 Read out strips production : We will provide 200 strips (100 RE4/2 and 100 RE4/3) Contract with Beijing Gaonengkedi Co. signed on 10-Aug., 3 RE4/2 and.

Slides:



Advertisements
Similar presentations
Councillor Egli Ward 9 Knoxdale- Merivale June 5, 2014.
Advertisements

Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Duke Production Status.
ALICE © | RRB | 17 April 2013 | Catherine Decosse 24 th meeting of the ALICE Resources Review Board CERN-RRB
-1- Wang, Li The 23rd MICE Collaboration Meeting to 17 HIT/CHINA WANG, Li Institute of Cryogenics and Superconductivity Technology.
Lab5 Production Status: Optics and RBX integration Pawel de Barbaro U. of Rochester.
Large-size micromegas for ATLAS (MAMMA) Status and prospects RD51 mini week, 17/01/2011Joerg Wotschack (CERN)1.
LHCb MUON MPWC STATUS OF TOOLING, SITES, PRODUCTION AND MATERIAL PROCUREMENT.
COBRA Magnet Test Milestone AssemblyDesignManufactoring DesignAss.TestWinding & Cryo. Deliv. PSI Test Platform Calibration Mapping device.
1 HBD Construction status Itzhak Tserruya DC meeting, BNL, February, 2006 Plans for Run-6 Box construction GEM assembly and testing Status of urgent items.
TGC Big wheel Sector assembly plan Tatsuo Kawamoto ATLAS workshop 2005.
Status of the PSD (Jan. 2009) F.Guber, INR, Moscow.
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
Electrical and Optical Cables Installation at P5 What When How H. Breuker
ALICE-LHCC Review May 14, 2001 Thomas C. Meyer/EP-AIT1 TPC Field Cage Progress Report Project Schedule Technical Progress & Prototyping Contractual Matters.
ATF2 quads status 22Nov05- Cherrill Spencer 1 Status Report on the Design and Fabrication of 29 quads for ATF2 By Cherrill Spencer, SLAC, for ILC-BDS weekly.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
The LST High Voltage System LST Readiness Review May 5, 2004 Klaus Honscheid Ohio State University.
LAT Design Integration and Analysis1 GLAST LAT Project1 Sep 2005 LAT Monthly Status Review 1 Sep 2005 Design Integration and Analysis LAT Monthly Status.
TOB Production - January of 688 rod frames ready. Production rate 3-4 rod frames/day. Shipments (40 rod frames/shipment) started from Helsinki.
GEM Industrialisation Plans with Korea CMS Minkyoo Choi, Inkyu Park, Minsang Ryu Univ. of Seoul Hyunsoo Kim Chonbuk National Univ.
SLHC Introduction to the “Workshop on Cryogenics and Vacuum Sectorization of the SPL” R. Garoby – 9/11/2009.
M. Gilchriese Sectors, Rings, Frame Assembly and Installation July 18.
RPC Upscope : An overview with Indian perspective L. M. Pant Nuclear Physics Division Bhabha Atomic Research Centre L. M. Pant India-CMS Meeting, BARC.
RPCs for CMS – Phase I Status report L. M. Pant BARC-NPD L.M.Pant India-CMS Meet, PU, Chandigarh 05 th April, 2007.
2 nd Design Update Presentation March 17, Overview Ground Segment Space Segment OBCTNCTransceiverAntenna PCTNCTransceiverAntenna Rx Tx Rx Tx Rx.
India-CMS Collaboration Meeting Chandigarh, 7-8 Oct 2004 Report to the Collaboration A. Gurtu.
 YE+4 disks = 2 Nos. (12 Sectors each)  Support Structures = 2Nos.  AISI 1045 steel bar = 1 No. for checking dimension of 680 mm (0/-0.5)  Fasteners.
India CERN Meeting, BARC, 28/02/11
12-nov-2003Muon Plenary, R.Richter1 Status of MDT elx and services ON-chamber –mezzanines –ON-chamber cables –hedgehog boards –CSM Motherboard –CSM Daughterboard.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
The status of RF components on Maria Filippova, RF components: Loads Phase shifters Attenuators Hybrids Splitters Directional couplers.
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
M. Brooks DC Meeting, 15-Sep-00 MuTr Mechanics Status SOUTH ARM: Chambers fabrication complete Stations 2+3 installed Station 1 test-installed will be.
Kentucky State Payment Plans PIO Facts PIO Facts PIO (Payment Installment Option) enrollment will begin Students will need to log-in.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
Contribution from Pakistan to CLIC & CTF-3 Project. NASIR ABBAS
Ian Crotty HPL (Bakelite) Up-Scope 27 Aug 08 HPL for the Up-Scope of the RE in CMS Contents Specification Contingency Supply Chain Purchasing QA & QC Packing.
LAr Week Feb 2000 M. Lefebvre Milestones and Schedule General Production Readiness Review  Passed in Jan 99 Leak Test Station and Electric Test.
Status Report for E391a (Continuation of the previous PAC on April) G.Y.Lim IPNS, KEK Group Meeting at the JINR 26 th – 29 th July 2003 Dzhelepov Laboratory.
1 G. Aielli for the RPC community. General information  BOE to be delivered in September  Detector design is over  Production facility reviewd and.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
Progress and plans for HO Installation S. Dugad, K. Sudhakar Tata Institute of Fundamental Research India-CMS Meeting at BARC, July 2005.
Status of the Spanish contribution to CTF3 L. García-Tabarés, F. ToralCERN, 17/9/2006.
Closeout. Sharing 2010 Straw production – Material study: CERN – Procurement (CERN) – Straw production: Dubna Electronics (CERN) Simulations, analysis.
W.Van Doninck February 2010 The CMS muon upscope Restore the TDR version of CMS  ME4 CSC’s and RE4 RPC’s on Yoke YE3  When ? During first long shutdown.
Chamber mechanics Chamber mechanics Production in China Peking University Group – 20 Aug
L. M. Pant1 RE Workshop, 19/11/12 Validation of RE4 Cu cooling systems for mass production Validation of RE4 Cu cooling systems for mass production L.
The CMS Muon System BAN Yong, Peking University 2006/12/12 IHEP, Beijing, China Outline: CMS-Muon system: introduction China’s contribution to CMS Muon.
TCDI Project Budget Update François-Xavier Nuiry May 10 th 2015 EN-STI-TCD.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
WP2 (Detector development) Summary Gabriella Pugliese INFN – Politecnico of Bari.
ELENA installation progress F. Butin / ELENA collaboration.
Module transport
University of Wisconsin
BSS Prep work at CERN and Acceptance of Parts
T1 status (a selection from EDR presentations)
SCHEDULE Nov 1st - Assembly Table Complete
Coordination meeting 12/05/15
Support Structure Fabrication
Far Detector Activities Late 2017 – Early 2018
TPC Field Cage Progress Report
Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May Jun
Status of CO2 Cooling tests at CERN for Pixel phase 1
Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May Jun
CMX scope and functionalities
Proposed Strategic Planning Process for FY 2013/14 thru FY 2015/16
HL-LHC upgrade at IPHC news
Back-End Payor Sub-Group
PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100%
East Hall under construction
Presentation transcript:

 Read out strips production : We will provide 200 strips (100 RE4/2 and 100 RE4/3) Contract with Beijing Gaonengkedi Co. signed on 10-Aug., 3 RE4/2 and 3 RE4/3 strips will be produced by 10 Sept., the rest 194 strips will be produced by 31 Oct.  Honeycomb box production: We will provide Honeycomb 180 box (include screen box) Contract with Beijing Honeycomb Co. signed on 12-Aug., 3 RE4/2 and 3 RE4/3 boxes will be produced by 20 Sept., the rest 174 boxes will be produced by 30 Nov. RE4 mechanics production status Yong BAN, Peking University 03/09/2010

RE4 mechanics production status Yong BAN, Peking University 03/09/2010  Shipment to CERN: 1 st shipment: 3 sets of RE4/2+RE4/3 boxes plus all 200 strips will arrive CERN by 30 Sept. via air transport. 2 nd shipment: 174 boxes will arrive CERN by 31 Jan  Mr. Cai will work at CERN from 24 Sept. to 23 Nov. on test assembly of RE4 prototype, and help on high eta MPGD R&D.

 China will contribute 500k CHF (same as RE1 project)  Cost increase of RE4 production compare to RE1 : More chambers (200) than RE1 (160, actually 144 installed) More sophisticate fabrication: parts inter-changeable (CNC machine); foam filling; more complicate machining…. Raw material price increase in last 5 years; Chinese currency increase by 20% in last 5 years...  Our budget managed to produce all 200 strips and 180 honeycomb boxes (plus 3 man-year man power, corresponding to 500k CHF contribution) Budget for RE4 mechanics production Yong BAN, Peking University 03/09/2010

 to complete RE4 mechanics: 20 honeycomb boxes more, plus miscellaneous parts (patch panel, cooling and FE plates, inside chamber pieces etc.) which design are not finalized yet  Budget need (estimation): less than 60k CHF to cover above items.  Hope to find resource (Belgium? India? ) soon to catch up with the on-going production Budget for RE4 mechanics production Yong BAN, Peking University 03/09/2010