1 Operations Summary L. Coney – UCR MICE CM34 – Oct 2012.

Slides:



Advertisements
Similar presentations
MAUS Update Adam Dobbs, MICE Project Board, 16 th April 2015.
Advertisements

Grid and CDB Janusz Martyniak, Imperial College London MICE CM37 Analysis, Software and Reconstruction.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Wrap Up o Control and Monitoring o DDAQ o Interface between DDAQ and MCM o Infrastructure Jean-Sebastien.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 21 September, 2009.
Data Quality Assurance Linda R. Coney UCR CM26 Mar 25, 2010.
Online Reconstruction Update Linda R. Coney UCR Mar 25, 2010.
Status of Electronics & Control System P J Smith University of Sheffield 16/12/2009.
Computing Panel Discussion Continued Marco Apollonio, Linda Coney, Mike Courthold, Malcolm Ellis, Jean-Sebastien Graulich, Pierrick Hanlet, Henry Nebrensky.
Online Reconstruction Update Linda R. Coney UCR Dec 17, 2009.
MICO Meeting, 1 st March 2010 Terry Hart (MOM) - Decay Solenoid - Targets - DAQ - March User Runs Plans - Suggestions.
Linda R. Coney – 24th April 2009 Online Reconstruction & a little about Online Monitoring Linda R. Coney 18 August, 2009.
Pierrick Hanlet MICO June 6, 2011 MICE Operations Manager Report.
VC Sept 2005Jean-Sébastien Graulich Report on DAQ Workshop Jean-Sebastien Graulich, Univ. Genève o Introduction o Monitoring and Control o Detector DAQ.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICO Meeting June 7, 2010.
Implementation/Acceptance Testing / 1 Implementation and Acceptance Testing Physical Implementation Criteria: 1. Data availability 2. Data reliability.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICO Meeting May 24, 2010.
MICE Online Linda R. Coney UCR MICE CM30 Oxford July 2011.
1 Project Management Web Tools at the MICE Experiment Linda R. Coney – UC Riverside CHEP – May 2012.
CM26 March 2010Jean-Sebastien GraulichSlide 1 Online Summary o The heplnw17 case o DAQ o CAM o Online Reconstruction o Data Base o Data Storage Jean-Sebastien.
SOFTWARE & COMPUTING Durga Rajaram MICE PROJECT BOARD Nov 24, 2014.
MICE CM February 08Jean-Sébastien GraulichSlide 1 Detector DAQ Hardware Status o Introduction o Preliminary list o Plan for action o Summary Jean-Sebastien.
Designing a HEP Experiment Control System, Lessons to be Learned From 10 Years Evolution and Operation of the DELPHI Experiment. André Augustinus 8 February.
Control and Monitoring System / EPICS Pete Owens Daresbury Laboratory.
MICE VC June 2009Jean-Sébastien GraulichSlide 1 Feed back from the DAQ review o Facts o Detector DAQ o Important Comments o Bottom line Jean-Sebastien.
Requirements Review – July 21, Requirements for CMS Patricia McBride July 21, 2005.
Project manager report paul drumm CM16 October 2006.
1 Review of Recent Run L. Coney – UCR MICE CM34 – Oct 2012.
1 Online Summary and MICE Operations Linda R. Coney – UCR CM35 – 16 Feb 2013.
1 Operations Overview L. Coney UC Riverside MICE CM32 – Glasgow – June 2012.
1 MICE Running L. Coney – UCR MPB – 31 Oct Coney - MPB - 31 Oct 2012Outline Current Running Current Running Shift personnel training Shift personnel.
Linda Coney MC VC May 19, 2011 MICE Operations Manager Report.
Control & Monitoring System Update Contributors: Brian Martlew - Daresbury Laboratory - STFC James Leaver - Imperial College Pierrick Hanlet - Fermilab.
Electrical Integration CM38 Steve Griffiths & Ian Mullacrane.
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM24 o Trigger o Event Building o Online Software o Front End.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
Configuration Database Antony Wilson MICE CM February 2011 RAL 1.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Control and Monitoring Summary of DAQ WS III o General Architecture o RF System C&M o D0 EPICS extensions.
Click to add Text L. CONEY1 MICE Shifter Training June 2015.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
Linda R. Coney – 24th September 2009 MOM Update Linda R. Coney 24 September, 2009.
Online Reconstruction 1M.Ellis - CM th October 2008.
Firmware - 1 CMS Upgrade Workshop October SLHC CMS Firmware SLHC CMS Firmware Organization, Validation, and Commissioning M. Schulte, University.
Controls & Monitoring Overview J. Leaver 03/06/2009.
Linda R. Coney – 5 November 2009 Online Reconstruction Linda R. Coney 5 November 2009.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
MICE CM28 Oct 2010Jean-Sebastien GraulichSlide 1 Detector DAQ o Achievements Since CM27 o DAQ Upgrade o CAM/DAQ integration o Online Software o Trigger.
Pixel DQM Status R.Casagrande, P.Merkel, J.Zablocki (Purdue University) D.Duggan, D.Hidas, K.Rose (Rutgers University) L.Wehrli (ETH Zuerich) A.York (University.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
MICE VC Alain Blondel 1 1. MOM is now Victoria 2. Linda Coney is new MICE Online Group coordinator (rep Jean-Sebastien) May we held.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
11 th February 2008Brian Martlew EPICS for MICE Status of the MICE slow control system Brian Martlew STFC, Daresbury Laboratory.
SPOKESMAN’S UPDATE K. Long Imperial College London/STFC.
Tracker Cosmic Ray Test 2011 Linda R. Coney UC Riverside CM 29 - February 16, 2011.
Status of the MICE Construction Project Resource Loaded Schedule Review 29 th April 2014 Roy Preece.
MICE CM30 Goals of the Meeting Alain Blondel 1 MICE CM30 – Goals and Status.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICE Video Conference May 20, 2010.
MICE CM23 Introduction and Meeting Goals Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
MICE Online Group Linda R. Coney UCR MICE CM31 UMiss October 2011.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be at Cosener’s14-16 February meeting at Coseners House.
Coney - CM36 - June Online Overview L. Coney – UCR MICE CM36 – June 2013.
What do we want to achieve in this running period? Michael S. Zisman Deputy Spokesmouse Center for Beam Physics Lawrence Berkeley National Laboratory MICO.
MAUS Status A. Dobbs CM43 29 th October Contents MAUS Overview Infrastructure Geometry and CDB Detector Updates CKOV EMR KL TOF Tracker Global Tracking.
Linda Coney MICO June 6, 2011 MICE Online Report.
Project Managers Report CM38 – Napa Roy Preece 24th February 2014.
Online & Operations Summary Linda R. Coney UCR MICE CM32 – RAL Feb 2012.
L. Coney UC Riverside MICE CM32 – Glasgow – June 2012
MICE Computing and Software
Project Manager’s Report + DC/MoM Report
Controls & Monitoring in MICE
Presentation transcript:

1 Operations Summary L. Coney – UCR MICE CM34 – Oct 2012

2Coney - CM34 - Oct 2012 Online Updates – New DAQ

3Coney - CM34 - Oct 2012DAQ DAQ DAQ New DAQ in place New DAQ in place Implemented new acquisition library independent of DATE and EPICS – leads to flexibility and is easy to use Implemented new acquisition library independent of DATE and EPICS – leads to flexibility and is easy to use Written simple applications for use in the control room Written simple applications for use in the control room Have thin C++ wrapper of EPICS – flexible/easy – also independent of DATE and DAQ hardware Have thin C++ wrapper of EPICS – flexible/easy – also independent of DATE and DAQ hardware Communication with CDB done by Controls & Monitoring (Run Control) Communication with CDB done by Controls & Monitoring (Run Control) At end – interface with DATE At end – interface with DATE New zero suppression of fADCs New zero suppression of fADCs Very high DAQ rate now possible Very high DAQ rate now possible New pulser trigger available New pulser trigger available

4Coney - CM34 - Oct 2012DAQ DAQ can now handle rates above the initial 600 muons/spill goal DAQ can now handle rates above the initial 600 muons/spill goal New software/hardware system in place, debugged, tested, and functional New software/hardware system in place, debugged, tested, and functional All that remains on Yordan’s Christmas list for the “PID” DAQ is the programmable FPGA logic for the particle trigger All that remains on Yordan’s Christmas list for the “PID” DAQ is the programmable FPGA logic for the particle trigger And the EMR and Trackers… And the EMR and Trackers…

5Coney - CM34 - Oct 2012 Online Systems Updates – C&M Been very busy since Glasgow Been very busy since Glasgow Target Target Daresbury C&M Daresbury C&M Spectrometer Solenoid Spectrometer Solenoid LH2 Monitoring LH2 Monitoring Run Control Run Control RF Tuners RF Tuners Auto-SMS notification Auto-SMS notification More system monitoring More system monitoring State Machines State Machines

6Coney - CM34 - Oct 2012 C&M - Target Rewritten Target C&M system Rewritten Target C&M system Better EPICS compliance Better EPICS compliance Web interface Web interface CDB compatible CDB compatible Online analysis Online analysis Run priority Run priority Root file output Root file output Making similar changes to Tracker system Making similar changes to Tracker system

7Coney - CM34 - Oct 2012C&M DL DL SS standalone system being used SS standalone system being used Being improved for final SS training Being improved for final SS training FC standalone ready FC standalone ready

8Coney - CM34 - Oct 2012C&M LH2 LH2 Monitoring Monitoring Archiving Archiving Control expert only Control expert only RF Tuners RF Tuners Resonant frequency depend on geometry Resonant frequency depend on geometry Change cavity shape Change cavity shape Controls system Controls system

9Coney - CM34 - Oct 2012 C&M – Run Control Interfaces with: DATE TargetMon State Machine Environment Standard operation Records all running parameters to CDB Records all meta-data at end of run Verifies readiness of subsystems Sets running parameters Tags run parameters

10Coney - CM34 - Oct 2012 Elog Changes Modifications to improve ease of use and understandability – see Henry for input to new system Modifications to improve ease of use and understandability – see Henry for input to new system

11Coney - CM34 - Oct 2012 Step IV: Operations & Online Moving toward Step IV running Moving toward Step IV running Many configurations to test/run Many configurations to test/run Long term running/every opportunity taken Long term running/every opportunity taken All ISIS cycles – every day – Differs from past Operations All ISIS cycles – every day – Differs from past Operations Develop idea of not-so-remote control room Develop idea of not-so-remote control room Develop plan for staffing & commissioning of cooling channel Develop plan for staffing & commissioning of cooling channel Develop robust system of Operations Develop robust system of Operations Includes all facets of Online Group (DAQ, C&M, Online Reconstruction/Analysis, Infrastructure) Includes all facets of Online Group (DAQ, C&M, Online Reconstruction/Analysis, Infrastructure) Goals – next phase of Operations Goals – next phase of Operations Functional Functional Safe/Secure Safe/Secure Reliable Reliable Easy to use Easy to use

12Coney - CM34 - Oct 2012 Step IV: Operations & Online Functional Functional DAQ – incorporate all detectors – improve rate DAQ – incorporate all detectors – improve rate DAQ upgrades DAQ upgrades All C&M for each element All C&M for each element Alarm Handler values set appropriately Alarm Handler values set appropriately Add capability to Online Reco/Analysis Add capability to Online Reco/Analysis Automate run infrastructure – Run Control Automate run infrastructure – Run Control Automatic use – read/write to Configuration Database Automatic use – read/write to Configuration Database Safe/Secure Safe/Secure Incorporated fully commissioned PPS Incorporated fully commissioned PPS Implemented formal shifter training Implemented formal shifter training Updated Operations/Online documentation & instructions Updated Operations/Online documentation & instructions Developing comprehensive list of safety-critical maintenance Developing comprehensive list of safety-critical maintenance Updating safety paperwork – developing overall system for MICE Updating safety paperwork – developing overall system for MICE Using new target controller with all necessary interlocks & BPS Using new target controller with all necessary interlocks & BPS Online system security reviewed – improvements made Online system security reviewed – improvements made Access limited to micenet Access limited to micenet

13Coney - CM34 - Oct 2012 Step IV: Operations & Online Easy to use Easy to use Simplified Ops procedures – single key exchange ISIS Simplified Ops procedures – single key exchange ISIS MICE control access to Hall MICE control access to Hall Improving Online Reconstruction/Data Quality plots Improving Online Reconstruction/Data Quality plots Need add Online Reco for KL/EMR/Accel Analysis Need add Online Reco for KL/EMR/Accel Analysis Run Control Run Control Mature Alarm Handler Mature Alarm Handler Reliable Reliable New OS implemented – automatic updates New OS implemented – automatic updates Automatic/systematic backups in place Automatic/systematic backups in place New DAQ and C&M computers installed New DAQ and C&M computers installed UPS coverage for critical systems UPS coverage for critical systems Developing “stockroom” of spares – crates/computers/etc Developing “stockroom” of spares – crates/computers/etc Automatic write to EPICS Archiver Automatic write to EPICS Archiver Extensive remote monitoring of equipment/computers/hardware/environment in EPICS Extensive remote monitoring of equipment/computers/hardware/environment in EPICS Archive of all software – Launchpad repository Archive of all software – Launchpad repository

14Coney - CM34 - Oct 2012 Organization & Preparation Micemine Run Plan worked well – schedule & plan Micemine Run Plan worked well – schedule & plan s/wiki/RunPlan s/wiki/RunPlan s/wiki/RunPlan s/wiki/RunPlan

15Coney - CM34 - Oct 2012 Need New/More Shifters Recognized the need for training – now need to implement training Recognized the need for training – now need to implement training Difficult to do while running – difficult to properly train w/o running Difficult to do while running – difficult to properly train w/o running Need some training w/o beam but with equipment Need some training w/o beam but with equipment Develop training schedule Develop training schedule Corollary – develop training updates when new equipment arrive Corollary – develop training updates when new equipment arrive Need all MOMs able to lead/arrange training Need all MOMs able to lead/arrange training Sign up more MICE – THIS MEANS YOU! Sign up more MICE – THIS MEANS YOU! Cannot exploit tiny group of (primarily UK-based) dependable individuals Cannot exploit tiny group of (primarily UK-based) dependable individuals This becomes even more true for Step IV running This becomes even more true for Step IV running

16Coney - CM34 - Oct 2012 Goals of Running Test significant upgrades and changes to both the Online Systems and MAUS software packages – NOT to take data Test significant upgrades and changes to both the Online Systems and MAUS software packages – NOT to take data Overall Online Overall Online New OS installed on all MLCR computers New OS installed on all MLCR computers New master server, new account setups, new UPSs New master server, new account setups, new UPSs DAQ DAQ Final live data test of new DAQ system – upgraded DATE & OS Final live data test of new DAQ system – upgraded DATE & OS New interface with C&M New interface with C&M New DAQ hardware New DAQ hardware C&M C&M Full read/write from CDB Full read/write from CDB Overall system test of Step I Run Control Overall system test of Step I Run Control Expert testing/feedback on Run Control Expert testing/feedback on Run Control New HV user docs New HV user docs Software Software Online test server setup functional Online test server setup functional New control room branch of MAUS New control room branch of MAUS Improved TOF/CKOV online plots Improved TOF/CKOV online plots

17Coney - CM34 - Oct 2012 Goals of Running DAQ – Yordan’s talk DAQ – Yordan’s talk C&M – Pierrick’s talk C&M – Pierrick’s talk Software – Chris Rogers’ talk this morning Software – Chris Rogers’ talk this morning Mixed results – confirm that we DO need regular running Mixed results – confirm that we DO need regular running Partially successful Partially successful Unfortunately – not smooth run – while this was expected due to the many changes, many of the problems were not anticipated Unfortunately – not smooth run – while this was expected due to the many changes, many of the problems were not anticipated No real useful data until Sunday….although this was not the goal of the run No real useful data until Sunday….although this was not the goal of the run

18Coney - CM34 - Oct 2012 Way Forward.. We are making progress We are making progress Previously we were focused on getting the basics going – Implementation of necessary functionality Previously we were focused on getting the basics going – Implementation of necessary functionality Now – move focus to reliability Now – move focus to reliability Need to KEEP THINGS WORKING! Need to KEEP THINGS WORKING! Schedule regular 3-day weekend runs Schedule regular 3-day weekend runs MAUS – already using “release” system of changes MAUS – already using “release” system of changes C&M C&M need do same with the controls and monitoring code need do same with the controls and monitoring code Stabilize applications Stabilize applications Development computer/system separate from iocpc1/iocpc2 Development computer/system separate from iocpc1/iocpc2 Coordination between C&M developers must happen Coordination between C&M developers must happen DAQ – staged upgrades – especially with new equipment DAQ – staged upgrades – especially with new equipment

19Coney - CM34 - Oct 2012 MICE Step IV Includes both Spectrometer Solenoids Includes both Spectrometer Solenoids Two trackers installed within the SS magnets Two trackers installed within the SS magnets One AFC (Focus Coil magnet & Absorber) One AFC (Focus Coil magnet & Absorber)

20Coney - CM34 - Oct 2012 Step IV Ops – New Equipment… We will have much more in the Hall! We will have much more in the Hall!

21Coney - CM34 - Oct 2012 Step IV – Operations Continue: Continue: Pre-run prep Pre-run prep Further simplify running Further simplify running Improve: Improve: Automate procedures  fewer errors Automate procedures  fewer errors Move from spreadsheet  only ConfigDB Move from spreadsheet  only ConfigDB Increase Online Reconstruction capabilities Increase Online Reconstruction capabilities Complete suite of detectors, Online analysis, Global reco Complete suite of detectors, Online analysis, Global reco Reduce required number of shifters… Reduce required number of shifters… New equipment arriving – plan for commissioning, support & expertise New equipment arriving – plan for commissioning, support & expertise Modify procedures to include SC magnets and LH2 system Modify procedures to include SC magnets and LH2 system Train shift personnel Train shift personnel Develop plan to staff multitude of shifts Develop plan to staff multitude of shifts

22Coney - CM34 - Oct 2012 Step IV – Operations Safety Safety Need understand implications under STFC rules of new equipment Need understand implications under STFC rules of new equipment Made arrangements to meet with Jane Vickers (ISIS safety) to begin preparation/planning Made arrangements to meet with Jane Vickers (ISIS safety) to begin preparation/planning Need understand from experts what each system entails/requires for operation Need understand from experts what each system entails/requires for operation PPS PPS Need understand implementation of system with SC magnets and LH2 system Need understand implementation of system with SC magnets and LH2 system Hall Access Hall Access Limited – not every day – scheduled access only Limited – not every day – scheduled access only Increase efficiency of data-taking Increase efficiency of data-taking Hall search dropped twice in 3 days last weekend. Not acceptable. Hall search dropped twice in 3 days last weekend. Not acceptable. Experts must be available Experts must be available

23Coney - CM34 - Oct 2012 Operations Organization Overall Operations Manager Overall Operations Manager Local, familiar with STFC safety and operational systems Local, familiar with STFC safety and operational systems Provide oversight, link between MOMS, safety responsibility from project manager Provide oversight, link between MOMS, safety responsibility from project manager Monthly MOMs Monthly MOMs On call for 1 month – Daily running duties as now On call for 1 month – Daily running duties as now MICE Shift personnel MICE Shift personnel Currently 2 shifters for ~8 hour shift Currently 2 shifters for ~8 hour shift Prefer to move to 1 MICE shifter Prefer to move to 1 MICE shifter Current on-call experts – BLOC, SOC, TROC Current on-call experts – BLOC, SOC, TROC New system-specific experts – 3 per system – not necessarily current MICE New system-specific experts – 3 per system – not necessarily current MICE Magnet & cryo experts – maintenance of magnet systems, manage cryogens and vac pumping rigs & instrumentation, cooling and powering expert, quench behavior expert Magnet & cryo experts – maintenance of magnet systems, manage cryogens and vac pumping rigs & instrumentation, cooling and powering expert, quench behavior expert LH2 expert – control engineering knowledge, safety procedures LH2 expert – control engineering knowledge, safety procedures

24Coney - CM34 - Oct 2012 Step IV Operations Given current MICE schedule for Step IV equipment and installation… Given current MICE schedule for Step IV equipment and installation… We must be prepared for 24/7 running in order to get Step IV data before ISIS shutdown in August 2014 We must be prepared for 24/7 running in order to get Step IV data before ISIS shutdown in August 2014 Can our systems handle this? Can our systems handle this? Target ok? Magnets ok? Target ok? Magnets ok? DAQ ok? Controls ok? Datamover ok? DAQ ok? Controls ok? Datamover ok? Shift coverage ok? Shift coverage ok? Another reason to limit Hall access. Another reason to limit Hall access.