Online Update Elliott Wolin JLab 4-Oct-2013. Outline Online Data Challenges Networking DAQ JInventory System Farm Manager Counting House, Computers, Databases.

Slides:



Advertisements
Similar presentations
Chapter 3: Planning a Network Upgrade
Advertisements

GCT Software Jim Brooke GCT ESR, 7 th November 2006.
Final Commissioning Plan and Schedule Cheng-Ju Lin Fermilab Installation Readiness Review 09/27/2004 Outline: - Work to be done during shutdown - Work.
GENI Experiment Control Using Gush Jeannie Albrecht and Amin Vahdat Williams College and UC San Diego.
André Augustinus ALICE Detector Control System  ALICE DCS is responsible for safe, stable and efficient operation of the experiment  Central monitoring.
23/04/2008VLVnT08, Toulon, FR, April 2008, M. Stavrianakou, NESTOR-NOA 1 First thoughts for KM3Net on-shore data storage and distribution Facilities VLV.
Figure 1.1 Interaction between applications and the operating system.
Pierrick Hanlet MICO June 6, 2011 MICE Operations Manager Report.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
Trigger and online software Simon George & Reiner Hauser T/DAQ Phase 1 IDR.
Data Acquisition Graham Heyes May 20th Outline Online organization - who is responsible for what. Resources - staffing, support group budget and.
Duties of a system administrator. A system administrator's responsibilities typically include:
CERN IT Department CH-1211 Genève 23 Switzerland t Some Hints for “Best Practice” Regarding VO Boxes Running Critical Services and Real Use-cases.
Online Update Elliott Wolin GlueX Collaboration Meeting 3-Jun-2013.
Current Job Components Information Technology Department Network Systems Administration Telecommunications Database Design and Administration.
DAQ Status & Plans GlueX Collaboration Meeting – Feb 21-23, 2013 Jefferson Lab Bryan Moffit/David Abbott.
Online Data Challenges David Lawrence, JLab Feb. 20, /20/14Online Data Challenges.
SBS/A1n DAQ status Alexandre Camsonne August 28 th 2012.
Outline IT Organization SciComp Update CNI Update
Operated by Los Alamos National Security, LLC for NNSA U N C L A S S I F I E D LDAQ – the New Lujan Center Data Acquisition Application Frans Trouw, Gary.
1 Alice DAQ Configuration DB
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
CODA Users Workshop (Data Acquisition at Jefferson Lab) By David Abbott.
MiniBooNE Computing Description: Support MiniBooNE online and offline computing by coordinating the use of, and occasionally managing, CD resources. Participants:
Status and plans for online installation LHCb Installation Review April, 12 th 2005 Niko Neufeld for the LHCb Online team.
Configuration Database MICE Collaboration Meeting 28, Sofia David Forrest University of Glasgow Antony Wilson Science and Technology Facilities Council.
DAQ MICO Report Online Monitoring: –Status All histograms are now implemented Still not fully online –Only monitoring from data file (slightly offline,
ATCA based LLRF system design review DESY Control servers for ATCA based LLRF system Piotr Pucyk - DESY, Warsaw University of Technology Jaroslaw.
Elliott Wolin Hall D Online Meeting 4-Mar  A few weeks ago Elke asked how long it would take to get an EPICS system going  I didn’t know  I had.
DAQ Issues for the 12 GeV Upgrade CODA 3. A Modest Proposal…  Replace aging technologies  Run Control  Tcl-Based DAQ components  mSQL  Hall D Requirements.
Data Acquisition for the 12 GeV Upgrade CODA 3. The good news…  There is a group dedicated to development and support of data acquisition at Jefferson.
DAQ & ECS for TPC commissioning A few statements about what has been done and what is still in front of us F.Carena.
Hall D Online Meeting 28 March 2008 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Experimental Nuclear Physics Division System Engineering.
JANA and Raw Data David Lawrence, JLab Oct. 5, 2012.
A.Golunov, “Remote operational center for CMS in JINR ”, XXIII International Symposium on Nuclear Electronics and Computing, BULGARIA, VARNA, September,
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
V.Sirotenko, July Status of Online Databases Currently there are 2 online Oracle Databases running on d0online cluster: 1.Production DB, d0onprd,
Management of the LHCb DAQ Network Guoming Liu * †, Niko Neufeld * * CERN, Switzerland † University of Ferrara, Italy.
R. Fantechi. TDAQ commissioning Status report on Infrastructure at the experiment PC farm Run control Network …
Introduction CMS database workshop 23 rd to 25 th of February 2004 Frank Glege.
Databases in CMS Conditions DB workshop 8 th /9 th December 2003 Frank Glege.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
David Abbott - Jefferson Lab DAQ group Data Acquisition Development at JLAB.
Clara Gaspar, July 2005 RTTC Control System Status and Plans.
Installation status Control Room PC farm room DetectorsEB Infrastructure 918 ECN3.
DØ Online Workshop3-June-1999S. Fuess Online Computing Overview DØ Online Workshop 3-June-1999 Stu Fuess.
MICE CM28 Oct 2010Jean-Sebastien GraulichSlide 1 Detector DAQ o Achievements Since CM27 o DAQ Upgrade o CAM/DAQ integration o Online Software o Trigger.
Nov 1, 2002D0 DB Taking Stock1 Trigger Database Status and Plans Elizabeth Gallas – FNAL CD (with recent help from Jeremy Simmons, John Weigand, and Adam.
Monitoring Update David Lawrence, JLab Feb. 20, /20/14Online Monitoring Update -- David Lawrence1.
DAQ Status & Plans GlueX Collaboration Meeting – Feb 21-23, 2013 Jefferson Lab Bryan Moffit/David Abbott.
November 1, 2004 ElizabethGallas -- D0 Luminosity Db 1 D0 Luminosity Database: Checklist for Production Elizabeth Gallas Fermilab Computing Division /
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Work almost finished in Orsay Small crisis 20 days ago due to late delivery of.
Management of the LHCb DAQ Network Guoming Liu *†, Niko Neufeld * * CERN, Switzerland † University of Ferrara, Italy.
R. Krempaska, October, 2013 Wir schaffen Wissen – heute für morgen Controls Security at PSI Current Status R. Krempaska, A. Bertrand, C. Higgs, R. Kapeller,
Event Management. EMU Graham Heyes April Overview Background Requirements Solution Status.
Markus Frank (CERN) & Albert Puig (UB).  An opportunity (Motivation)  Adopted approach  Implementation specifics  Status  Conclusions 2.
GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop.
Active-HDL Server Farm Course 11. All materials updated on: September 30, 2004 Outline 1.Introduction 2.Advantages 3.Requirements 4.Installation 5.Architecture.
R. Fantechi 2/09/2014. Milestone table (7/2014) Week 23/6: L0TP/Torino test at least 2 primitive sources, writing to LTU, choke/error test Week.
ATCA based LLRF system design review DESY Control servers for ATCA based LLRF system Piotr Pucyk - DESY, Warsaw University of Technology Jaroslaw.
L1Calo DBs: Status and Plans ● Overview of L1Calo databases ● Present status ● Plans Murrough Landon 20 November 2006.
Gu Minhao, DAQ group Experimental Center of IHEP February 2011
BaBar Transition: Computing/Monitoring
CLAS12 DAQ & Trigger Status
Run Control (and Other) Work
Current Status of ITER I&C System as Integration Begins
Online Software Status
ProtoDUNE SP DAQ assumptions, interfaces & constraints
The only thing worse than an experiment you can’t control is an experiment you can. May 6, 2019 V. Gyurjyan CHEP2007.
Presentation transcript:

Online Update Elliott Wolin JLab 4-Oct-2013

Outline Online Data Challenges Networking DAQ JInventory System Farm Manager Counting House, Computers, Databases System Software Computer System Monitoring Controls ELog UPS Power Summary

Maroon Bells

Networking Trigger fiber installation separate contract (Chris C) Installing final networking – Tagger almost done – Mark and I optimizing fiber/switch distribution in the hall – No sooner than many weeks from now Interim networking installed – Low bandwidth – Run copper cables to interim switch as needed – Adequate for near-term needs

North Wall

FCAL Switch

DAQ (from Dave A) DAQ test stand down to 8 crates incl. TS, no GTP/SSP crate Summer testing led to important improvements in robustness, error handling and debug-ability – Many firmware and driver updates Many improvements in auxiliary programs – Gui’s, editors, diagnostic programs, etc. CODA3 version ready for release – Supports multiple users – Implemented new byte-swapping policy 17 Gen 3 Core I7 ROCS just arrived – Need to order ~40 more, week lead time – Ready to order if money available

DAQ, con’t To do: – More high-speed testing w/two-stage event building – More integration with Global Trigger Crate and driver development – Continue debugging – Eventually move operations out of Counting House into Hall

JInventory System Serguei Pozdniakov (contract) working diligently on this – Moving on to other stuff soon Database fully implemented, ready for production use – ~1000 items entered – backed-up regularly by Computer Center Item custodians get if location or condition changes Still to do: – Complete entering electronics and control items – Complete barcode labeling – Implement power hierarchy information – Add electronics maintenance component For Fernando et al. – Add more consistency checking – Implement handheld scanner API

Farm Manager CODA component that manages farm processes – Farm Manager listed in run control (COOL) configuration file – Farm processes are not CODA components – Farm processes do not respond to run control commands – E.g. a farm process can die but DAQ continues Vardan (DAQ group) writing Farm Manager Farm process tested in recent data challenge – hd_online (Dave L) – Communication layer and state machine (me)

Hall-D Farm Control System HCA1 PCA1 FCS JP1 SCSECS Control Node Processing Node 1Processing Node n IPMI PCAn JPn HCAn IPMI RCS PCA StatesState Machine Actions connectedstart disconnectedstop configuredconfigure activego endedend pausedpause warninggetState errorgetStatus RCS - Run Control System supervisor ECS - Experiment Control System supervisor SCS - Slow Control System supervisor FCS - Farm Control System supervisor HCAn - Hardware Control Agent PCAn - Process Control Agent IPMI - Hardware control protocol JPn - Jana Process

Counting House, Computers, Databases Counting House done except few punch-list items Computers ordered, should arrive any day now – Combined order with HPCC Paul Letta (system manager) will install everything – Maybe by the end of the month Working out MySQL database backup strategy – Will back up from replicated database – May depend on level and type of offline access needed

Counting Room

System Software Will install locally in /gapps (not in /apps) – Should not rely on /apps, /site or /group Moved to GCC – C++11 “language complete” – Missing some libs (esp. regex)

Computer System Monitoring Will use Ganglia for the forseeable future – Used during data challenge – Used by Computer Center AFECS controls framework (from DAQ group) includes hardware monitoring component

Controls Dave Butler beginning installation of controls equipment Everything we know about is here or on order Rack space becoming an issue – Detector groups need more space than planned – Fernando is the rack-space czar! Solenoid control system being upgraded – Based on experience during Solenoid test

FCAL Darkroom Controls Allen-Bradley CompactLogix PLC IU Stuff

ELog Used Accelerator ELog for Solenoid test Worked ok, many improvements needed – Requirements document developed by four halls – Accelerator thinks it’s mostly done… Underlying database on ACC managed computers New ELog from EPICS community?

UPS Power Plan to run filtered power from big UPS to hall – Then run branch circuits where needed Giles will do the planning – After regular power installed in hall

Summary Summer online data challenge very useful – Next one late Fall will include almost all DAQ/L3/monitoring components Final networking being installed – Interim system can accommodate all low-bandwidth needs Summer DAQ testing by DAQ group very useful – Led to many CODA improvements JInventory ready to use – Almost all DAQ and controls equipment entered and barcode labeled Farm manager being developed Counting House and computers almost ready – Software installation, backup strategies, compilers, accounts, etc. Accelerator ELog needs work UPS power coming to the hall eventually