Friday 13 th January.
Alex Ezrakhovich Process Approach for an Integrated Management System Change driven.
Learn Integrated Management System Documentation Process with Ready-to-use EQHSMS Documentation Kit
INVOLVING WORK PLACES and WORKFORCES Who has been involved: Catalonia: human resources, workers representatives, trade unions through the human resources.
CSM SP 1077/2012 Practice example CSM for Supervision 1.
1 Vereniging van Compliance Officers The Compliance Function in Banks Amsterdam, 10 June 2004 Marc Pickeur CBFA CBFA.
Coordinated action in the aviation sector to control public health threats Slides developed by the AIRSAN Coordinator, Robert Koch Institute, Germany.
Occupational Safety & Health: Management System (OSH-MS)
1 Joint Study on the European Social Partners Seminar on « The Employment Impact of Climate Change Policies » Brussels - 29 June 2010 Alain Mestre et Philippe.
Citizen’s Advisory Committee LVTI Community Center
in Radiation, Transport and Waste Safety:
Stephen Fennell The Role of the Regulatory Body
The European Investment Advisory Hub Support to CEF Blending
Marine Strategy Framework Directive (MSFD)
Draft note on Joint Action Plans
INCURSION REDUCTION TO INCREASE SAFETY IN ROAD WORK ZONES
Marine Strategy Framework Directive (MSFD)
"Financing Natura 2000 Guidance and Workshops”
How to build your Integrated
4th Meeting of Steering Committee on E&T December 4, 2012
Regulatory Scoping Exercise of IMO instruments
EFSA’s dedicated support for SMEs
Our Place mentoring Scheme Applying for APS
© Fresh Thoughts Consulting
Risk Management NDS Forum June 23rd 2010.
Management commitment and responsibility Safety accountability of managers Appointment of key safety personnel SMS Implementation Plan Coordination.
Presentation transcript:

RISC Regulatory Monitoring Matrix Status in the pilot project Cecilia Lind, Project Officer, Safety Unit Brussels, 29 January 2014

New initiative presented by the Safety Unit at RISC on the 5 th of June Aim: Better understanding of how the Member States are managing safety on a national level. Method: Organising and analysing already available data + fill in gaps with interviews, using a model of the railway risk regulation regime. Pilot run from autumn 2013 – June 2014.

Basic elementSub-element Level of performance STEERING Policy Leadership ORGANISING Establishment Structure Communication STAFFING Worker involvement Competence PERFORMING Target setting Supervision Approvals Accident investigation Monitoring EVALUATING Auditing Corrective actions

Example of MS evaluation

Activities in the pilot project Writing guidance document and prepare pilot (Jun-Sep) Kick-off meetings with Ministry, NSA and NIB representatives (Oct + Nov) Evaluations of Belgium and Sweden (Nov-Feb) Evaluations of Denmark, Ireland, the Netherlands and the United Kingdom (Feb-May) Feedback session with pilot participants (May) Final report (June) Benefits identified (so far): Tool for discussing the regulatory framework, finding improvement possibilities (both for MS and ERA) and best practice to be shared.

Thank you for your attention! Contact: (