Telescope Control System Paul J. Lotz. Scope 2 TCS components 3.

Slides:



Advertisements
Similar presentations
INTERVAL Next Previous 13/02/ Timed extensions to SDL Analysis requirements –Assumptions on moments and duration Semantics with controllable time.
Advertisements

Simulation of Feedback Scheduling Dan Henriksson, Anton Cervin and Karl-Erik Årzén Department of Automatic Control.
CESG, Fall 2011, 5 th November 2011 Stuart Fowell, SciSys Device Virtualisation and Electronic Data Sheets.
TCS3 Conceptual Design Review 1 Aug 21, 2003 TCS3 Project Replacement of the Telescope Control System for the IRTF Conceptual Design Review Aug 2003.
SV100 Open-Loop Vector VFD FV100 Closed-Loop Vector VFD 1.
Implementation I - demo. Schedule * Project status -achieving the goals of the iteration -project metrics * Used work practices * Work results -presenting.
An Automata-based Approach to Testing Properties in Event Traces H. Hallal, S. Boroday, A. Ulrich, A. Petrenko Sophia Antipolis, France, May 2003.
ICS Management Poor management is the downfall of many software projects Software project management is different from other engineering management.
System-wide issues Before we get to the telescope System integration and verification at the telescope Operations Maintenance and support.
NeSSI AND ANALYZERS NeSSI AND ANALYZERS ISSUES AND DISCUSSION REGARDING THE SAM CONCEPT FROM THE ANALYZER SUPPLIERS PERSPECTIVE.
GLAST LAT ProjectISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.1 Requirements 1 Gamma-ray Large Area Space Telescope GLAST Large.
WBS & AO Controls Jason Chin, Don Gavel, Erik Johansson, Mark Reinig Design Meeting (Team meeting #10) Sept 17 th, 2007.
Scheduling with Optimized Communication for Time-Triggered Embedded Systems Slide 1 Scheduling with Optimized Communication for Time-Triggered Embedded.
MINER A NuMI MINER A DAQ Review 12 September 2005 D. Casper UC Irvine WBS 7.2 & 7.3: Data Acquisition D. Casper (UC Irvine)
GLAST LAT Project ISOC Peer Review - March 2, 2004 Section Gamma-ray Large Area Space Telescope GLAST Large Area Telescope ISOC Peer Review 7.2.
Systems Development (SD) Presentation Michael Webb IT Director for Medicaid Utah Department of Health UDOH Informatics Brownbag August.
0 - 1 © 2007 Texas Instruments Inc, Content developed in partnership with Tel-Aviv University From MATLAB ® and Simulink ® to Real Time with TI DSPs Amplitude.
Introduction to Software Testing
Annarita Giani, UC Berkeley Bruno Sinopoli & Aakash Shah, Carnegie Mellon University Gabor Karsai & Jon Wiley, Vanderbilt University TRUST 2008 Autumn.
Welcome to CMPE003 Personal Computer Concepts: Hardware and Software Winter 2003 UC Santa Cruz Instructor: Guy Cox.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 15 Slide 1 Real-time Systems 1.
Systems Analysis and Design: The Big Picture
Ross Brennan On the Introduction of Reconfigurable Hardware into Computer Architecture Education Ross Brennan
A Lessons Learned Discussion of Digital Control Upgrades How to Make Sure Your Digital Upgrade is Over- Budget, Over - Schedule, and Everyone’s Vacation.
Control Software Integration German Schumacher T&S Software Lead.
REAL-TIME SOFTWARE SYSTEMS DEVELOPMENT Instructor: Dr. Hany H. Ammar Dept. of Computer Science and Electrical Engineering, WVU.
Best Practices By Gabriel Rodriguez
LSST Scheduler status Francisco Delgado Sr. Software Engineer Telescope & Site.
Sandrine Thomas (T&S Project Scientist) & Telescope and Site Team.
LSST Scheduler requirements
Firewalls for regression testing Spring Use of the word “Firewalls” The way the authors White, Jaber, Robinson and Rajlich use the term “Firewall”
16 1 Installation  After development and testing, system must be put into operation  Important planning considerations Costs of operating both systems.
Advanced VIRGO WG1: Status VIRGO, Cascina Andreas Freise University of Birmingham.
High Speed Digital Systems Lab Asic Test Platform Supervisor: Michael Yampolsky Assaf Mantzur Gal Rotbard Project Midterm Presentation One-Semester Project.
Project Life Cycle.
Rich MoeserEVLA System PDR December 4-5, EVLA System PDR Operations Requirements.
BSBPMG505A Manage Project Quality 8.1 Plan Quality Adapted from PMBOK 4 th Edition InitiationPlanning ExecutionClose Monitor Control The process of identifying.
REAL-TIME SOFTWARE SYSTEMS DEVELOPMENT Instructor: Dr. Hany H. Ammar Dept. of Computer Science and Electrical Engineering, WVU.
The Active Optics System S. Thomas and the AO team.
W.M. Keck Observatory 26-April The next generation of EPICS at the W.M. Keck Observatory Presented by Jimmy Johnson, Kevin Tsubota.
Capturing the requirements  Requirement: a feature of the system or a description of something the system is capable of doing in order to fulfill the.
Validation Copyright © 2004 Yokogawa Validation. Copyright © 2004 Yokogawa Page 2 Validation ProjectStandard Project > Validation.
Project Goals Our task was to take the proof of concept and make a production ready prototype with the following parameters Use low cost microprocessor.
M1M3 Cell and Support System. M1M3 on Telescope 2 Location of the M1M3 Cell and Mirror on the Telescope.
BSBPMG503A Manage Project Time Manage Project Time Unit Guide Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG503A.
Network design Topic 6 Testing and documentation.
Reduce Development and Testing Time on Embedded Space Programs With Auto- Generated Code Software Engineer Northrop Grumman Electronic Systems Matthew.
Firewall for regression testing Tor Stålhane According to White, Jaber, Robinson and Rajlich.
FLAO_08 FLAO System Shipping Plan Document 646f010a Richard Demers, Guido Brusa, Armando Riccardi, Daniele Galieni FLAO system external review, Florence,
New Advanced Higher Subject Implementation Events Qualifications Update: Computing Science.
LIGO-G9900XX-00-M LIGO II1 Why are we here and what are we trying to accomplish? The existing system of cross connects based on terminal blocks and discrete.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR447 Command, Telemetry, and Ground Support Equipment (CTG)
SE513 Software Quality Assurance Lecture10: Documentation and Quality Records Control Galin, SQA from Theory to Education Limited.
Embedded Systems Development Laboratory Jeff Houser (301) (301)
ARISSat-1 Critical Design Review Orlando, Feb 15, 2010 IHU Joseph Julicher
Development Project Management Jim Kowalkowski. Outline Planning and managing software development – Definitions – Organizing schedule and work (overall.
IT-301 Project Management I: Unit 4: Cost Management.
Control Systems Design Slovak University of Technology Faculty of Material Science and Technology in Trnava 2007.
Software Engineering, COMP201 Slide 1 Software Engineering CSE470.
SKA Interface Workshop: Dishes External Interfaces Thomas Kusel & Mark Bowen For Dishes consortium Manchester June 2013.
1 OBSERVATORY CONTROL SYSTEM (OCS) FRANCISCO DELGADO OCS CAM.
ComCam Hardware and Interfaces James Howard ComCam CAM LSST 2017 Project & Community Workshop 2017 Aug 15.
Simulink Interface Layer (SIL)
ComCam Hardware and Interfaces James Howard ComCam CAM LSST 2017 Project & Community Workshop 2017 Aug 15.
LSST Commissioning: FY18 Planning
DarkSide-50 Distributed Control System Towards DarkSide-20k
Introduction to Software Testing
LSST Control Software Integration Francisco Delgado OCS Software Manager LSST Commissioning Plan Review January 24-26, 2017.
Vendor Interactions Paul J. Lotz.
Signal Conditioning.
Presentation transcript:

Telescope Control System Paul J. Lotz

Scope 2

TCS components 3

Auxiliary Telescope, External Environment Monitor components 4

ILC and mirror supports Complete – ILCLabVIEW (ILC = “Inner Loop Controller”) Generally exercise ILC communication, I/O – M2AADT (M2 Axial Actuator Durability Tester) – AITDT (Analog Input Thermal Drift Tester) In progress – FAMT (Force Actuator Model Tester) Future – Implement production protocol (customized Modbus) – Calibration Of standard signal generator Of ILCs – Initialization of encoders 5

Work with vendors See previous presentation on this topic. 6

Additional efforts Hardware – Selected cRIOs (9038—8-slot; 9033—4-slot) Auxiliary telescope TCS – Scheduler for it? AOCS – AOS requirements document in progress (see Sandrine Thomas presentation) Auxiliary – Work by Patrick Ingraham on ICDs (will be LSE-139) 7

Near term plan ILC work—Fall 2015 Component ICDs-- SAL-LabVIEW interface—End of 2015 – Already Generate types from SAL definitions Proof of concept for generating messaging methods Higher fidelity TCS simulator—June 2016 – Basic TCS kernel simulator now in SAL SDK Hire software engineer—Fall

Discussion 9

Back-up slides 10

Plan Highest Level 11

Plan Level 2 A 12

Plan Level 2 B 13

Plan Level 2 C 14

Updating plan… 15

16

17