The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.

Slides:



Advertisements
Similar presentations
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Aug 6, 2012.
Advertisements

MOM Summary 19/01/10 Water Now the ice has cleared I am able to get on the roof again. Could do with getting the conductivity readings fed back similarly.
Luminosity Monitor MWPCs, commissioning. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 11 th May 2009.
MINER A NuMI MINER A DAQ Review 12 September 2005 D. Casper UC Irvine WBS7: Electronics and Data Acquisition  Overview (this talk): D. Casper  Front-end.
MINER A NuMI MINER A DAQ Review 12 September 2005 D. Casper UC Irvine WBS 7.2 & 7.3: Data Acquisition D. Casper (UC Irvine)
MICO 8 th February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - Problems and Issues.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jun 20, 2011.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Nov
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jun 4, 2012.
1 TPC online  offline calibration November 2002.
Hall A 12 GeV DVCS Status report December 16th 2013 Hall A collaboration meeting Alexandre Camsonne.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester April 1, 2013.
Oct C. Smith - PCAL/EC Commissioning 1 PCAL/EC Commissioning Document
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Aug 5, 2013.
DAQ MICO Report Online Monitoring: –Status All histograms are now implemented Still not fully online –Only monitoring from data file (slightly offline,
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 17, 2013.
Faculty of Physics, University of Belgrade General meeting 19 th of August, ToF-LR HV Upgrade Jovan Puzović, Faculty of Physics, Belgrade.
The Design and Performance of the MINER A Detector Howard Budd, University of Rochester Technology and Instrumentation in Particle Physics 2011.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Sep 26, 2011.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Mar
17 February All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 February Dedicated some.
Test beam setup: status report 31/03/2009 M. Alfonsi (CERN)
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Oct 17, 2011.
1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 24, 2013.
MINER A Operations Report All Experimenters’ Meeting Steve Hahn, FNAL July 1, 2013.
Progress on the beam tracking instrumentation Position measurement device Tests performed and their resolution Decision on electronics Summary.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
MINERvA Status Report Deborah Harris, Gabe Perdue, Kevin McFarland, Jorge Morfin October 15, 2009.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
CLAS12 Drift Chamber Prototyping
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
Steven Worm – RutgersMar 25, CMS Testbeam at Fermilab: Status and Plans o Testbeam Setup Status –Big pieces are now in place: telescope, Si, ROC,
FLASH Collaboration Meeting: July 2003 Spectrograph Status Etc.
HAPPEX DAQ / ADC Tests Luis Mercado UMASS 4/17/09.
DAQ Status & Plans GlueX Collaboration Meeting – Feb 21-23, 2013 Jefferson Lab Bryan Moffit/David Abbott.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
HBD HV Control and Monitoring System RUN-9 UPDATE Manuel Proissl HBD Meeting 04/08/2009.
MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.
1 hcal installation and commissioning status pawel de barbaro, vitali smirnov, june 11, 2007.
Arnd Meyer (RWTH Aachen) July 21, 2003Page 1 Data Taking July 14 – 20 Day∫L dt (del)∫L dt (rec)Efficiency Mon 956nb nb % Wed 111nb nb.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jan 25, 2016.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Mar 30, 2015.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Feb 24, 2014.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Sep14, 2015.
G-2 Calorimeter test beam “ T-519 has been assigned beam time is from Thursday July 17 to Monday morning July 27 at ESTB” LCLS is operating lower beam.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Oct 14, 2013.
Minerva Test Beam 2 Status Geoff Savage for the Test Beam 2 Team March 23, /23/2015AEM - Minerva Test Beam 2 Status1.
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Feb 8, 2016.
RICH Readout Plans F. Bucci, M. Piccini on behalf of the RICH WG.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 3, 2013.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Dec 9, 2013.
CMS ROC Report Patricia McBride May 26, 2005.
STATUS OF KLOE F. Bossi KLOE GM, ROMA Nov. 13/14.
LAV front-end and readout status
Open Tasks for PrimEx-II Run
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
B904 Status Report by Fred B.
Presentation transcript:

The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013

MINERvA Shifts Running weekday day shifts for about 5 – 8 hours –Since the CROC-E installation, we had been having experts run the DAQ, but now were are having shifters running the DAQ using Run Control –All FEBs & PMTs (front end boards) operating We will run 24 hour shifts when start we get NuMI beam 2

DAQ Upgrade With old CROCs, the DAQ needed 3 computers. The CROC- E DAQ is fast enough that the DAQ needs only 1 computer –We are taking data with 1 DAQ computer –LI system requires 2 serial ports (2 LI boxes) but the DAQ computer only has one. In the short term will use the 2d DAQ computer, which now does not take data, along with the DAQ computer to configure the LI system In longer term, solution being discussed 3

New DAQ Computers We will be replacing 3 DAQ computers with 4 DAQ computers. –Right now, old DAQ computer in VETO rack takes data We installed 2 new computers in the DAQ rack. –Not turned on, we will get the ORC for turning them on this week. Then, they will be configured to run the DAQ. We will wait until the new computers in the DAQ rack can take data before we install the 2 new computers in the VETO rack. 4

Online Monitoring 4 new computers are ready for the 12 th floor control room –All the online software will be installed on them this week. –We may only use one computer for the online monitoring Online monitoring of PED and LI –The DAQ now takes data so fast that it fills up the online monitoring que This creates a problem for the stand alone PED and LI runs. For the moment we will slow them down –Not a problem with beam data as we only take beam triggers when every 1.7 seconds, eventually 1.3 seconds 5

PMTs Our PMT Box test stand in Lab G is full operational. –Tests cross talk & light tightness of PMT boxes Previously, we pulled tubes off the detector with the HV varying problem. (HV from –Took 3 PMT boxes with this problem & replace the base and inner cables –2 pass test stand QC, third needs further investigation Jun 27, we replaced 2 PMT boxes –Important as training for people to replace PMT boxes on detector. Steve Chappa, Roberto Davila, & Kevin Kuk –Need to finish testing last box to install it Then, use setup to test & repair other PMT boxes 6

Muon Monitor 4, MM 4 The PPD division has given MM 4 electronics rack its ORC –Need to get AD signoff. –With ORC we can power up the crate and try to read it out. It is one of the new SWIC scanners with ethernet readout All the readout & HV cables are installed in the alcove –Not yet cabled up, but will not take long to do this –Before we cable it up we want to finish the leak testing in the gas system in the alcove The ORC required moving some of the gas lines After the gas system is checked we will cable up the system. Check for electronic noise in the system, We have setup the electronics & cabling to hopefully have less noise than MM 1, 2, & 3. 7

MM 4 Gas System The gas system is being built at University of Texas, Austin –Want MM 4 to have same gas system as MM 1, 2, & 3. –3 to 4 weeks to design and manufacture the parts –1 to 2 weeks to install the system, get it working, and start flowing He. –We do not need to get into the Alcove to do this We can test MM 4 with nitrogen, before the gas system is installed –This is how they were tested at Austin. 8