1 Military Base Standard Offer Program El Paso Electric.

Slides:



Advertisements
Similar presentations
© 2006 San Diego Gas and Electric. All copyright and trademark rights reserved. How to fund your Virtualization Project SDG&E 2007 Energy Efficiency Program.
Advertisements

COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP.
Investing in Energy Efficiency in your Business. Who we are What we do Resources on the back table… Contact information later…
The Power to Make a Difference PPL Electric Utilities April 2010.
A Future of Clean, Efficient Energy
Save Energy and Money PNM Energy Efficiency Programs
Energy Performance Contracting November 3, 2009 Performance Contracting December 11, 2009.
Step Up Payback Proposal Program “How-To” 9/4/07.
Grow your business with Dominion Power and Good Cents
NJ SmartStart Buildings New Jersey Higher Education Partnership for Sustainability (HEPS) January 20, 2012 Presenter: BPU President Robert Hanna.
Commercial Energy Efficiency Program GAPPA May 27, 2014.
AEP Texas Energy Efficiency / Demand Response Programs Russell G. Bego, EE/DR Coordinator AEP Texas September 24, 2014.
Energy Square 1111 “O” Street, Suite 223 Lincoln, Nebraska Website: Phone:
Commercial Energy Efficiency Program IFMA Luncheon July 16, 2014.
ENERGY PERFORMANCE CONTRACTS Field Office Staff Training November 17, 2010 Tedd T. Termunde, P.A Joseph E. Nemedi, F.A.
Texas Energy Efficiency. Overview of Energy Efficiency Program Offerings.
BPA Guidelines for Measurement & Verification of Energy Efficiency Measures Presented at Brown Bag Session November 29, 2006.
Allegheny Power’s Energy Efficiency & Conservation Programs Central PA ASHRAE Chapter Harrisburg April 20, 2010.
Indiana’s Clean Energy Credit Program (Energy Efficiency & Renewable Energy Set-aside) Roger Letterman Sr. Environmental Manager Office of Air Quality.
Connecticut Energy Efficiency Incentive Program Overview of Program February 2010 DPUC-Approved Energy Efficiency Incentives for Connecticut Electric Users.
SRC Application Process Fall 2014 Version: November 12, 2014.
Texas Large Commercial and Industrial Standard Offer Program Brown Bag Teleconference May 23,
State Incentives for Energy Efficiency Commercial and Industrial New Jersey Board of Public Utilities Office of Clean Energy Mona L. Mosser Bureau of Energy.
ON IT 1 Con Edison Energy Efficiency Programs Sustaining our Future Rebecca Craft Director of Energy Efficiency.
Solar Incentives for Arizona Public Service, Salt River Project, Tucson Electric Power.
Take A Load Off, Texas SM is provided by Oncor Electric Delivery LLC as part of the company’s commitment to reduce energy consumption and demand. Frontier.
Energy Performance Contracting Approach David Birr President Synchronous Energy Solutions.
1 State Allocation Board Hearing Solar Energy and Energy Efficiency Project Options for California Schools Mark Johnson, Energy Solutions Manager - Schools.
Upstate Energy Expo 2010 NYSERDA Program Overview March 30, 2010 Cheryl Glanton, Project Manager.
Rachel Weaver Program Manager Maryland Energy Administration
Genesis Solar Module Brochure ™
Hard-to-Reach Standard Offer Program October 9, 2012.
Background Established by law in 2008 via the Clean and Affordable Energy Act. District Department of the Environment (DDOE) oversees the contract. The.
SB 7 Energy Efficiency Programs
Highlights of Commission Activities Little Rock ASHRAE Monthly Meeting October 12, 2011 Presented By: John P. Bethel.
DTE Energy Commercial & Industrial Energy Optimization Program Energy Efficient, Sustainable Detroit DTE Energy Headquarters December 9, 2010.
Energy Efficiency Program Costs Project No Rulemaking to Amend Energy Efficiency Rule June 30, 2010.
Lisa F. | May 20, 2014 Introduction to Lighting Incentives & Process for Medium/Large Customers.
“Do Green” Two Options: Prescriptive Custom Prescriptive- -Must be running a MODULATING ROTARY SCREW AIR COMPRESSOR -Must be 75 Horsepower or Less Custom-
Demand Response: Keeping the Power Flowing in Southwest Connecticut Presented by: Henry Yoshimura Manager, Demand Response ISO New England September 30,
Assessing Electric Utility Incentives and Support Fred Yebra, P.E. Energy Engineer State Energy Conservation Office July 28, 2015 Presentation to the Association.
Sharyland Utilities’ 2014 Residential and Hard-to-Reach Standard Offer Program Workshop February 2014 Dial In:
Phoenix Convention Center Phoenix, Arizona ESPC Overview Project FinancingESPC Large and Small: The Basics of ESPC Tom Hattery, DOE-FEMP Federal Project.
2010 Massachusetts Energy Efficiency Programs July 1, 2010.
Demand Response: What It Is and Why It’s Important 2007 APPA National Conference San Antonio, Texas June 26, :00 a.m. to Noon Glenn M. Wilson Director.
Residential and Small Commercial/Industrial Standard Offer Program Billy G. Berny American Electric Power 13th Symposium on Improving Building Systems.
Week 7 Utility Data Analysis. Essential Elements Identify sources for obtaining utility data: paper form, electronically or from the internet Review utility.
Energy Efficiency Forum State of California/Investor Owned Utility Partnership Program Date: September 27, Partnership. A Unique Opportunity.
SELF-GENERATION INCENTIVE PROGRAM (SGIP) Website:
Overview of Governing Document for Weather-Sensitive ERS Pilot Project Stakeholder Workshop Mark Patterson, ERCOT Staff March 1, 2013.
Overview for Local Energy Committees February 10, 2016.
PECO Smart Ideas for Your Business Greater Philadelphia Association of Energy Engineers Mike O’Leary, PECO April 20, 2016.
1 Potomac Electric Power Company Case 9155 & Delmarva Power & Light Case 9156 EmPOWER MARYLAND DRAFT NON-RESIDENTIAL ENERGY EFFICIENCY AND.
Lack of dedicated building meter – Solution: Estimate square footage of Herberger in relation to total area serviced by meter – Estimate 12% of total.
1 The Power to Make a Difference Sustainable Energy Fund Workshop Bethlehem, PA March 23, 2012 Information in this presentation subject to change.
Hawaiienergy.com Graceson Ghen. hawaiienergy.com  Hawaii’s energy conservation and efficiency program  Administered by Leidos Engineering, LLC under.
Johnson Controls, Inc. — 1 1/6 2/6 4/6 5/6 1/4 3/4 1/2 WAHOO PUBLIC SCHOOL SENIOR/JUNIOR HIGH & ELEMENTARY ENERGY PERFORMANCE CONTRACT FEASIBILITY March.
1 Detailed EM&V Approach for each of BGE’s Proposed Conservation Programs January 10, 2008.
Energy and Environmental Solutions Company Confidential—Siemens Building Technologies 2008 SLS 242/342: Performance Contracting - Proposing Opportunities.
New Jersey Energy Efficiency, Generation & Resilience Funding Update
BLACK HILLS ENERGY 2016 Energy Efficiency Portfolio Annual Results Overview December 8, :00am – 12:00pm MST Mark James – Energy Efficiency Program.
Fort Stanwix National Monument Energy Audit Contract
Net Metering John McComb: P.E.
Elizabeth Hutchison February 26, 2016
State Allocation Board Hearing Solar Energy and Energy Efficiency Project Options for California Schools Mark Johnson, Energy Solutions Manager - Schools.
Net Metering John McComb: P.E.
Promotion of Energy Audits in Small and Medium Sized Enterprises
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
Watt, Why and How of Energy Efficiency Programs Available
New Jersey’s Clean Energy Program Direct Install for Small to Medium Sized Buildings New Jersey' Clean Energy Program includes a number of initiatives.
Presentation transcript:

1 Military Base Standard Offer Program El Paso Electric

2 Background  SB 652, enacted during the last legislative session, resulted in changes to Public Utility Regulatory Act (PURA).  SB 652 was a comprehensive bill to improve the prospects for maintaining military bases in Texas. By increasing energy efficiency and reducing energy costs, bases have a better chance of remaining open.  The legislation targets electric utilities that are located in areas that are outside of ERCOT.

3 Background  PUCT approved rules for this Program on March 4.  Applicable facilities in EPE service area are Ft. Bliss and ADAC.  The goal is to reduce aggregate electricity consumption (kWh) at these facilities by 5% before 1/1/2005.  Goal is 7,370,000 kWh  Incentive levels are higher than other standard offer programs being implemented by utilities under SB 7 (electric utility restructuring bill).  EPE is making $1.3 million in incentive funds available to achieve this goal.

4 What’s a Standard Offer Program?  Any energy efficiency measure meeting PUCT requirements can qualify. Not measure-specific.  EPE pays incentives based on the kW and kWh savings. Not tied in to measure costs.  Measure eligibility:  Retrofit or new construction measures  Permanently-installed measures only  Most renewable measures are allowed  Installed equipment must exceed minimum efficiency standards, if applicable.

5 Project Opportunities  HVAC  Lighting  Motor retrofits  Variable frequency drives  Controls  Process improvements  Fuel-switching from electric  Renewable energy projects, including wind and PV

6 Ineligible Measures  Measures with life less than 10 years  Removable measures (generally includes plug loads)  Cogeneration or self generation (except renewables)  Fuel switching to electric  Measures that rely on changes in behavior and require no capital investment  Projects that eliminate an existing function, or relocate existing operations outside the EPE service area.

7 EPE’s Role as Program Administrator  Oversee that programs follow rules and template guidelines  Review, approve or reject program applications  Verify and inspect that measures meet intended purpose  Administer incentive dollars  Provide outreach to project sponsors

8 The Role of the Project Sponsor  Develops a energy efficiency project that meets the requirements of the Program and Ft. Bliss.  Executes an agreement with EPE to deliver a specific quantity of kW and kWh.  Negotiates with Ft. Bliss to implement the proposed energy efficiency project.  Implements the project within the required timeframe.  Documents the installation and resultant energy savings.  Receives incentive payment from EPE.

9  Fort Bliss acting as its own project sponsor  Third-Party Project Sponsors ä A/C Dealers ä Insulation Contractors ä Energy Efficiency Service Providers ä Renewable Energy Project Developers ä A&E Firms ä Lighting Contractors ä Electrical Contractors Examples of Project Sponsors

10 Third-Party Project Sponsor Requirements  Third-Party Project Sponsors must have:  Adequate insurance  All appropriate licenses  References  Evidence of technical and managerial capabilities and experience  Evidence of financial capability

11 Comparison with Other SOPs Military Bases SOP  Goal is kWh, not kW  Better for motor drive and other high-load factor projects  No limit on lighting projects  Higher payments  Expedited project approval and payments.  Ft. Bliss can act as its own project sponsor. Other SOP  Emphasis is peak demand.  Reduced payments for high load factor projects  May require a deposit.  Most projects are lighting only.  Most project sponsors are third-party ESCOs.

12 Standard Incentive Payment  Demand payment: $ per kW of peak demand savings  Energy payment: $0.095 per kWh of annual energy savings  All incentives are paid directly to project sponsor.

13 “Hard-to-Reach”  Projects that benefit “hard-to-reach” customers, such as certain personnel living in military housing units, may be eligible for the HTR incentive payments of $556.58/kW and $0.19/kWh.  EPE estimates that the majority of family housing for E-1 through E-3 grades would qualify as hard-to- reach households, and that many additional units for grades E-4 through E-6 are also hard-to-reach, with over 1,000 potential hard-to-reach units.

14 Incentive Payments  Certain projects are eligible for a eligible for a 20% adder, since El Paso is in an EPA non-attainment area.  Previous energy efficiency projects implemented under SB 5 have qualified for the higher payment.  Projects that would not have been implemented without the adder are eligible.  With the adder:  Standard incentive payments are: $ per kW and $0.114 per kWh.  HTR payments are $ per kW and $0.224 per kWh

15 Incentive Payment Example #1  A local HVAC dealer installs 30 high-efficiency AC units, varying in size from 2.5 to 5 tons, and in SEER rating, from 13.0 to Using the deemed savings table for central air conditioners, the total kW savings is 24.9, and the annual kWh savings is 42,750. The incentive payment is calculated as follows:  (24.9 x $278.29) + (42,750 x $0.095) = $10,991  (24.9 x $333.95) + (42,750 x $0.114) = $13,189 with 20% environmental adder  (24.9 x $668.38) + (42,750 x $0.228) = $26,390 if installed on HTR-eligible units with 20% env. adder

16 Incentive Payment Estimates  The following are estimates only and not based on actual metered or measured data from Ft. Bliss:  4-lamp T-12 fixture retrofit: $38 (approximately 33,000 required to reach goal)  Energy Star residential refrig. retrofit: $115-$275 (approximately 8,500 required to reach goal)  3-ton 13 SEER central A/C unit: $282 - $887 (7,500)  10-ton rooftop A/C unit: $800 (1,750)  VSD for 250 hp water pump: $30,000-$35,000 (30)  1 mW wind turbine: $400,000 - $450,000 (3-3.5)  The value of the energy savings is not included in the above estimate.

17 Definition of Peak Demand Savings  The maximum average load reduction occurring during any one-hour period between 1 PM and 7 PM MDT weekdays, from May 1 through September 30 (holidays excluded).

18 Energy Savings M&V Options  Deemed Savings Option:  Deemed savings are pre-determined savings values for most of the common energy efficiency measures. These kW and kWh values have been approved by the PUCT.  Incentive payments for all measures shown previously are based on deemed savings.  Project Sponsor accepts deemed savings values for measures installed and receives 100% of incentive payment after submitting an installation report.

19 Energy Savings M&V Options  Project Sponsors may choose to not accept deemed savings estimates, and to perform measurement and verification (M&V) activities.  For measured savings, actual kW and kWh measurements are required to determine incentive payments.  Project Sponsors must submit a measurement and verification (M&V) plan with project application.  Certain measures do not have a deemed savings values.

20 Program Steps  Project Application  Initial Application  Final Application  Pre-installation inspection / metering  Installation report  Post-installation inspection  Installation payment  Energy savings measurement and verification (M&V)  Savings report  Final incentive payment

21 Initial Application for Third-Party Project Sponsors  IA includes sponsor qualifications  Identifies intended measures (20 kW savings minimum)  Estimates kW/kWh savings and incentive payments  EPE reviews the IA for sponsor and project eligibility.  Approximately 14-day review period  Upon approval, EPE reserves funds for the project.  Letter of intent from Ft. Bliss  The letter should include a summary description of the project and indication of Ft. Bliss’ level of interest in implementing the proposed project, should the project sponsor’s application be approved. Not required for Ft. Bliss.

22 Final Application for Third-Party Project Sponsors  Detailed project description  Savings calculations and incentive estimates  Equipment surveys (use standard forms)  Proposed M&V plan  Finalized work plan for completing the project within the required timeframes  Due within 30 days of initial application acceptance  Agreement with Ft. Bliss not required with final application, but must be submitted within 30 days after project go-ahead. Not required for Ft. Bliss.

23 Installation Report  Updated project implementation information  The demolished and actual installed retrofit equipment inventories, including equipment counts, equipment efficiencies, and equipment nameplate data.  Updates to occupancy or equipment or occupancy schedules  Updated engineering calculations estimating energy and demand savings  Final M&V plan details

24 Savings Report and Final Payment  If the project sponsor is using simple of full M&V, the project sponsor should submit a savings report after all M&V activities are complete. This report should document the actual demand and energy savings measured for the projects.  Total project payment due less installation payment will be made after invoicing by project sponsor.  If deemed savings are used exclusively, the project sponsor doesn’t need to submit a savings report.

25 Program Timeline

26  Program Web site has:  Latest program announcements  Latest version of program manual for download  Support files: ä Deemed savings ä Installation standards ä Lighting spreadsheets  Helper applications  Information on available funding  Program contacts and links

27  Mr. John Armstrong - Program Manager  Phone  - Contact Information