CFL Lighting Scheme – Bachat Lamp Yojana CDM Requirements.

Slides:



Advertisements
Similar presentations
UNFCCC Complexities in demonstration of additionality of a POA: Perspective of a Project Developer 8 th May 2011 Gareth Phillips Chairman, Project Developer.
Advertisements

Difficulties in Verification of a PoA: DOEs Perspective by Dr. Kaviraj Singh Workshop on Programme of Activities (PoA) under the CDM: Challenges and Road.
DNV Climate Change Services AS: Trine Kopperud 05 May 2011 DOEs perspective: DOE Liability in context of PoA Workshop on Programme of Activities under.
CONOR BARRY, Team Lead OSD UNFCCC Secretariat SDM programme Setting expectations of the workshop Bonn, 7- 8 May 2011 Workshop on Programme of Activities.
PoA Challenges & Opportunities
PoA for CFL lighting (using AMS-II.C.) A Case Study - Cuidemos Mexico May 2011.
UN Climate Change Secretariat CDM Project Cycle calibration 1 st Sustainable Development Mechanisms Joint Coordination Workshop Bonn, Germany, March.
Regional Distribution
A Project Developers view on lessons learned and challenges with PoAs (module 2.2) 24 March 2012 Mischa Classen Executive Committee, Project Developer.
PoA AFTER Cancun - READY TO TAKE OFF NOW
Zertifizierung Project Cycle – Programme of Activities 7th CDM Joint Coordination Workshop Jun Wang; TÜV NORD CERT GmbH
Implementation of PoA standards The point of view of a DOE Environmental Management and Climate Change Regional Workshop, ISO/TC 207 WG. Bonn, 24 – 25.
Defining Standardized Baseline: The role of DNAs Malin Ahlberg Co-Chair of the DNA Forum 13 March 2011, Bonn.
SDM programme, UNFCCC secretariat Wenxin Li, Programme Officer Overview of PoA Standards SDM JOINT COORDINATION WORKSHOP Bonn, Germany, March 2012.
Best Practices on PoA Development Dr. Oscar Coto II National CDM Workshop Belize August 2011.
CDM Based DSM Initiative in India Presentation by Saurabh Kumar Secretary Bureau of Energy Efficiency Vienna, April, 2009.
C ARBON P ARTNERSHIP F ACILITY 1 A PRIL 2014 S ELLER P ARTICIPANT T RAINING O VERVIEW OF CPA S PREPARATION AND INCLUSION C ASE STUDIES AND E XPERIENCE.
Improved Cook Stoves for East Africa (ICSEA) Ltd Bonn, May 7/8, 2011.
Validation and Verification of CDM Projects Climate Change Kiosk on CDM/DNA, COP9 December 6, 2003 Marco van der Linden SGS Climate Change Programme.
BLY CPA Verification- A DOE’ Perspective Archak Pattanaik New Delhi,
FOCUS: MITIGATION A glance at post-kyoto Louis Perroy, ClimatEkos 1 September 2011, Vientiane, Lao PDR.
1 Rajesh Kumar Sethi Chair of the CDM Executive Board Clean Development Mechanism 1-3 April 2008 Bangkok, Thailand AWG-KP 5 In-session workshop on means.
UNFCCC secretariat Overview of the PoA and business models Training-Workshop on the “Uganda Municipal Waste Compost Programme” 21st -24th Oct 2013, Mukono.
Presentation title Session 3: The Concept of Programme of Activities (PoA) PoA Registration and CPA inclusion Training-Workshop to support the “Uganda.
TÜV SÜD South Asia Programme of activities (PoA) - Requirements & Challenges in CPA inclusion By Vijayanand TÜV SÜD South Asia
CONFERENCE OF BEE EMPANNELLED CFL INVESTORS / MANUFACTURERS FOR IMPLEMENTATION OF.
UNFCCC Secretariat Latest updates on PoAs rules including multicounty PoAs Karen Ortega Regional Workshop (31 August - 2 September), Bogota, Colombia.
Programmatic CDM – How is it different? Dr. Soren E. Lütken UNEP Risoe Center.
CDM PoA CPA. What is a Programme of Activities? Definition: A programme of activities (PoA) is a voluntary coordinated action by a private or public.
Programmatic CDM Joergen Fenhann DFC 9. August 2011.
UNFCCC Secretariat Overview of the CDM and the CDM project Cycle Training-Workshop to support the “Uganda Municipal Waste Compost Programme” Kampala, Uganda,
SDM programme UNFCCC secretariat Session 2: The CDM project cycle Monitoring, Verification and CER issuance Training-Workshop to support the “Uganda Municipal.
T HE W ORLD B ANK C ARBON F INANCE U NIT PoAs and liability – the issue P RESENTATION AT UNFCCC P O A WORKSHOP M AY 2011 BY F ELICITY S PORS (F
CDM Project Cycle Carbon Markets – CDM project development, 8. August 2010 Jørgen Fenhann.
C ARBON P ARTNERSHIP F ACILITY 1 A PRIL 2014 S ELLER P ARTICIPANT T RAINING O VERVIEW OF P ROGRAM AND CPA L EVEL M ONITORING, P REPARATION OF M ONITORING.
UNFCCC Secretariat Status of negociations on CDM Perumal Arumugam Regional Workshop on CDM and NAMAs for Latin America and the Caribbean,Bogota, (31 –
UNFCCC How to address DOE Liability in context of PoA: Perspective of a Project Developer 8 th May 2011 Gareth Phillips Chairman, Project Developer Forum.
CARBON CONTRACTS - the PCF experience September 30, 2002.
Overview of BioCF ERPA terms December 15, 2005 The World Bank, Washington, DC.
· © 2012 Perspectives GmbH PoA Standards Courtney Blodgett Joint Coordination Workshop, Bonn 24 March 2012.
Introduction to Climate Change: - global warming - basis steps in a clean development project - connection of CDM with European Trading Scheme Wim Maaskant.
Lima, Perú, October 22 nd, 2009 Programme of Activities: Challenges and Opportunities IV Seminario Internacional: Mercado del Carbono Presented by Alberto.
PDD Preparation Cairo, June 14 th -15 th, 2004 TIMS/EEAA CD4CDM- Third National Workshop (Phase II) UNEP RISO / APEXPDD Preparation Process and Format.
CFL Lighting Scheme CDM based “Bachat Lamp Yojana” Initiated by.
TÜV SÜD Industrie Service GmbH Workshop on PoA under the CDM: challenges and the road ahead - Bonn 8/9 May 2011 Session 9.1 „Application of Sampling in.
EESL’s perspective on implementation of Bachat Lamp Yojana N.Mohan (Asst. Manager) & Pramod Kumar Singh (Technical Expert) 16 th March, 2011.
1 st Management Review Meeting on 1 st Sept,2010 “Bachat Lamp Yojana” 3223.
How to develop a Carbon Finance project?. Assessment of tool - Is this landfill project feasible? Source:
CDM based CFL Lighting Scheme “Bachat Lamp Yojana” Initiated by.
CD4CDM Suriname, First National Workshop, April 2008 Climate Change and CDM Institutional Architecture Glenn S. Hodes UNEP Risø Center.
The African CDM Training Workshop and Preparatory UNFCCC COP9 Meeting Addis Ababa, Ethiopia, October 20 – 21, 2003 INSTITUTIONAL SET-UP FOR CDM Dr Youba.
The CDM Project Cycle. The first step -- submit a PIN (template on Description of Project Proponent Type of Project Location of.
WB Carbon Finance Project Cycle and Role of Key Players Introduction to Carbon Finance March 10, 2004.
Aviation Security Quality Controls A Blueprint for APEC Economies February 2006.
1 1/118 Welcome to Group Presentation 1/ /118 HPL Group – At a glance HPL Group established in 1956 with product range as: LT Switchgear & Electrical.
Best Practices for Preparing PoA- DD and CPA-DD UNFCCC Workshop on PoAs, 7 May 2011 Dr. Christoph Sutter CEO, South Pole Carbon Asset Management Patrick.
CDM Project Cycle & Project Design Document Project Design Document First Extended & Regional Workshops CD4CDM Project Siem Reap, Cambodia March.
Verification from PPs perspective Round table on A/R CDM projects Carbon Finance Unit – World Bank August 24&25, 2009 Walter Oyhantçabal A/R WG.
© 2006 UNDP. All Rights Reserved Worldwide. Proprietary and Confidential. Not For Distribution Without Prior Written Permission. CDM Project Cycle Anna.
TÜV SÜD Industrie Service GmbH Workshop on PoA under the CDM: challenges and the road ahead - Bonn 8/9 May 2011 Session 8.1 „Additionality in the context.
CDM Project Cycle LGED Bhaban, Dhaka 8 – 9 April 2008 Presented by Khandaker Mainuddin Fellow, BCAS.
Opportunities for Competitive Energy Services IEA DSM Task XVI Experts Meeting, Deventer, Netherland, 8-9 October, 2007 Abhishek Nath Bureau of Energy.
New Government Policy on Energy Efficiency By Subodh Kumar Scientist Central Road Research Institute New Delhi ,
TÜV SÜD Industrie Service GmbH CDM JCW Bonn 12 March 2011 Module 1.2 „existing barriers within the current PoA rules” An analysis from a DOEs perspective.“
UNFCCC secretariat, Sustainable Development Mechanisms programme Nashib Kafle, Associate Programme Officer Session 3: The Concept of Programme of Activities.
7th Joint Coordination Workshop “Improving efficiency in the operation of CDM” - DOE Viewpoints DOE/AIE Forum | Werner Betzenbichler | March 2011.
Integrating Carbon Finance into the Bank’s Work PCF project cycle.
1 CDM institutional framework Maria Netto UNFCCC secretariat Addis Ababa 21 October 2003
CDM Programme of Activities (PoA) Challenges and Solutions
CDM Activity Cycle under the Marrakech Accords
Presentation transcript:

CFL Lighting Scheme – Bachat Lamp Yojana CDM Requirements

History (1)

Current Process  Empanelment of Investor with BEE  Investor and DISCOM identify small scale project areas within BLY Program  Signing of Tripartite Agreement  Investor Develops small-scale project (the “CPA”) and submits to BEE  CPA is validated by a DOE  Investor secures financing for implementation  CFL distribution  Monitoring, strictly monitoring, of CPA following UN approved methodology and BLY Program design.  Verification and Allocation of CERs from CPA by BEE (as Coordinating and Managing Entity for the BLY Program)

Progress today  BLY PoA registered 29 April 2010  Number of CPAs included as of 20 Jan  Number of CFLs expected to be installedabout 25 to 17 millions (Based on 42 CPAs CFLs per CPA)  Number of CPAs implemented including CFLs in sockets duly verifiedless than 10%

CDM Requirements At time of implementation – many requirement, the most important include:  Develop and maintain database of each household provided with CFLs (by number and voltage)  Independently certified destruction of collected ICLs  Independently certified destruction of fused and/or broken CFLs  Verified completion of distribution  Verification of accuracy of database  Completion of CPA implementation and declaration of the Start Date for carbon crediting  Third party Monitoring Survey to establish percentage of CFLs distributed and maintained in sockets

Work Ahead Regarding CDM guidelines on Verification of PoAs. EB 55 – Annex 38 indicates:  only a Designated Operational Entity (DOE, i.e. DNV, TUV Sued, TUV Rheinland, etc.), who has not performed validation/inclusion/renewal of crediting period activities for the PoA shall process verification. BEE is requesting to allow the same DOE to perform several functions (inclusion, verification, etc.).  request for issuance shall relate to all CPAs included in the PoA during the specified monitoring period. BEE is requesting to change language and intention for requests shall relate to all CPAs implemented by the same operator [Implementer/Investor] that are included in the PoA during the specified monitoring period. Regarding implementation. Sharing of experience in the implementation and verification process between BEE, DISCOMs and Implementers will benefit of all parties; hence, the request to BEE to facilitate such exchange.

Further information or queries to: Isabel Alegre Operations Director C-Quest Capital