1 PMT Base Prototypes Comparison using DOMMB ATWD August 6, 2003 Nobuyoshi Kitamura UW-Madison / SSEC.

Slides:



Advertisements
Similar presentations
18 Bit ADC Status Collaboration meeting May 18, 2007.
Advertisements

Controller Tests Stephen Kaye Controller Test Motivation Testing the controller before the next generation helps to shake out any remaining.
APEX /IntegUSB Digital Front End Acquisition Interface and Nuclear Medicine Processing Software for APEX Gamma Cameras.
Introduction to electronics lab ENGRI 1810 Using: Solderless prototype board (white board) Digital multimeter (DMM) Power Supply Signal Generator Oscilloscope.
Chapter 7 Input Modules.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting Feb, 13, 2008.
Jianchun (JC) Wang, 08/21/99 RICH Electronics and DAQ Chip Carrier Short Cable Transition Board Long Cable Data Board Crate J.C.Wang Syracuse University.
The Oscilloscope: Basic Features & Functions  Source –Determines which signal is compared to the trigger settings.  Level –Determines where on the edge.
Mainz: Contributions to the LArg-Calorimeter Purity monitoring of the liquid argon and temperature measurement in the three cryostats - Old electronics.
Jianchun Wang Syracuse University 10/16/99 CLEO Meeting Outline DAQ problems solved Recent results Status of DAQ Work to be done.
Electric Curcuits and Measurements Basic Electrical components and their functions Measurements of electrical circuits characteristics - Multimeter - Oscilloscope.
1 AC Measurements Using the Oscilloscope and Multimeter by Mr. David Fritz.
PMT Modular HV Supply Design Status December 2003 Madison Instrumentation Workshop Nobuyoshi Kitamura UW-Madison.
Preliminary Design Review May 20, 2003 PMT HV Base Board Engineering Requirements Nobuyoshi Kitamura SSEC / UW-Madison.
Review, May 5, 2004Lawrence Berkeley National Laboratory DOM MB Hardware CDR and PRR, May 5, 2004 Gerald Przybylski Lawrence Berkeley National Laboratory.
DOM Input Issues: PMT Output, ATWD input, and Trigger Comparator Design Criteria ICENOTE105 DOM input issues Gerald Przybylski Lawrence Berkeley National.
1 S. E. Tzamarias Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Readout Electronics DAQ & Calibration.
1 System Description (2-4) Gains from single photo-electrons in vacuum at room temperature (5-8) Linearity Test at V in vacuum at room temperature.
Genuine random number generator demo software explanation What happens in this demo LeTech Co.,ltd.
Laguna Beach, CA March 30-April 1, 2003 PMT HV Base Board Development Nobuyoshi Kitamura SSEC / UW-Madison.
February, 2004CMS Tracker Week1 Sensor Stability Measurements Objective: find simple method of observing sensor stability -> measure fluctuations in overall.
Time calibration IceCube reconstruction workshop UMD, November 2004 Dmitry Chirkin, LBNL.
Data acquisition system for the Baikal-GVD neutrino telescope Denis Kuleshov Valday, February 3, 2015.
String-18 New-DAQ Commissioning Azriel Goldschmidt AMANDA Collaboration Meeting Berkeley, March 2002.
PAD MONITOR The TPC pad monitor is used to check the performance of the TPC electronics. It can display the amplitude vs time bucket histogram for all.
ENG3640 Review and Exam Question1 ENG3640 Microcomputer Interfacing Review & Final Exam Structure.
HV-Splitter for RENO Project S. Stepanyan, 김우영 경북대학교 Y.Kim Sejong University May-2008.
HBD FEE test result summary + production schedule 16mv test pulse result –5X attenuator + 20:1 resistor divider at input (to reduce the noise on the test.
UW Engineering DOM Studies Kael Hanson University of Wisconsin – Madison LBNL DOM Workshop 23 July 2003.
Monitoring EKG Lab Using Vernier Lab Pro by June Tuttle, Chatham Hall.
DOM Main Board Rev 3/Rev 4 Status December 2, 2003 Gerald Przybylski Lawrence Berkeley National Laboratory.
PMT HV Base Prototypes Evaluation Instrumentation Workshop LBNL July 23-24, 2003 Nobuyoshi Kitamura University of Wisconsin-Madison SSEC.
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
Velleman Oscilloscope: Windows 7 by Mr. David Fritz.
PMT gain check at Indiana University. Test setup inside dark box LED white paper PMT # JT0298 channel #2 (per HPK numbering) OTHER CHANNELS MASKED WITH.
Using Banner Vision Products with OCS Controllers Ken Jannotta Jr. Horner APG August 2007.
Calibration of the gain and measurement of the noise for the apv25 electronics K. Gnanvo, N. Liyanage, C.Gu, K. Saenboonruang From INFN Italy: E. Cisbani,
DOM Main PCB Testing Gerald Przybylski October 23, 2002 Lawrence Berkeley National Laboratory.
5 June 2002DOM Main Board Engineering Requirements Review 1 DOM Main Board Software Engineering Requirements Review June 5, 2002 LBNL Chuck McParland.
LC Power Distribution & Pulsing Workshop, May 2011 Super-ALTRO Demonstrator Test Results LC Power Distribution & Pulsing Workshop, May nd November.
Feature Extractor Dima Chirkin, LBNL The future is here.
HAPPEX DAQ / ADC Tests Luis Mercado UMASS 4/17/09.
DOM MB Test Results at LBNL Main Board Readiness Status Review LBNL, July 2003 Azriel Goldschmidt.
A Cockcroft-Walton HV-Generator / PMT-Base for NPS Joshua Frechem Charles Hyde Old Dominion University 21 Jan 2016.
5 June 2002DOM Main Board Engineering Requirements Review 1 DOM Main Board Hardware Engineering Requirements Review June 5, 2002 LBNL David Nygren.
Beam Secondary Shower Acquisition System: BWS pCVD Measurements on SPS BA5 BWS51731 BE-BI-BL Jose Luis Sirvent Blasco 2 Jose Luis Sirvent.
ZDC Status A.Mestvirishvili Iowa. Quite while we had some problems with ZDC, QIE saturations, Reflections, Noise etc. To improve the situation several.
A. Tsirigotis Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Reconstruction, Background Rejection Tools.
Mouse Exercise Monitoring System Erik Lappinen, Brooks Alford, Elizabeth Smith, Matt Gallegly Advisors: Dr. Michael McDonald, Dr. Randall Reiserer Vanderbilt.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
1 Lab 4: D/A Converter Lab 4: D/A Converter This is a simple resistive network for a D/A converter Port 1, Port 0 are digital inputs ==> 00 (minimum),
PHOTOTUBE SCANNING SETUP AT THE UNIVERSITY OF MARYLAND Doug Roberts U of Maryland, College Park.
J.Maalmi, D.Breton – SuperB Workshop – Frascati – September 2010 Electronics for the two-bar test. D.Breton & J.Maalmi (LAL Orsay)
 13 Readout Electronics A First Look 28-Jan-2004.
ECAL Front-end development
Oscilloscope.
Commissioning the SIS3316 Digitizer
Development and Testing of Anti Hijacking system
Baby-Mind SiPM Front End Electronics
Data Acquisition (DAQ) Status
TDCB status Jacopo Pinzino, Stefano Venditti
BCTW calibration status and future
High-Voltage Supply Requirements Review
LLRF Controls Outline Requirements External Interfaces Schedule Design
A First Look J. Pilcher 12-Mar-2004
Front-end electronic system for large area photomultipliers readout
Time calibration Dmitry Chirkin, LBNL UC Berkeley, November 2004.
Jean-Francois Genat, Sam Meehan, Eric Oberla August 26th 2009
PATMOS-x AVHRR Solar Reflectance Calibration Update
Testing of the EMCO Prototype Boards
Presentation transcript:

1 PMT Base Prototypes Comparison using DOMMB ATWD August 6, 2003 Nobuyoshi Kitamura UW-Madison / SSEC

2 Method Terminal server connected by Python socket program* ATWD chan3 connected to LED pulser current (analog MUX = 2)* CPU trigger on ATWD#0 and capture data* (*Script by Kael Hanson) The rest was also done with a python script (by NK). Background (baseline measurement) with coax connected to dommb but the ribbon cable removed. 100 samples averaged and stored in a file (tagged with a dom ID). (Only 100 samples because of python program speed) Repeatedly captured waveforms (~1Hz), subtracted baseline and displayed on monitor. At random intervals, captured screen (ALT-”print screen”), and pasted to this document. Ten such screen shots are shown here for each configuration. The vertical scale is the ADC counts. 8/6/2003 N. Kitamura

3 Samples DOMMB only—stand-alone DOMMB in Chamberlin Hall accessed from PSL. The analog input was shunt with a 100Ohm resistor. EMCO—measured with DAC=0 (HV=0) and DAC=2000 (HV=1000V). Old Iseg—single ground configuration. Measured with DAC=0 and without enableHV(), but the on-board oscillator was always on. New Iseg—the split grounds were bridged with a 1MOhm resistor. In addition, the “clean ground” wire was on. The measurement was done under the same conditions as Old Iseg. 8/6/2003 N. Kitamura

4 Summary / Conclusion (tentative) Fairly large noise is seen in chan0 even with no HV base connected to DOMMB. (Is this a fair measure of the input channel quality?) All the HV base configurations introduce noise to some extent The EMCO base and Old Iseg add somewhat comparable levels of noise to the channels The New Iseg introduces very high levels of nose 8/6/2003 N. Kitamura

5 DOMMB only 1 8/6/2003 N. Kitamura

6 DOMMB only 2 8/6/2003 N. Kitamura

7 DOMMB only 3 8/6/2003 N. Kitamura

8 DOMMB only 4 8/6/2003 N. Kitamura

9 DOMMB only 5 8/6/2003 N. Kitamura

10 EMCO (dac=0) 1 8/6/2003 N. Kitamura

11 EMCO (dac=0) 2 8/6/2003 N. Kitamura

12 EMCO (dac=0) 3 8/6/2003 N. Kitamura

13 EMCO (dac=0) 4 8/6/2003 N. Kitamura

14 EMCO (dac=0) 5 8/6/2003 N. Kitamura

15 EMCO (dac=2000) 1 8/6/2003 N. Kitamura

16 EMCO (dac=2000) 2 8/6/2003 N. Kitamura

17 EMCO (dac=2000) 3 8/6/2003 N. Kitamura

18 EMCO (dac=2000) 4 8/6/2003 N. Kitamura

19 EMCO (dac=2000) 5 8/6/2003 N. Kitamura

20 Old iseg 1 8/6/2003 N. Kitamura

21 Old iseg 2 8/6/2003 N. Kitamura

22 Old iseg 3 8/6/2003 N. Kitamura

23 Old iseg 4 8/6/2003 N. Kitamura

24 Old iseg 5 8/6/2003 N. Kitamura

25 New Iseg 1 8/6/2003 N. Kitamura

26 New Iseg 2 8/6/2003 N. Kitamura

27 New Iseg 3 8/6/2003 N. Kitamura

28 New Iseg 4 8/6/2003 N. Kitamura

29 New Iseg 5 8/6/2003 N. Kitamura